Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹25.5 L
EMD Value
₹76,500
Closing Date
30 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PHE Ground Water Division Srg
Executive Engineer PHE Ground Water Division Srg
Construction of 01 No 200 mm Nominal dia Casing ODEX DTH Production Well at APC Manasbal in District Ganderbal.
2024_PHE_253902_1
E. NIT No.14/JS-PHE/GWDS/Mech. of 2024-25
Open Tender
Drilling Works
Item Rate
45 days
Manasbal Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Executive Engineer PHE Ground Water Division Srg
₹76,500
2 Aug 2024
23 Jul 2024
31 Jul 2024
23 Jul 2024
30 Jul 2024
23 Jul 2024
Amount
Cost on account of hiring charges of Hydro geologist/ geologist by the firm for ground water feasibility survey and furnishing of geological report to the department. Job also includes resistivity test by latest equipement for identified site and subsequently furnishing of report to the department before construction of well is taken in hand by the firm.
Boring/Drilling of bore hole of required dia and simultaneous lowering of 200mm nominal dia casing/strainer pipe assembly by DTH/ODEX method prescribed in IS: 2800 (part-I) by fixing case drive shoe including collecting samples from different strata, preapring and submitting strata chat/bore log, including hire and running charges of all equipment tools, plants and machineries required for the job, all complete as per direction of Engineer-in-charge upto 90 m below ground level. (The drilling depth may increase or decrease at the time of execution subject to site conditions) (All kinds of soil (Diameter of casing/Strainer pipe of 200mm)
Boring/Drilling of bore hole of required dia and simultaneous lowering of 200mm nominal dia casing/strainer pipe assembly by DTH/ODEX method prescribed in IS: 2800 (part-I) with upto date amendments by fixing case drive shoe including collecting samples from different strata, preapring and submitting strata chat/bore log, including hire and running charges of all equipment tools, plants and machineries required for the job, all complete as per direction of Engineer-in-charge beyond 90m & upto 170m depth below ground level. (The drilling depth may increase or decrease at the time of execution subject to site conditions) (All kinds of soil (Diameter of casing/Strainer pipe of 200mm)
Supplying, assembling, lowering and fixing in vertical position in bore well, ERW (Electric resistance welded) Fe 410 mild steel screwed and socketed/plain ended casing pipes of required dia, conforming to IS:4270 with up to date amendments of reputed and approved make, including painted with outside surface with two coats of anticorrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths as per direction of Engineer-in-charge. 200 mm nominal dia having wall thickness 7.1mm. with allowable tolerance. The job also includes the slotting of 200mm dia casing pipe by way of making holes of adequate size in order to ensure smooth inflow of water. The slotting is to be done in a uniform pattern. The well casing along with the screen is to be lowered as per the approved drawing and as per the directions of engineer in charge to ensure the right placement of screen in the water aquifer zones below the sub-surface. (The length of the casing pipe may increase or decrease at the time of execution of work as per the approved casing Diagram)
Development to the tube well in accordance with IS: 2800 (Part-1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till well is fully devcloped measuring yield of well by "V" Notch method or any other approved method, measuring static level and draw down etc. by step draw down method collecting water sample & getting tested in approved laboratory. Job includingdisinfection of tube well, all complete including required hire and labour charges of air compressor tool, pumping units, DG sets and other accessories etc. all as per direction of Engineer In-charge. The grouting and sealing of tube well has to be done to ensure safe sanitary conditions. The well casing shall be anchored with ISMC-200 and CC-Block. The CC- block shall be laid of size (6'x5'x3') ft in M-15 mix and slopping away from it to prevent contaminated wtaer flowering back into it. The casing pipe has to be anchored by welding ISMC-200 steel bracing of 05 feet length each (04 No. bracings or channels) with cleats and sufficient welding area, bracing embedded within the CC-Block as per the directions of the site Engineer. The Job includes cost on account of sign board mentioning all the details related to the well and other unforeseen items.
G M ELECTRICAL AND MECHANICAL ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .