Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.5 LAccepted-AOC FD 85 SALT LAKE CITY SECTOR III KOLKATA 700 091 W B | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L1 | Accepted-AOC lowest | |
| 2 | L2₹82.1 L+₹1.5 L (1.90%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L2 | Rejected-Finance 2nd lowest | |
| 3 | L3₹82.6 L+₹2.0 L (2.50%)Rejected-Finance 76 CRIPER ROAD KONNAGAR HOOGHLY | KONNAGAR | HOOGHLY | WEST BENGAL | L3 | Rejected-Finance 3rd lowest |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
19 Jul 2023, 11:00 amClosed
The Executive Engineer, PMD,PHE.Dte
Office of the Executive Engineer Purulia Mechanical Division,PHE.Dte Ranchi Road,Purulia.
Supply and Installation of 4KG/HR Gaseous Chlorination system and Chlorine leak absorption system at Lakshmanpur WTP under Augmentation of Raghunarhpur W/S project with allied works, under PMD, PHE, Dte.
2023_PHED_518531_3
36/ EE/PMD/PHED OF 2022-2023
Open Tender
MECHANICAL
Item Rate
120 days
Purulia
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.8 L
Yes
17 Jan 2025
25 Apr 2023
21 Jul 2023
2 May 2023
19 Jul 2023
2 May 2023
Amount
PART A
Supply delivery of Gaseous chlorination system (1W+1S) capacity 4KG/HR complete accessories,MCC. Detail specification as per BOQ of NIET and as per approved GA drawing by EIC
Cable for gaseous Chlorination system (from PDB to MCC of chlorine pump.):- Supplying 1.1 KV grade 4 core 10 sq. mm XLPE insulated Al. Armoured cable specification as per IS7098
Installation testing and commissioning of above supplied Gaseous chlorination system, All pumping machinery,MCC making masonery/RCC pump motor/MCC based foundation as per departmental approved drawing, suction line, delivery line, common header, valves, including supply and delivery at site as required of all erection materials All size Cable trey,laying of cable through trey within pump house and with 8nos brick protechtion when lay through under ground trench(460mm average width x 760 average depth) with supplying ,cable compression gland,cable lugs socket, ,finishing cable end, MS short piece, Flanges, bends, specials, bolts & nuts, dismantling joint / mechanical joint gasket,rubber insertion,gland packing,grease,construction of masonery pipe support ,valve support,Insulating rubber mat, chequers plate as required,etc all electrical and earthing connection with motors ,pannel etc as required to make installation complete as per direction of EIC. (all materials required for installation is considered, cable trey, compressor glands, connection of earth busbar with equipments others required items to be supplied at the time of installation of above pumping machineries and Trial Operation, maintenance and guarding of the entire New installation for 90 days Painting of installation by anticorrosive primer ,paint complete after dismantling existing old system or installation new system and adjusting space with old system as per site situation and as per direction of EIC)
Supply delivery At WTP as per requirement and direction of EIC Automatic chlorine leak absorption and Scrubber system comprising of:- 1. FRP half hood for chlorine tonner, centrifugal fan, Evoqua make chlorine leak detection unit with two leak sensors, as per SOQ attaced of NIET and as per approved GA drawing by EIC, Perforated GI cable trey as required for installation – 1 lot , Armoured and flexible power and control cable as required for installation, MS & GI supports as required for installation as per direction of EIC.
Installation and commissioning of above supplied Automatic chlorine leak absorption system at WTP with laying all required control cable, power cable, pipe line ,all jointing items, minor electrical items masonery work . l. Positioning of equipment on foundation. 2. Civil construction of foundation. 3. Unloading of equipment at site store. 4. Shifting of equipment from site store to position of installation. 5. Safe custody of materials at site. 6. Construction of shed of leak absorption system with illumination arrangement. 7. Supply of power to MCC. 8. Supply of caustic for commissioning. 9. 90 Daily operation and maintenance after trial run and commissioning. 10. Supply of any materials for tonner manifold as per direction of EIC
Add GST @ 18%
Add CESS @ 1%
EASTERN INDIA SALES AND SERVICE
MAHADEV ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .