Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹27.6 Cr C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II. | C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II. | L1 | - | |
| 2 | L2₹31.6 Cr+₹4.0 Cr (14.6%)Financial bid opened C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II. | C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II. | L2 | Financial bid opened | |
| 3 | L3₹41.7 Cr+₹14.1 Cr (51.0%) C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II. | C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II. | L3 | - | |
| 4 | - | - | - |
| Sl No | Description | Qty | Unit | Rajiv Aggarwal L3 | Durga Buildwell Pvt. Ltd. L2 | A.K Builders L1 |
|---|---|---|---|---|---|---|
| 1 | As per schedule of quantities | - | - | 11.77 ₹41,70,24,898.35 | -15.2 ₹31,63,97,167.22 | -26 ₹27,61,01,301.58 Lowest |
Tender Value
₹37.3 Cr
EMD Value
₹47.3 L
Closing Date
21 Mar 2024, 3:00 pmClosed
EE(C ), BRPD-I, Chungthang
Executive Engineer
Border Road Project Division-1, CPWD, Chungthang, North Sikkim-737120
C/o High-Altitude Hill road to Indo China Border including Earth Work, Drainage, Protection Work, Culverts, Bridge, Bituminous Surfacing Works and Other Appurtenant Structures from Gurudongmar Bend (Altitude-16614 ft) to Dorjila Base (Altitude-17235 ft) having Length 4.31 km in the state of Sikkim under Phase-II.
70959
01/EE/BRPD-I-07/CE/IBBZ-II/SE/BRPC/EE/BRPD-I/2023-24
OPEN
Civil Works - Roads
NCB
730 days
North District, Sikkim
7 documents required · 7 mandatory
₹47.3 L
Not Applicable
21 Mar 2024
7 Mar 2024
21 Mar 2024
21 Mar 2024
14 Mar 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT01EEBRPD1GB.pdf
document • 23.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .