| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-AOC | ₹12.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.9 L+₹19,097.33 (1.50%)Rejected-AOC | ₹12.9 L+₹19,097.33 (1.50%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S.NIYAZUDHEEN L1 | SIDDIQUE KANIMUTHU S L2 |
|---|---|---|---|---|---|
| 1.00DRINAGE | |||||
| 1.00 | 2.5.1.A:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By Manual Means (A) Lime Concrete | 11.25 | cum | 998.47 ₹11,232.79 Lowest | 1,000 ₹11,250 |
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 9 | cum | 441.5 ₹3,973.5 Lowest | 445 ₹4,005 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 9 | cum | 9,001.46 ₹81,013.14 Lowest | 9,055 ₹81,495 |
| 1.00 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | 31.05 | cum | 9,514.49 ₹2,95,424.91 Lowest | 9,520 ₹2,95,596 |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 2.04 | tonne | 1,00,437.31 ₹2,05,193.42 Lowest | 1,00,450 ₹2,05,219.35 |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 3 | cum | 9,887.04 ₹29,661.12 Lowest | 9,895 ₹29,685 |
| 2.00ROAD RETARRING | |||||
| 2.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 58.45 | sqm | 316.22 ₹18,483.06 Lowest | 319 ₹18,645.55 |
| 2.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 68.9 | sqm | 409.92 ₹28,243.49 Lowest | 410 ₹28,249 |
Tender Value
₹12.7 L
EMD Value
₹31,778
Closing Date
9 Jul 2026, 1:00 pmClosed
AEE
OFFICE OF EXECUTIVE ENGINEER PMC
GENERAL-PMC/2026/PROJ NO 94 /27 , VELLAN STREET ROADNEAR STADIUM BUS STAND ROAD IN FRONT OF LIONS SCHOOL ROAD RENOVATION WORKS
2026_LSGD_858485_1
1/ AEE/LIDEW/PMC/26-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Palakkad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,778
Yes
13 Aug 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DRINAGE | |||||
| 1.001 | 2.5.1.A:Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (I) By Manual Means (A) Lime Concrete | - | cum | - | - |
| 1.002 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | - | - |
| 1.003 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | - | cum | - | - |
| 1.004 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.005 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | - | tonne | - | - |
| 1.006 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | - | cum | - | - |
| 2ROAD RETARRING | |||||
| 2.001 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | - | sqm | - | - |
| 2.002 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1451283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
affidavit.pdf
Tender Documents • 0.34 MB
sbd_merged_compressed.pdf
Tender Documents • 0.60 MB
epayment.pdf
Tender Documents • 0.34 MB
formoftender.pdf
Tender Documents • 0.34 MB
integritypact.pdf
Tender Documents • 0.33 MB
preliminaryagreement.pdf
Tender Documents • 0.35 MB
BOQ_1451283.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .