| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC AYITHARA AYITHARA MAMBARAM KANNUR | KANNUR | KANNUR | KERALA | ₹2.6 L | L1 | Accepted-AOC Lowest rate quoted contractor |
| 2 | L2₹2.6 L+₹1.59 (<0.01%)Rejected-AOC VEENNIROTH HOUSE KUTTIATTOOR PO | ₹2.6 L+₹1.59 (<0.01%) | L2 | Rejected-AOC L2 contractor |
| Sl No | Description | Qty | Unit | Biju T L1 | JAYADEVAN V L2 |
|---|---|---|---|---|---|
| 1.00Barbed wire fencing | |||||
| 1.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 15.95 | Cum | 335.74 ₹5,354.72 Lowest | 335.74 ₹5,354.72 Lowest |
| 1.00 | 4.1.6
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 12.19 | Cum | 7,806.8 ₹95,180.51 Lowest | 7,806.93 ₹95,182.09 |
| 1.00 | 16.15.1
Supplying at site:R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- Charge (cost of earth works in excavation, concrete works in foundation to be paid separately) | 3.48 | Cum | 33,478.37 ₹1,16,504.73 Lowest | 33,478.37 ₹1,16,504.73 Lowest |
| 1.00 | 16.16
Supplying and fixing turn buckles and straining bolts for barbed wire fencing. | 18 | Set | 285.29 ₹5,135.22 Lowest | 285.29 ₹5,135.22 Lowest |
| 1.00 | 16.17.1
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used .With G.I barbed wire | 1,835 | metre | 14.55 ₹26,699.25 Lowest | 14.55 ₹26,699.25 Lowest |
| 1.01 | OD309600/2025-2026
Total station surveying - works includes Fixing of boundaries of the property, preparation of site plan, Contour survey etc. complete. work includes supplying 3 sets hard copies of site & service plan, Contour and soft copies in Pen drive- Plain built up area with hindrance to line of sight due to buildings/structures. | 1.04 | Hectare | 13,070.3 ₹13,593.11 Lowest | 13,070.3 ₹13,593.11 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,562
Closing Date
27 Feb 2026, 5:00 pmClosed
Director, MCC (PGIOSR)
Malabar Cancer Centre (PGIOSR), Thalasssery, moozhikkara, 670105
Barbed wire fencing
2026_MCC_837608_1
MCC/210/2024-SUP-CL
Open Tender
Civil Works - Bridges
Item Rate
90 days
Thalassery, Manjodi
Please refer Tender documents.
5 documents required · 5 mandatory
₹525
Yes
₹6,562
Yes
27 Mar 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
27 Feb 2026
19 Feb 2026
Barbed wire fencing
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.6 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
16.15.1 Supplying at site:R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- Charge (cost of earth works in excavation, concrete works in foundation to be paid separately)
16.16 Supplying and fixing turn buckles and straining bolts for barbed wire fencing.
16.17.1 Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used .With G.I barbed wire
OD309600/2025-2026 Total station surveying - works includes Fixing of boundaries of the property, preparation of site plan, Contour survey etc. complete. work includes supplying 3 sets hard copies of site & service plan, Contour and soft copies in Pen drive- Plain built up area with hindrance to line of sight due to buildings/structures.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
FencingTenderCivil.pdf
Tender Documents • 2.01 MB
BOQ_1410691.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .