Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
4 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Integrated Development of Kedar Gouri Mukteswar Temple Water bodies, Bhubaneswar
2026_ORULB_146660_1
BMC-EE-Tender Cell-93/2026-27 dt. 16.11.2026
Open Tender
Civil Works - Others
Percentage
180 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.2 L
Yes
Office Chamber of EE(Central Tender Cell)
19 Nov 2026
19 Nov 2026
5 Dec 2026
19 Nov 2026
4 Dec 2026
19 Nov 2026
19 Nov 2026 - 25 Nov 2026
25 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone masonary/brick masonary in cement or lime mortar upto 3m height including stacking the useful materials for reuse & removing the debries 50mt lead away from work site as per the direction of the EIC. | 54 | cum | 1,646.62 | ₹88,917.48 |
| 2 | Dismantling & removing cement concrete including stacking the useful for reuse & removing the debries 50 mt lead away from worksite. | 554.4 | cum | 877.16 | ₹4,86,297.5 |
| 3 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead as per the direction of the engineer in charge. | 189 | cum | 1,731.8 | ₹3,27,310.2 |
| 4 | Engaging of 5HP diesel pump etc for dewatering storm water & accumulated storage water from side with all labour charges, cost of fuel, etc complete. | 780 | hr | 200.71 | ₹1,56,553.8 |
| 5 | Earthwork excavation in foundation in all kinds of soil by mechanical means including rough dressing & levelling the bed & depositing the excavated materials away from site with all labour, machinary T&P etc. Complete as per the direction of EIC. | 1,177.2 | cum | 240.75 | ₹2,83,410.9 |
| 6 | Conveyance of excavated materials such as rough stone, metal, khoa, chips, sand, surki, quarry rubbish, moorum, laterite stone, washed gravel, 6 flyash and earth away from the work site by mechanical means including loading and unloading and depositing the same within 5km truck lead as per the direction of the Engineer in charge. | 558.18 | cum | 160.68 | ₹89,688.36 |
| 7 | Filling in foundation with sand well watered & rammed including cost, 7 conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of Engineer in charge. | 245.6 | cum | 588.9 | ₹1,44,633.84 |
| 8 | Cement Concrete (1:3:6) with 4cm size Hard Granite Crusher Broken metal including all cost, conveyance, royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engineer-in-charge. | 165.6 | cum | 6,326.53 | ₹10,47,673.37 |
| 9 | Fabrication and manufacturing of solid precast concrete element with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessoriesfor walls, beams, slabs, stairs, column etc, of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutott/holes of required sizes for services. yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer-in-Charge (Cost of reinforcement, Mechanical, Electrical and Plumbing. inserts will be paid separately). Moulded sculptive makig as per design drawing. | 486.99 | cum | 20,818.79 | ₹1,01,38,542.54 |
| 10 | Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all completeas per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works ie hangers. All work up to fifth floor. (Sor -2022 page no-258) | 486.99 | cum | 2,284.75 | ₹11,12,650.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
DTCN_93.pdf
Tender Documents • 0.93 MB
BOQ_622013.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .