Tender Value
₹26.2 Cr
EMD Value
₹14.6 L
Closing Date
26 Aug 2025, 3:00 pmClosed
Carrying out Final Location Survey for (i) New BG Railway Line Projects.(ii)Final Location Survey for construction of Doubling/ Third line/ 3rd& 4thline/Flyover over BILASPUR, RAIPUR & NAGPUR Division area in S.E.C. Railway.
CAO-C-BSP-25-26-07
CAO-C-BSP-25-26-07
Open
24 Months
Bilaspur, Himachal Pradesh
₹0
₹14.6 L
27 Jun 2025
27 Jun 2025
A-Execution of All Works As Detailed In Schedule -1 (Final location
Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signaling works, Electrical works & operating works for Construction of a New line. The details of works to be executed are (i) Annexure- X (for Civil Engineering works). (ii) Annexure-Y (for S&T Engineering works), (iii) Annexure-Z (for Electrical Engineering works) & (iv)Annexure-AA (for) Operating works). Note: (i) For Annexures please refer Notes to Schedule-1 of Chapter-XI of Tender Document. (ii) For Salient Features regarding Execution Plan refer S.No.11 of Chapter-X of Tender Document. (iii) For Payment Schedule Annexure-AB in Notes to Schedule-1 of of Chapter-XI of Tender 1 Document. (iv) Work Orders will be issued from time to time for carrying out FLS work as per the sanction of the Final Location Survey (FLS). Execution of these work orders shall be carried out by the controlling field unit to which the respective FLS work has been allotted by Headquarters. The work order can also be issued for specific items or portions of the work as required. The tenderer shall complete the surveys within the timeline specified below, based on the length of the Final Location Survey. •Work orders for the execution of sanctioned FLS works may be issued either for the entire scope of the contract or for selected items thereof, at the discretion of the Railway. Issuance of work orders up to the full contract value is not guaranteed, and no obligation shall be deemed to exist on the part of the Railway to place work orders for the entire contract amount.
Conducting Final Location Survey including Preparation of DPR, Geotechnical 2 Investigation, Signaling works, Electrical works & operating work for construction of Doubling / Third line / 3rd & 4th line/Flyover. The details of works to be executed are (i) Annexure- X (for Civil Engineering works). (ii) Annexure-Y (for S&T Engineering works), (iii) Annexure-Z (for Electrical Engineering works) & (iv) Annexure-AA (for Operating works) Note: (i) For Annexures please refer Notes to Schedule-1 of Chapter-XI of Tender Document. (ii) For Salient Features regarding Execution Plan refer S.No.11 of Chapter-X of Tender Document. (iii) For Payment Schedule Annexure-AB in Notes to Schedule-1 of of Chapter-XI of Tender Document. (iv) Work Orders will be issued from time to time for carrying out FLS work as per the sanction of the Final Location Survey (FLS). Execution of these work orders shall be carried out by the controlling field unit to which the respective FLS work has been allotted by Headquarters. The work order can also be issued for specific items or portions of the work as required. The tenderer shall complete the surveys within the timeline specified below, based on the length of the Final Location Survey. •Work orders for the execution of sanctioned FLS works may be issued either for the entire scope of the contract or for selected items thereof, at the discretion of the Railway. Issuance of work orders up to the full contract value is not guaranteed, and no obligation shall be deemed to exist on the part of the Railway to place work orders for the entire contract amount.