| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-Finance | ₹3.1 Cr | L1 | Accepted-Finance As per financial evulation |
| 2 | L2₹4.3 Cr+₹1.2 Cr (38.3%)Rejected-Finance | ₹4.3 Cr+₹1.2 Cr (38.3%) | L2 | Rejected-Finance As per financial evulation |
| 3 | L3₹4.4 Cr+₹1.3 Cr (43.3%)Rejected-Finance | ₹4.4 Cr+₹1.3 Cr (43.3%) | L3 | Rejected-Finance As per financial evulation |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per technical bid evaluation |
| Sl No | Description | Qty | Unit | M/S MAA BHAWANI CONSTRUCTION L1 | M/S PRABHAT TRADERS L2 | M/s Raja Ram Shukla Contractor L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of R.C.C.work including stacking of dismantl material with all charges etc complete. | 106 | Cum | 502.58 ₹53,273.48 | 400 ₹42,400 Lowest | 400 ₹42,400 Lowest |
| 2.00 | Dismantling of Brick work in cement Mortar including stacking of dismantl material with all charges etc complete. | 437.26 | Cum | 381.96 ₹1,67,015.83 | 350 ₹1,53,041 Lowest | 350 ₹1,53,041 Lowest |
| 3.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. | 2,740.09 | Cum | 60.98 ₹1,67,090.69 | 50 ₹1,37,004.5 Lowest | 50 ₹1,37,004.5 Lowest |
| 4.00 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 172.74 | Sqm | 140.72 ₹24,307.97 | 100 ₹17,274 Lowest | 100 ₹17,274 Lowest |
| 5.00 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 131.38 | Cum | 7,360.88 ₹9,67,072.41 Lowest | 10,000 ₹13,13,800 | 12,000 ₹15,76,560 |
| 6.00 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. | 4,730.44 | Sqm | 683.5 ₹32,33,255.74 | 500 ₹23,65,220 Lowest | 500 ₹23,65,220 Lowest |
| 7.00 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 2,201.99 | Cum | 7,980.07 ₹1,75,72,034.34 Lowest | 11,400 ₹2,51,02,686 | 11,500 ₹2,53,22,885 |
| 8.00 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials, T&P and labour etc complete. | 290.73 | Cum | 8,435.47 ₹24,52,444.19 Lowest | 12,400 ₹36,05,052 | 13,000 ₹37,79,490 |
| 9.00 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. (Reinforcement bar of TATA/SAIL/JINDAL, Fe 415 shall be used only) | 60.45 | MT | 53,356.03 ₹32,25,372.01 Lowest | 80,000 ₹48,36,000 | 85,000 ₹51,38,250 |
| 10.00 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 570 | Hrs | 127.32 ₹72,572.4 | 100 ₹57,000 Lowest | 100 ₹57,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹9.2 L
Closing Date
21 Jul 2026, 2:00 pmClosed
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
Reconstruction of the damaged V.R.B. on the Dohrighat Sahayak Main Canal in District Ballia.
2026_UPIDC_1168611_2
05/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Balllia
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,954
₹9.2 L
Yes
7 Sept 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of R.C.C.work including stacking of dismantl material with all charges etc complete. | 106 | Cum | - | - |
| 2 | Dismantling of Brick work in cement Mortar including stacking of dismantl material with all charges etc complete. | 437.26 | Cum | - | - |
| 3 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. | 2,740.09 | Cum | - | - |
| 4 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 172.74 | Sqm | - | - |
| 5 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 131.38 | Cum | - | - |
| 6 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. | 4,730.44 | Sqm | - | - |
| 7 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 2,201.99 | Cum | - | - |
| 8 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials, T&P and labour etc complete. | 290.73 | Cum | - | - |
| 9 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. (Reinforcement bar of TATA/SAIL/JINDAL, Fe 415 shall be used only) | 60.45 | MT | - | - |
| 10 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 570 | Hrs | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.73 MB
BID02.pdf
Tender Documents • 1.45 MB
BOQ_2192254.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .