| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-Finance D NO 32 1 211 2 BOWDARA ROAD VISAKHAPATNAM 530004 | VISAKHAPATANAM | ANDHRA PRADESH | 530004 | ₹31.8 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹33.0 L+₹1.2 L (3.65%)Rejected-Finance | ₹33.0 L+₹1.2 L (3.65%) | L2 | Rejected-Finance Being Not L1 |
| 3 | L3₹34.2 L+₹2.4 L (7.49%)Rejected-Finance | ₹34.2 L+₹2.4 L (7.49%) | L3 | Rejected-Finance Being Not L1 |
| 4 | L4₹37.1 L+₹5.3 L (16.7%)Rejected-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | ₹37.1 L+₹5.3 L (16.7%) | L4 | Rejected-Finance Being Not L1 |
| 5 | L5₹37.3 L+₹5.4 L (17.1%)Rejected-Finance | ₹37.3 L+₹5.4 L (17.1%) | L5 | Rejected-Finance Being Not L1 |
| Sl No | Description | Qty | Unit | SAI ENGINEERING WORKS L6 | SRI SIDDHI VINAYAKA ENTERPRISES L7 | S.M.Electricals L1 | SRIVALLI ENGINEERS L8 | SREE SHIRIDI SAI ENTERPRISES L3 | bhavani constructions L2 | SRIVEN TECHNOLOGIES L5 | ANAND ENTERPRISES AND ENGINEERS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Material and labour for repairs and overhauling of pumps of following capacities by disconnecting and taking out from the bed, self casting of shaft and body cover refixing the impeller old or new, replacement of worn out bush/ball bearing, replacement of gland packing, studs, bolts etc., reassembling the pump unit, reinstalling its original position by confirming the alignment including painting to pump body with one coat of synthetic enamel paint, testing all as specified and directed. Note :- Impeller required new shall be measured and paid seperately. | |||||||||||
| 1.01 | 3 HP | 1 | Job | 1,250 ₹1,250 | 1,400 ₹1,400 | 1,200 ₹1,200 | 2,050 ₹2,050 | 1,100 ₹1,100 Lowest | 1,500 ₹1,500 | 1,925 ₹1,925 | 4,200 ₹4,200 |
| 1.02 | 5 HP | 2 | Job | 2,400 ₹4,800 | 1,600 ₹3,200 | 1,400 ₹2,800 Lowest | 2,490 ₹4,980 | 2,100 ₹4,200 | 2,300 ₹4,600 | 2,642 ₹5,284 | 5,200 ₹10,400 |
| 1.03 | 7.5 HP | 2 | Job | 2,690 ₹5,380 | 2,000 ₹4,000 | 1,600 ₹3,200 Lowest | 2,999 ₹5,998 | 2,350 ₹4,700 | 2,500 ₹5,000 | 2,888 ₹5,776 | 4,500 ₹9,000 |
| 1.04 | 10 HP | 6 | Job | 3,150 ₹18,900 | 7,500 ₹45,000 | 6,500 ₹39,000 | 3,550 ₹21,300 | 2,450 ₹14,700 Lowest | 3,000 ₹18,000 | 3,744 ₹22,464 | 7,500 ₹45,000 |
| 1.05 | 25 HP | 2 | Job | 7,350 ₹14,700 | 11,000 ₹22,000 | 8,000 ₹16,000 | 7,900 ₹15,800 | 6,950 ₹13,900 Lowest | 7,500 ₹15,000 | 8,233 ₹16,466 | 18,000 ₹36,000 |
| 1.06 | 30 HP | 2 | Job | 8,900 ₹17,800 | 12,000 ₹24,000 | 10,000 ₹20,000 | 10,000 ₹20,000 | 7,950 ₹15,900 Lowest | 9,000 ₹18,000 | 9,488 ₹18,976 | 26,000 ₹52,000 |
| 1.07 | 40 HP | 4 | Job | 9,500 ₹38,000 | 14,000 ₹56,000 | 11,000 ₹44,000 | 11,000 ₹44,000 | 8,850 ₹35,400 Lowest | 10,000 ₹40,000 | 11,250 ₹45,000 | 28,000 ₹1,12,000 |
| 2.00Material and labour for repairs and overhauling of motors of following capacities by disconnecting and taking out from the bed, replacement of worn out bush/ball bearing, lugs, studs, bolts etc., re-installing in it's original position including painting the motor body with one coat of synthetic enamel paint, connecting up, testing all as specified and directed. | |||||||||||
| 2.01 | 2 HP | 2 | Job | 1,700 ₹3,400 | 1,100 ₹2,200 | 800 ₹1,600 Lowest | 1,900 ₹3,800 | 1,200 ₹2,400 | 1,500 ₹3,000 | 2,122 ₹4,244 | 2,500 ₹5,000 |
Tender Value
₹42.2 L
EMD Value
₹84,320
Closing Date
1 Apr 2025, 6:00 pmClosed
GE (I) DM, Visakhapatnam
GE (I) DM, Visakhapatnam
REPAIR MAINTENANCE OF CHILLED WATER/CONDENSER WATER PUMP SETS AT VARIOUS CENTRAL AND PACKAGE TYPE AC PLANTS AND ALLIED WORKS AT NAVAL DOCKYARD, VISAKHAPATNAM UNDER GE (I) DM VISAKHAPATNAM
2025_MES_701042_1
8286/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Naval Dockyard Visakhapatnam
As per tender documents
8 documents required · 8 mandatory
₹500
GE (I) DM, Visakhapatnam
₹84,320
Yes
22 Aug 2025
11 Mar 2025
3 Apr 2025
11 Mar 2025
1 Apr 2025
25 Mar 2025
Amount
Material and labour for repairs and overhauling of pumps of following capacities by disconnecting and taking out from the bed, self casting of shaft and body cover refixing the impeller old or new, replacement of worn out bush/ball bearing, replacement of gland packing, studs, bolts etc., reassembling the pump unit, reinstalling its original position by confirming the alignment including painting to pump body with one coat of synthetic enamel paint, testing all as specified and directed. Note :- Impeller required new shall be measured and paid seperately.
Material and labour for repairs and overhauling of motors of following capacities by disconnecting and taking out from the bed, replacement of worn out bush/ball bearing, lugs, studs, bolts etc., re-installing in it's original position including painting the motor body with one coat of synthetic enamel paint, connecting up, testing all as specified and directed.
Material and labour for disconnecting, taking out the motors of following capactities from the bed, tranportation to workshop and removing the existing winding and rewinding with new super enameled copper wire of same gauge and same number of turns after thorough cleaning of stator body and rotor applying insulating varnish, drying up by heating for improving ohmic valve, reassembling the motor by replacement of both end bearings, including painting with one coat of synthetic enamel paint, reinstalling on its original position connecting up, testing all as specified and directed :-
Supply only Impeller suitable as per existing for following pump sizes : -
Material and labour for taking out defective carbon brush with holder from slipring motor, supply & fix new carbon brush with holder suitable for motor upto135 HP capacity all as specified and directed.
Supply and fix fully automatic star delta starter in sheet metal enclosure/suitable at site , AC 3 Phase, 415 volts 50 Hz of following type and capacity , including necessary control wiring, commissioning including taking out old unserviceable star delta starter all as specified and directed.
20 HP DOL starter
25 HP DOL starter
(c) 30 HP DOL starter
Material and labour for complete Servicing/maintenance of multiple section of LT Panel board in one plant room comprising ACBs/ MCCBs/SDF, busbar chamber, swich gear chamber, metering chamber cable termination / tray chamber after opening front / top / side / back cover by using forced air pressure and brushes, cleaning of all dust/durt, complete cleaning of out side surface of panel board using suitable cleaning agents, tighting of all nuts & bolts of busbar/ switchgear / cable terminals, repair / replacement to defective metering wiring from ACB / MCCB / CT to meter and replacement of defective meters, CTs, indicator lamp, metering terminal blocks, MCB, replacement of defective aluminum cable lugs, nuts-bolts-washers,cleaning of all power contacts, replacement of defective Panel knob/door knob and hinges all as specified and directed
Note:- Panel Meter, indicator lamp, MCB/MCCB and CT will be measured and paid seperately as supply only. required aluminium cable lugs, metering cables and nuts-bolts-washers shall be inclusive of quoted rate.Servicing/maintenance of ACBs shall be inclusive of quoted rate. Items apart from supply only which are required in site are deemed to be included in the quoted rate to make the unit completely functional.Contractor has to deploy manpower at the worksite to attend the breakdown calls received from representatives during two shifts throughout the week including sundays & holidays and on emergencies in third shift shall be attended ,preventive maintenance for the entire duration of contract.It is the contractors responsibility to make the unit functional and sufficient stock of spares shall be maintained to rectify the breakdown within scheduled period.Cleaning,stacking,sorting,handling and upkeeping of maintenance shall be carried out by contractor.
Supply only 100 Amps 36 KA, 4 pole MCCB panel mounted, 50 Hz, 415 V all as specified and directed.
Supply only 160 Amps 36 KA, 4 pole MCCB panel mounted, 50 Hz, 415 V all as specified and directed.
Supply only power contactors suitable for 7.5 TR to 60 TR AC plants all as specified and directed.
Supply only following OLRs over load relays all as specified and directed.
Overload relay 4 - 5.5A /suitable at site
Overload relay 6 - 10 Amps.
Overload relay 10 - 16A.
Overload relay 13 - 21A.
Supply only indication lamps (LED type) red, yellow and blue in colours of 22.5 mm dia to monitor on LT panel board suitable for 240 V AC supply suitable at site all as specified and directed.
Supply & fix medium grade GI pipes as in condenser water line of following sizes with complete fittings as per site requirement and fixed complete to walls and ceilings or laid in floors as per site conditions including taking down the corroded pipes all as specified and directed. Make : - Tata/Jindal /Kalinga
25mm bore
40 mm bore
50 mm bore
80mm bore
100mm bore
125mm bore
150mm bore
Material and labour for taking out damaged insulation portion of existing refrigerant line/chilled water pipe line of following sizes, and cleaning the pipe and insulation with thermocole pipe section TF quality waterproof around pipe and fixed with GI wire mesh, plastering with cement mortar 1:4,15 mm thick, finished smooth and duly painted with two coats of cement based paint and removing dismantled materials from Dockyard premises all as specified and directed.
50mm bore
65mm bore
80mm bore
125mm bore
150mm bore
Supply and fix butterfly valves of following sizes in pipe lines of AC plants with necessary modification to flanges, welding, nuts & bolts as required at site including dismantling existing unserviceable valves all as specified and directed Make : - Audco / Shakti / Zoloto
45mm bore
65mm bore
80mm bore
100mm bore
125mm bore
150mm bore
200mm bore
Supply and fix Ball valves made up of cast iron material of following sizes with necessary modification work as required at site including dismantling existing unserviceable valves complete all as specified and directed. Make:- Audco/Shakti/Zoloto
50mm dia
40mm dia
25mm dia
Preventive maintenance of forced draft FRP cooling towers CMH - 01 AC Plant including repairs and servicing by disconnecting all connections, thorough cleaning of FRP casing header and removing debris stagnated leaves algae etc, PVC fills, strengthening the MS structural supports by necessary welding and support work, replacement of unsv nuts, bolts, washers with new nuts, bolts, washers and greasing/oiling of fan motor and fan bushes/ bearings, checking fan assembly, replacement of existing perished filter screen of out-let connections, arresting leakages from all joints by applying FRP compound, refixing PVC fills old or new, painting with one coat of synthetic enamel paint to steel surfaces all as specified and directed.
Note : - PVC fills,MS supports required new is measured and paid separately)- Contractor has to deploy manpower at the worksite to attend the breakdown calls received from representatives during two shifts throughout the week including sundays & holidays and on emergencies in third shift shall be attended ,preventive maintenance for the entire duration of contract.It is the contractors responsibility to make the unit functional and sufficient stock of spares shall be maintained to rectify the breakdown within scheduled period.Cleaning,stacking,sorting,handling and upkeeping of maintenance shall be carried out by contractor.04 units
All as per item No. 19.00 above, but suitable for CMH - 02.-02units
All as per item No. 19.00 above, but suitable for CMH - 04.-05units
All as per item No. 19.00 above, but suitable for CMH - 06.-02 units
All as per item No. 19.00 above, but suitable for CMH - 09.-07 units
Supply only PVC fills of size 600 x 300 x 150 mm suitable for cooling towers as per site all as specified and directed.
M&L for rotational moulded polyethene water storage tank 1000 Ltr (cylindrical vertical with closed top) hoisted and fixed in position complete all as specified and directed.
M&L for rotational moulded polyethene water storage tank 2000 Ltr (cylindrical vertical with closed top) hoisted and fixed in position complete all as specified and directed.
Material and labour for repairs and overhauling of CT Fan motor by disconnecting and taking out from the original position, replacement of fan blades worn out bush/ball bearing, lugs, studs, bolts etc., re-installing in it's original position including painting the motor body with one coat of synthetic enamel paint, connecting up, testing all as specified and directed.
Material and labour for disconnecting, taking out the CT fan motor from the original position, tranportation to workshop and removing the existing winding and rewinding with new super enameled copper wire of same gauge and same number of turns after thorough cleaning of stator body and rotor applying insulating varnish, drying up by heating for improving ohmic value, reassembling the motor by replacement of both end bearings, including painting with one coat of synthetic enamel paint, reinstalling on its original position connecting up, testing all as specified and directed
M&L for mild steel framed work with ends of bars souldered, welded or reveted or forced into spikes, framed guard bars, ladders,chequred plates framed balusters, walk ways, railings, gates, frame work of tank, valvepit and similar work incl painting with one coat of red oxide primer and one coat of anticorrosive black bituminous paint incl dismantling mild steel work of any description not otherwise specially provided for all as specified and directed.
Earthing complete with copper plate 60×60cm ×3.15mm thick electrode and 20×3mm copper strip as earthing lead, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to 20×3mm copper strip by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion complete all as specified and directed.
Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 20x3mm copper strip complete all as specified and directed.
Labour only for attending electrical breakdowns checking the serviceability,testing,replacement of minor spare parts in starters,panels,pumps, making the unit completely functional complete all as specified and directed for the following sizes:- Note :- The quoted rate is deemed to be include (i) necessary T&P to attend the breakdown. (ii) Necessary labour/trade men for attending emmergency break down . (iii) labour element and spares required for making the unit completely functional such as control wiring,terminal bolts copper cables,lugs etc. (iv) PCC work wherever required
Material & labour for PCC (1:2:4), type B1 (using 20 mm graded stone aggregate) as in foundation filling, repairs to damaged floors including necessary form work and finishing the exposed surfaces of concrete fair and even complete all as specified and directed.
M&L for brick work with subclass `B' bricks, straight or curved on plan exc 6m mean radius, built in 1:6 cement mortar incl dismantling taking out unsv one complete all as specified and directed.
M&L for rendering 10mm thick plaster on fair faces of brick work or concrete surfaces incl dismantling taking out unsv plaster including three coats white wash all as specified and directed.
Supply, assembling, installation, testing and commissioning of induced draft-crossflow design cooling tower with tower and basin, PVC fills, fan motor with impeller, fan motor and gear/direct drive suitable upto 100 TR Air conditioning central plant complete with all necessary accessories all as specified and directed. Make :- Advance/Paharpur/Mihir/Polo
Supply, assembling, installation, testing and commissioning of induced draft-crossflow design cooling tower with tower and basin, PVC fills, fan motor with impeller, fan motor and gear/direct drive suitable upto 50 TR Air conditioning central plant complete with all necessary accessories all as specified and directed. Make :- Advance/Paharpur/Mihir/Polo
Supply, assembling, installation, testing and commissioning of induced draft-crossflow design cooling tower with tower and basin, PVC fills, fan motor with impeller, fan motor and gear/direct drive suitable upto 30 TR Air conditioning central plant complete with all necessary accessories all as specified and directed. Make :- Advance/Paharpur/Mihir/Polo
bhavani constructions (BID ID -3274764)
SREE SHIRIDI SAI ENTERPRISES (BID ID -3274751)
ANAND ENTERPRISES AND ENGINEERS (BID ID -3275078)
SRIVEN TECHNOLOGIES (BID ID -3275040)
SAI ENGINEERING WORKS (BID ID -3274257)
SRI SIDDHI VINAYAKA ENTERPRISES (BID ID -3274338)
SRIVALLI ENGINEERS (BID ID -3274736)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .