Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹60.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹64.7 L+₹4.2 L (6.86%)Admitted-Fee/PreQual/Technical/Finance | ₹64.7 L+₹4.2 L (6.86%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹65.3 L+₹4.8 L (7.88%)Admitted-Fee/PreQual/Technical/Finance | ₹65.3 L+₹4.8 L (7.88%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹66.2 L+₹5.7 L (9.39%)Admitted-Fee/PreQual/Technical/Finance | ₹66.2 L+₹5.7 L (9.39%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹68.3 L+₹7.7 L (12.7%)Admitted-Fee/PreQual/Technical/Finance | ₹68.3 L+₹7.7 L (12.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Dinesh singh panwar L5 | SATENDRA SINGH L2 | kamal singh L3 | sitab singh L4 | Pradeep Aswal L1 | Hemant Singh Negi L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 1,461.34 | Cum | 360.88 ₹5,27,374.22 | 300 ₹4,38,402 | 347.84 ₹5,08,312.51 | 217 ₹3,17,110.78 | 200 ₹2,92,268 Lowest | 370.23 ₹5,41,035.12 |
| 2.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 1,127.74 | Cum | 2,016.48 ₹22,74,070.79 | 1,900 ₹21,42,706 | 1,943.6 ₹21,91,875.46 | 1,900 ₹21,42,706 | 1,500 ₹16,91,610 Lowest | 2,068.72 ₹23,32,977.45 |
| 3.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 | 75.1 | Cum | 6,246.91 ₹4,69,143.09 | 6,190 ₹4,64,869 | 6,021.12 ₹4,52,186.11 | 6,800 ₹5,10,680 | 5,000 ₹3,75,500 Lowest | 6,408.73 ₹4,81,295.59 |
| 4.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. In cement mortar (1:5) | 349.56 | Cum | 4,098.87 ₹14,32,801.7 | 3,950 ₹13,80,762 | 3,950.72 ₹13,81,013.68 | 4,500 ₹15,73,020 | 3,200 ₹11,18,592 Lowest | 4,205.05 ₹14,69,916.44 |
| 5.00 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25 | 38.36 | Cum | 7,723.23 ₹2,96,263.22 | 7,482 ₹2,87,009.52 | 7,021.12 ₹2,69,330.16 | 7,800 ₹2,99,208 | 6,000 ₹2,30,160 Lowest | 7,473.1 ₹2,86,668.29 |
| 6.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 160.82 | Cum | 898.64 ₹1,44,519.45 | 600 ₹96,492 Lowest | 866.16 ₹1,39,295.85 | 600 ₹96,492 Lowest | 750 ₹1,20,615 | 921.92 ₹1,48,263.02 |
| 7.00 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 4.61 | MT | 55,614.4 ₹2,56,382.38 | 65,000 ₹2,99,650 | 53,604.24 ₹2,47,115.55 | 63,000 ₹2,90,430 | 50,000 ₹2,30,500 Lowest | 57,055.01 ₹2,63,023.61 |
| 8.00 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions). | 60 | Nos | 7,345.42 ₹4,40,725.02 | 7,500 ₹4,50,000 | 6,919.92 ₹4,15,195.2 | 7,900 ₹4,74,000 | 6,570 ₹3,94,200 Lowest | 7,365.39 ₹4,41,923.39 |
| 9.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD ttarakhand specifications) | 210 | Cum | 1,318.87 ₹2,76,962.7 | 1,334 ₹2,80,140 | 1,271.2 ₹2,66,952 | 1,250 ₹2,62,500 | 1,200 ₹2,52,000 Lowest | 1,353.03 ₹2,84,137.04 |
| 10.00Construction of {2.00x0.450x0.600} M size parapet in pium in Proportion With M 10 Grade of Concrete in Base including supply of all meterial, labour, T&P etc. Required for proper completion of work. | |||||||||
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
4 Aug 2026, 12:00 pmClosed
EE CD PWD Pabau
EE CD PWD Pabau
Rajya Yozna ke Antargat Janpad Pauri Garhwal ke Vidhansabha Chatra Srinagar ke Thailisain mai Khandgoun to Soloshain Motor Marg ka Nirman karya Second Phase Stage -II
2026_pwd_97787_1
1225/12AC Dated 10-07-2026
Open Tender
Civil Works - Roads
Item Wise
180 days
EE CD PWD Pabau
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
Yes
EE CD PWD Pabau
₹1.6 L
Yes
5 Aug 2026
18 Jul 2026
4 Aug 2026
18 Jul 2026
4 Aug 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 1,461.34 | Cum | - | - |
| 2 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 1,127.74 | Cum | - | - |
| 3 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 | 75.1 | Cum | - | - |
| 4 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. In cement mortar (1:5) | 349.56 | Cum | - | - |
| 5 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25 | 38.36 | Cum | - | - |
| 6 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 160.82 | Cum | - | - |
| 7 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 4.61 | MT | - | - |
| 8 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions). | 60 | Nos | - | - |
| 9 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD ttarakhand specifications) | 210 | Cum | - | - |
| 10Construction of {2.00x0.450x0.600} M size parapet in pium in Proportion With M 10 Grade of Concrete in Base including supply of all meterial, labour, T&P etc. Required for proper completion of work. | |||||
stage.html
html • 0.03 MB
finance_115443.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_115443.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .