Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.9 L
EMD Value
₹33,800
Closing Date
13 Oct 2026, 6:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Upgradation of Existing 15m x 1.3 m span foot bridge to 15 x3.5m Motorable Bridge at Nallah shutain Gagangair Sonamarg-B Block Gund DDC 201
2026_RDPR_326911_1
E NIT No. 113/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
45 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Rural Development and Panchayati Raj
₹33,800
6 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
13 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils | 36.28 | cum | 256.85 | ₹9,318.52 |
| 2 | Provinding and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete | 2.71 | cum | 1,000 | ₹2,710 |
| 3 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:4:8 mix (1cement: 4coarse sand: 8 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 3.82 | cum | 5,202.9 | ₹19,875.08 |
| 4 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:1.5:3mix (1cement: 1.5coarse sand: 3graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job | 29.48 | cum | 9,395.7 | ₹2,76,985.24 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 3,095.4 | kg | 115.35 | ₹3,57,054.39 |
| 6 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6mix (1cement: 3coarse sand: 6graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job with 20% plums | 23.61 | cum | 4,758 | ₹1,12,336.38 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 135.96 | sqm | 286.35 | ₹38,932.15 |
| 8 | Labour charges for dewatering during execution | 1 | job | 25,000 | ₹25,000 |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete. Welded | 5,220 | kg | 138.2 | ₹7,21,404 |
| 10 | Supply and filling of nallah stones/ GSB including carriage complete job | 74.76 | cum | 1,000 | ₹74,760 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_1106959.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .