| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC MANALUVILA THUNDIL KAITHACODE KOLLAM | KOLLAM | KOLLAM | KERALA | ₹4.3 L Quoted ₹5.1 L | L1 | Accepted-AOC LowestBidder |
| 2 | L2₹5.2 L+₹10,734.12 (2.09%)Rejected-AOC | ₹5.2 L+₹10,734.12 (2.09%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹5.6 L+₹48,649.39 (9.49%)Rejected-AOC REVATHY KULANGARABHAGOM CHAVARA P O KOLLAM 691583 | KOLLAM | KOLLAM | KERALA | 691583 | ₹5.6 L+₹48,649.39 (9.49%) | L3 | Rejected-AOC Highest Quoted |
Tender Value
₹6.4 L
EMD Value
₹16,100
Closing Date
10 Mar 2026, 6:00 pmClosed
Assistant Engineer
110kV Substation, KSEBL Ayathil, Kollam.
Replacement of existing Megawin make panels with ten panel set and provision of 2 new outgoing 11kV feeders at 33kV Substation Kannanalloor
2026_KSEB_838706_1
1/AE-SS-AYL/2025-26/Dt25.02.26
Open Tender
Electrical Works
Percentage
90 days
33kV Substation, Kannanalloor
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,534
₹16,100
12 May 2026
25 Feb 2026
12 Mar 2026
25 Feb 2026
10 Mar 2026
25 Feb 2026
25 Feb 2026 - 4 Mar 2026
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
14.75 : Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under,including cutting the patch in proper shape, raking out joints and preparing plasteringthe wall surface with white cement based polymer modified self curing mortar, includingdisposal of rubbish, all complete as per the direction of Engineer-In-Charge.
Loading 3x300 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers.
Loading 1x500 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers.
Unloading 3x300 sq. mm XLPE cable from department lorry to substation site and stacking properly without causing any damage to its insulation as per the direction of department officers.
Unloading one set 11kV LA with its insulator stacks, supporting channels, connecting pipes, isolating rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation.
Loading MS / GI materials hard ware fittings of line work and clamps for equipments and bus from the place of its storage to department lorry and make it ready for transportation as per the direction of departmental officers.
Unloading MS / GI materials, hard ware fittings of line work and clamps for equipments and bus from department lorry to substation site and stacking for proper storage as per the direction of departmental officers.
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Erection of 1 No. 11KV LA (station type ) /11KV Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers.
Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable).
Laying 3 x 300 sq mm 11kV XLPE cables in trench including drawing through pipes wherever necessary.
Doing out door/indoor cable termination of 3x300 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket.
Mounting one 3x300 mm2 XLPE outdoor cable termination of structures very carefully without causing any damage to the drilling holes wherever necessary as directed by the departmental officers.
Mounting one 3x300 mm2 XLPE indoor cable termination of structures very carefully without causing any damage to the drilling holes wherever necessary as directed by the departmental officers.
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
Erection of one set 11KV Isolator / AB switch (station class) on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers
Lifting, conveying and Placing in position RCC slabs over cable trench carefully after completing the cable laying work as directed by Departmental Officers at site.
Unpacking at the place of storage and transporting 11KV indoor VCB/SF6 switchgear panel and its accessories to the place of erection and erecting after fixing foundation bolts by chipping concrete wherever necessary, tightening, keeping lines and levels taking all safety precautions including erection of potential transformers as per the direction of departmental officers.
Unmounting carefully 1x500 mm2 outdoor/indoor cable termination from the existing panel and kept carefully without damaging end.
Unmounting carefully 3x 300 mm2 indoor cable termination from the existing panel and kept carefully without damaging end.
Disconnecting of panels,11Kv busbars , opening covers, earthing, inter panel wiring, etc. and making ready for storage to a safe distance as per the direction of departmental officers at site.
Dismantling all size of PVC insulated Copper Control cable 2.5 mm² from terminals and panel Board carefully as per the direction of Departmental Officers at site.
Dismantling all size of PVC insulated Copper Control cable 4 mm² from terminals and panel Board carefully as per the direction of Departmental Officers at site.
Dismantling from the place of Erection and transporting 11Kv indoor VCB/SF6 switch gear panel and its accessories to a safe distance after removing foundation bolts by chipping concrete wherever necessary, loosening, keeping lines and levels taking all safety precautions including dismantling of potential transformers as per the direction of departmental officers at site.
Loading one set 11KV indoor VCB panel with truck from the place of its storage to department lorry using required lifting device, without causing any damage to equipment & its parts.
Unloading one set 11KV indoor VCB panel with its truck from department lorry to substation site by using required lifting device, without causing any damage to equipment parts and lift the same to a pace for safe storage.
Loading 1x500 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers.
Unloading 1x500 sq. mm XLPE cable from department lorry to substation site and stacking properly without causing any damage to its insulation as per the direction of department officers.
Mounting one 1 x 500 mm2 outdoor / indoor cable termination of structures very carefully without causing any damage to the drilling holes wherever necessary as directed by the departmental officers
Uncoiling 4/2 core 2.5sqmm control cable (armored or unarmored) from cable drums and cutting to required length and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
Laying of departmently supplied GI strip/Copper strip of suitable size including cleaning and neatly bending of strips, cutting, as per the direction of the departmental officers.
Interconnection of panels and 11KV bus bars after opening covers, earthing, inter panel wiring, etc. and making ready for commissioning of breaker as per the direction of the departmental officers.
Drilling holes in yard structure
Cutting of steel angle in yard structure erection
Glanding LT / DC cable of various sizes after removing insulation, armour etc. and making necessary holes on gland plates numbering cable etc. complete including supply of gland numbering plate etc.
Laying 1 x 500 sq mm 11kV XLPE cables in trench including drawing through pipes wherever necessary.
Doing out door/indoor cable termination of 1x500 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket.
Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or unarmoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessary and cable marker at both ends of cable as per direction of departmental staff at site.
Doing termination of all sizes of PVC insulated copper control cable 2.5 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site.
Levelling, Cutting and fixing in position departmentally supplied MS Chequered plate 6 mm, 10 mm or 12mm thick in suitable length and width including providing lifting legs and suitable holes for lifting including grinding sides and corners etc. complete.
Cutting of steel angle in yard structure erection
Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally
Welding charge for welding on iron parts using arc welding as per standards
Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by head load and initial lift of 1.5m at each end etc. - By lorry over 9km and upto 10km for Line and Earth Conductor
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1413070.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1413070.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .