Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC HALISAHAR RATHTALA G P ROAD P O HALISAHAR NORTH 24 PARGANAS | HALISAHAR | NORTH 24 PARGANAS | WEST BENGAL | 743134 | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.6 L+₹3,625.38 (1.39%)Rejected-Finance SHOP NO 397 2 NO MARKET WARD NO 10 P O P S KALYANI PIN 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.7 L+₹5,738.02 (2.20%)Rejected-Finance 96 A KALYANI SIMANTA P O P S KALYANI NADIA PIN 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | L3 | Rejected-Finance L3 |
Tender Value
₹2.6 L
EMD Value
₹5,216
Closing Date
7 Mar 2026, 4:00 pmClosed
Chairman Kalyani Municipality
Office of the Chairman, Kalyani Municipality
Constructioin of Mukta Manch at Nicher Para, in ward no-03, Under Kalyani Municipality.
2026_MAD_1013758_73
WBMAD/ULB/KM/NIT-17(e) /Dev/2025-2026
Open Tender
CIVIL WORKS
Percentage
90 days
Kalyani Municipality
Please Refer Tender Document
8 documents required · 8 mandatory
₹902
₹5,216
15 Sept 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
7 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1.5 m
Ref. Page -1, Item -2 a), PWD SOR Vol-I w. e. f. 1.11.2017 | 21.36 | %Cum | 11,927 | ₹2,54,760.72 |
| 2 | Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Ref. Page -47, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 | 72.9 | Sqm | 24 | ₹1,749.6 |
| 3 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion
Ref. Page -23, Item -1), PWD SOR Vol-I w. e. f. 1.12.2017 | 5.47 | Cum | 4,630.25 | ₹25,315.89 |
| 4 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
Ref. Page -15, Item -8 a), PWD SOR Vol-I w. e. f. 1.12.2017 | 17.35 | Cum | 5,368.05 | ₹93,135.67 |
| 5 | Brick work with 1st class bricks in cement mortar (1:6)
(b) In Superstructure, Ground floor
Ref. Page -15, Item -8 b), PWD SOR Vol-I w. e. f. 1.12.2017 | 4.8 | Cum | 5,591.05 | ₹26,837.04 |
| 6 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.
(a) With earth obtained from excavation of foundation
Ref. Page - 1, Item 03,a; PWD SOR VOL-I w.e.f. 1.11.2017 | 18.67 | %Cum | 7,754 | ₹1,44,767.18 |
| 7 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Ref. Page -2, Item -4,a), PWD SOR Vol-I w. e. f. 1.12.2017 | 35.79 | %Cum | 93,621 | ₹33,50,695.59 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
Ref. Page -189, Item -1, ii, PWD SOR Vol-I w. e. f. 1.12.2017 | 76.8 | Sqm | 163.24 | ₹12,536.83 |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, window
sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
Ref. Page -192, Item -15 ), PWD SOR Vol-I w. e. f. 1.12.2017 | 35.2 | Sqm | 32.76 | ₹1,153.15 |
| 10 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/Sq.M all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement
(iii) 35 mm. thick
Ref. Page -48, Item -6 ii), PWD SOR Vol-I w. e. f. 1.11.2017 | 49.5 | Sqm | 328.21 | ₹16,246.39 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 6.17 MB
BOQ_2496256.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .