Tender Value
₹61.8 L
EMD Value
₹61,810
Closing Date
3 Aug 2026, 6:00 pm
Executive Engineer P.H.Works Dn.1, GWSSB, Bhavnagar
Design Construction of clear water sump at Maghariyaa HW pump House at Maghariya/Limda HW/SHW Taluka: Umrala. Dist. : Bhavnagar
325816
04/2026-27
Open
Water Supply/ Sanitation Works
Works
Bhavnagar
1 document required · 1 mandatory
₹2,400
Executive Engineer, P.H. Works Divsion, GWSSB, Bhavnagar
₹61,810
21 Jul 2026
21 Jul 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
Estimated Cost:Rs. Rs
Gujarat Water Supply & Sewerage Board
Volume-III, PRICE BID Umrala RWSS
Bid Documents for Design Construction of clear water sump at
Maghariyaa HW pump House at Maghariya/Limda HW/SHW
Taluka: Umrala. Dist. : Bhavnagar."
Volume-III, PRICE BID Umrala RWSS
Name of Work:- Design Construction of clear water sump at
Maghariyaa HW pump House at Maghariya/Limda HW/SHW
Taluka: Umrala. Dist. : Bhavnagar.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
quoted in Schedule-B only will be considered for price evaluation & shall form
a part of the Contract Agreement.
and evaluation.
(6) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with pro
(7) Each item is to be individually priced online and the amounts shall be added
Schedules of prices shall be left blank except where the item description
requires the item to be priced on "as applicable” basis. The item shall not
be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item
description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The
prices shall allow for all the works covered under the bid and all liabilities
and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the
bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted
for other items.
executed for satisfactory working/safety of the system as specified, will not
be separately paid for by the Employer when executed and shall be deemed
to be already covered by other items and rates listed in the price sheets No
extra payment shall be given for any item which is required to complete
and perform the project.
Volume-III, PRICE BID Umrala RWSS
firm and fixed, during the pendency of the Contract. In case of any
and Schedule-C of the successful bidder shall be corrected accordingly. Only
considered for financial evaluation of the bid.
(10) Schedule ‘D gives the basis of interim payment for construction of works.
(11) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates
shall also be deemed to include any works and setting out that may be
required to be carried out for laying out of all the works involved.
(12) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(14) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(15) The prices quoted shall also include the cost of materials utilized for
(16) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable
access to work sites at his own cost. These accesses will be used by the
other contractors working for GWSSB.
only and the prices shall include all the equipments / materials /
accessories and services required as per the specifications. The bidder shall
(18) 1% of the value of work will be deducted from the Running bill against
labour cess which is non refundable.
(19) Third Party Inspection / CSC agency will be deployed by GWSSB and charges
of the same will be borne by GWSSB.
(20) Any expenditure incurred by inspection/ CSC agency for the work
misinformed by the contractor and charges of inspection/ CSC agency
without any work due to misinformation shall be recovered from the
(21) The prices shall be quoted inclusive of all taxes, royalties and duties
prevailing at the time of submission of the bids. Statutory variation if any
during the currency of contract shall have to borne by the agency which
shall be not reimbursed by the GWSSB.
(22) The rates should be quoted inclusive of GST and all other taxes as per
Volume-I (B), General Conditions of Contract, Clause No.
(23) The rates quoted shall be inclusive of all taxes, duties and GST, also
including of service tax, which shall not be paid extra. The TDS shall be
deducted at source as per provision of IT rules and GWSSB policy.
(24) The Bidders shall have to quote the rates in this tender keeping in view of
the GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
Volume-III, PRICE BID Umrala RWSS
(25) The process requires that the bidder shall quote his price for the work
prices shall remain firm and fix during the entire period of performance of
the contract except price variation allowed for supply of MS/DI/PVC/GI pipe
as per Volume-IB Clause No. 59, General Conditions of Contract.
(26) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on
the basis of work done of individual items and rates quoted against those
particular items only.
(27) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified
in the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution
No. GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from
time to time and remaining amount if any shall be recovered from the final
bill before releasing the security deposit of the work. The contractor shall
furnish the statement showing the quantity of quarried materials / minerals
from whom purchased ( with full address of the seller) and copies of the
bills for purchase to the Executive Engineer of the in charge of the work.
The contractor shall also furnish such additional information as regards
royalty payment to the competent authority.
(28) Agency shall have to take Insurance policy and intimate to GWSSB along
with the evidence within time limit. In case of non compliance entire
responsibility shall be rest with the agency and required amount shall be
recovered from any due amount of the agency.
(29) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(30) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in
the state of Gujarat. For arriving at the difference in procurement prices
due to introduction of GST it will be open for the Board to ask for original
invoices, lorry receipt, weigh bridge slips, payment details and such other
documents as may be required for the purpose.
(31) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly
certified by the competent tax authority. The final decision regarding the
quantum of claim amount to be recovered or reimbursed shall be of the
competent authority of the GWSSB and shall be binding on the contractor.
Signature of contractor Executive Engineer
P.H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID Umrala RWSS
Volume-III, PRICE BID Umrala RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Design Construction of clear water sump at Maghariyaa HW
pump House at Maghariya/Limda HW/SHW Taluka: Umrala. Dist.
including. The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 5 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed
__) for Construction including free trial run for three months or such other sum as
may be ascertained in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID Umrala RWSS
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID Umrala RWSS
NAME OF SCHEME:- Umrala Regional Water Supply Scheme
Design Construction of clear water sump at Maghariyaa HW
pump House at Maghariya/Limda HW/SHW Taluka: Umrala. Dist.
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are to
Sr. Particular Qty. Rate at which the Place of
No. material will be charged Delivery
to the contractor
1. The contractor submitting the tender should see that the rates in Schedule-A are
filled in by the Engineer-in-Charge at the time of issue of tender.
2. Materials to be supplied to the Contractor for work are mentioned in Schedule-A
3. Other pipes jointing material such as twisted hemp yarn bolts, nuts and washer and
various size rubber packing Zink white etc. shall be supplied by the contractor at
his own cost. This shall be of the best quality & get previously approve by the
Engineer-in-Charge.
4. Any additional pipes special not mentioned in Schedule-A but found necessary at
time of execution shall be provided to the contractor at free of cost for labour
5. Contractor shall provide his own arrangement at his own cost for loading, unloading
& transporting safety to the site of work for the materials mentioned in Schedule-A
6. Any materials required for other than labour items mentioned above and materials
is not included in Schedule-A. If such materials available with the department will
be issue in request from the contractor (for use of works under this contract) only at
prevailing market rate or at the depart. Issue rates which is higher plus department
charged liable under the rule in force.
7. Clause No.12.A of B form shall be applicable in case of materials mentioned above
issued free to cost of the contractor for use in the work. The issue rates for free of
cost materials are as under and in case of non-return of surplus materials the
recovery shall be made doubled of the issue rate.
8. The material issued by department for this work and remaining unused material
shall be returned to the department in good and acceptable condition by the
contractor. Any such unused materials not returned by the contractor will be
recovered at the double rate fixed by the department.
9. Contractor shall have to buy and bring ordinary Portland cement as per IS-812-1989
and is 12269-1987 or its latest revision with IS mark and steel from open market and
produce the bill of purchase along with necessary test certificate at the time of
Volume-III, PRICE BID Umrala RWSS
claiming the bill Carting of above materials should be done by contractor at his own
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID Umrala RWSS
Name of Scheme Design Construction of clear water sump at
Maghariyaa HW pump House at Maghariya/Limda HW/SHW
Taluka: Umrala. Dist. : Bhavnagar.
TALUKA: Umrala DISTRICT: Bhavnagar
RECAPITULATION SHEET
Particulars NET COST
Design,Construction of Clear water sump
at Maghriya HW and
1 Design,Construction of pump house at
Maghariya,Limda HW/SHW
Volume-III, PRICE BID Umrala RWSS
Name of work : Design Construction of clear water sump at Maghariyaa HW pump
House at Maghariya/Limda HW/SHW Taluka: Umrala. Dist. : Bhavnagar.
QTY. ITEM RATE PER AMOUNT
ITEM NO :: 01 :: Preparing structural design of RCC Under
Ground / Partially under ground / above high ground level
Reservoir of required capacity as per relevant I.S. standards and
constructing the same, including excavation in all types of soil
strata (including rock) including shoring strutting if required, for
loose soil / to protect from collapse, casting 100 mm thick P.C.C.
levelling course in M-15, Refilling the pit with proper soil and
disposing of the surplus stuff at all lead. Including cement plaster
in CM 1:2 with approved water proofing compound to all over
inside container (i.e. walls, base, top slab/dome bottom etc. all).
Including all types of labour and material charges of lowering,
laying, erecting / hosting and jointing of pipe assembly to inlet,
outlet overflow, washout and bye pass arrangement as per
hydraulic design. Providing and fixing accessories, CI Manhole
frame and cover, water level indicator, adequate cowl type
ventilators or lantern type ventilator with stainless steel jail. RCC
chambers for valves. Providing and applying three coats of
cement paint / snowcem to the out side face of structure. It also
includes satisfactory water tightness test as per relevant I.S.
code and painting name of scheme and capacity on the tank as
per direction of engineer in charge.
01 Cost of 15,00,000 Liters 37,32,363.6600000 Liter
ITEM NO :: 02 :: Designing and constructing R.C.C.
frame structre of pump room with positive suction and
Negative suction
(1) Minimum 15 % opening for ventilation should be
(2) Pump room rolling shutter, door and window of
aliuminium section and window grill of iron should be
provided (included cost).
(3) Plint level of Pump House should be min. 1 meter
(4) cost does not included Foundation for pumping
Volume-III, PRICE BID Umrala RWSS
120.00 (a) At Maghariya Head works Pump House: 12.00 x 10.00 M ith
Gantry structure (Min. Height 4.5 M) Upto 6.00 M (Plinth Level to
Top slab Beam bottom) 15,301.72
40.00 (b) At Limda Sub Head works Pump House: 8.00 x 5.00 M ith
Gantry structure (Min. Height 4.5 M) Upto 6.00 M (Plinth Level to 15,301.72 SqM
Top slab Beam bottom)
I/We am/ are willing to carry out the work at
percent (should be written in figures and words) of the estimated rate mentioned
above. Amount of my/ our tender works out as under.
Executive Engineer
Signature of contractor P. H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID Umrala RWSS
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable only
for the assessment of value of work done for inclusion in any interim certificate for
part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
4. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the
component as related to the total costs of the concerned item as whole. A head
titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by
both the parties.
DEPUTY EXECUTIVE ENGINEER
P.H.S.Sub Division, Umrala
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
PRICE BID.pdf
TECHINCAL SPECIFICATION.pdf
TECHNICAL DATA SHEET.pdf
4. G.S.T. all Circular.pdf
11 .I.P Address GR.pdf
1. SD EMD GR 25-26.pdf
GCC_1.pdf
Maghariya HW DRG.pdf
techanical Bid 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].