Tender Value
₹5.3 L
EMD Value
₹13,200
Closing Date
7 Sept 2026, 5:00 pm
EXECUTIVE ENGINEER
EE,PMU KOLLAM
Constructing 550m 11kv line and installing 100 kva TR at Ayiravally under Eletrical Section Parippally
2026_KSEB_865326_1
ET No. 13/26-27/ Dtd 13.08.2026
Open Tender
Electrical Works
Service
90 days
Eletrical Section Parippally
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,300
₹13,200
13 Aug 2026
13 Aug 2026
11 Sept 2026
13 Aug 2026
7 Sept 2026
13 Aug 2026
13 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LABOUR | |||||
| 1.01 | (144) Erecting one 100kVA Transformer to existing DP and giving connections,
including loading from TMR/SRS/other
stacking place & unloading at site but
excluding cost for transporting
transformer. | - | No | 7,153 | - |
| 1.02 | (728) Transporting Transformers by hired vehicle to a distance upto 5km and
carrying upto 2 numbers of 63/100/160/250kVA Transformers /
Ring Main Units excluding loading&
unloading charges. | - | Trip | 3,142.26 | - |
| 1.03 | (171) Fitting one Additional 2.4m/3m ChanneL cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | - | No | 564.55 | - |
| 1.04 | (1.87) Additional rate for excavation of one Pit for Coil Earthing in Laterite | - | No | 434.91 | - |
| 1.05 | (726) Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading&
unloading charges. | - | Trip | 3,142.26 | - |
| 1.06 | (729) Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of
63/100/160/250kVA Transformers /
Ring Main Units (Running km). | - | km | 103.5 | - |
| 1.07 | (112) Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in
ordinary soil (as per standards), drawing
sufficient length of GI earthing leads
from F clamp through V cross arm to the
ground for earthing (excluding provision
of earthing). | - | No | 3,274.36 | - |
| 1.08 | (122) Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). | - | No | 4,805.95 | - |
| 1.09 | (132) Additional rate for excavation of Pit for A type pole in Hard Laterite. | - | No | 1,303.68 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tender_doc.pdf
Tender Documents • 0.90 MB
sketch.pdf
Other Document • 0.48 MB
BOQ_1464410.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].