Loading
Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹13,600
Closing Date
12 Jun 2026, 10:00 am6d left
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_135727_1
EE-JSD-BGI/2026- 5536-5635 dt. 03/06/2026
Open Tender
Civil Works
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
₹13,600
Yes
5 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads & lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 29.02 | Cum | - | - |
| 2 | Providing & laying cement concrete 1:3:6 (1 cement : 6 sand : 12 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of centring and shuttering in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 3.14 | Cum | - | - |
| 3Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | |||||
| 3.01 | Foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.47 | Cum | - | - |
| 3.02 | Walls (any thickness but not less than 0.10m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level i/c carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 4.65 | Cum | - | - |
| 4Providing and laying cement concrete work 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement in:- | |||||
| 4.01 | Suspended Floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever complete in all respect within all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 1.16 | Cum | - | - |
| 5Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||
| 5.01 | Flat surfaces such as soffits of suspended floor, roofs, landing and the like etc. upto 200 mm thickness i/c carriage of material complete in all respect as per the directions and best satisfaction of the Engineer-in-Charge. | 10 | Sqm | - | - |
| 5.02 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 63.15 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TC.pdf
Tender Documents • 0.27 MB
BOQ_200950.xls
BOQ • 3.44 MB
FORM6_2.pdf
Tender Documents • 0.44 MB
Download all tender documents and submit your bid