Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹56.3 LAccepted-AOC SURYA VIHAR COLONY OPPOSITE CMRI BARTAND DIST DHANAD | 1 | Accepted-AOC L1 | |
| 2 | 2₹50.3 L+₹91,936 (1.86%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
14 Mar 2024, 4:00 pmClosed
Executive Engineer
O/o E.E.D.W. and S Mech Division Dhanbad
Repairing and overhauling of Electro Mechanical Equipments at WTP and Raw water Pumping Plant Jamadova Dhanbad Urban Water Supply Scheme JnNURM under D.W. and S. Mech. Division Dhanbad
2024_DWSD_85083_1
DWSD Dhanbad 11-2023-24 Group-A
Open Tender
Repair and Maintenance Works
Works
90 days
Dhanbad
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹1.1 L
Yes
19 Jul 2024
6 Mar 2024
15 Mar 2024
6 Mar 2024
14 Mar 2024
6 Mar 2024
Amount
Back Wash Pump
Recerculation Pump Set
Cost towards SITC of single/Multi Stage Submersible sludge pump having discharge capacity of 580 LPM agaisnt of total head of 30 m tr coupled with suitable size of submersible motor operated on 415V 3 phase, 50Hz, 2900 RPM etc all complete
Cost for sucketing at terminal ends of 400 mm sq. armoured aluminium cable
Cost for Top up of Transformer oil of recommended quality for Top up in three nos Transformer (Raw water & Clear water)
Overhauling of Motor Control Panel for Raw Water P/p
Cost for overhauling of LT motor control panel and changing of damaged spare such as :- Motor protection relay [ Model 610 of ABB make]
Earth protection Relay
Auxilary Relay Model No. CRM 110 DCA
Cost for overhauling of 225KW soft starter (Jaishree make) and changing of its control set-24 nos and CTM 12 Relay-4nos and doing all line connection and testing on load.
Cost for lifting of 225KW V.T. Pump set, dismantling checking, repairing and changing of damaged spare such as impelelr-2nos, pump shaft of 65 mm dia -1no, line shaft of 50mm dia x 1.5m long -6nos, 450mm dia CI spider bearing with cutless rubber-bush-10 nos, line shaft socket-10 nos, pump bush of gun matle-3nos, neck-ring bush -3nos, HT nut+bolt of 16mm dia-100pcs etc all complete and tesing on load with material and labour charges.
Cost for dismantling 225KW V.T. Motor, heating, varnishing again heating, greasing of bearing assembly of the motor and testing on full load.
Cost for taking out old and damaged bearing and supply and fitting of New bearing No. 29324E-1no and Ball bearing No. 6222 -1no [Make SKF] with material and labour charges.
Repairing of 500 KVAR APFC Panel (Madhav make) 3 step changing of its damaged parts such as auto change over contactor-3 set, capacitor blaster-3nos, auto change over relay-3nos, isolator relay-1set different indicating lamp-6nos P.F. meter-1no etc and doing fresh wiring and testing on load
CHANDRA BROTHERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .