| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.7 LAccepted-AOC | L-1 | Accepted-AOC lowest | |
| 2 | L-2₹18.4 L+₹53,620 (3.00%)Rejected-Finance | L-2 | Rejected-Finance other than lowest | |
| 3 | L-3₹18.5 L+₹65,470 (3.66%)Rejected-Finance | L-3 | Rejected-Finance other than lowest | |
| 4 | L-4₹19.3 L+₹1.4 L (8.08%)Rejected-Finance | L-4 | Rejected-Finance other than lowest |
Tender Value
Refer Docs
EMD Value
₹44,000
Closing Date
18 Oct 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE 969 EWS
GE 969 EWS
REPAIR/MAINT OF CHS HOT WATER PLANTS INCL MANNING AND OPERATION AT BARAMULLA, HAWS AND GULMARG GRN UNDER GE 969 EWS
2021_MES_476607_1
CANO 969/WS- /2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
185 days
Baramulla
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE 969 EWS
₹44,000
Yes
17 Jan 2022
21 Sept 2021
19 Oct 2021
21 Sept 2021
18 Oct 2021
4 Oct 2021
60 days
Amount
Repair/replacement of hot water plant (Location Gulmarg) comprising of 06 number hot water generator of Rapid cool / Western Make capacity 1,00,000-150000 KCal/Hour and central heating system 100000 Kcal/hr for 80 ORS at Gulmarg including replacement of worn out defective parts all as specified & directed.(i) Disconnecting electrically, drain out of water,opening of boiler front cover, blower assembly all accessories & mounting of boiler & taking out helical coil Make : Rapid cool hot water generator 100000 KCal/Hour, cleaning with pressure wash and chemical agent of heating coil, reparing/ replacing refactory and reassembling of the same after replacing fiberglass gasket necessary repairing/replacement of unserviceable parts complete including all minor repairs such as welding, brazing etc all items like nuts, bolt and washers etc all as specified and as directed by Engineer-in-Charge.(a) Opening of the front cover and descaling of helical coil/firetubes with pressure wash all as specified and as directed by Engineer-in-Charge.
(b Fiberglass front cover gasket and waterline gaskets suitable for hot water boiler as per sample complete all as specified and as directed by Engineer-in-Charge.
(c) Refractory plate repair/replacement with ceramic material and compound front side side as complete all as specified and as directed by Engineer-in-Charge.
(d) Digital temperature controller suitable for boiler with sensor complete all as per complete all as specified and as directed by Engineer-in-Charge.
(e) Over- Hauling of burner assembly including replacement/reparing of Fuel pump, motor coupling, ignition electrodes, Sequence controller, fuel nozzzle, soloniod valve, Photo cell, fuel lines and fuel filter suitable for burner complete all as per sample all as specified & directed by Engr-in-Charge.
(f) Repairing/replacement of wiring of panel with spare parts like relay, contactor switch, indication lamp, wire thimble etc complete all as per sample all as specified & directed by Engr-in-Charge.
Supply ,laying and testing steel water tubing medium grade, galvanized with screwed socket joints together with all fittings such as Bends, Elbows, Tees, Short pieces, connectors, back nuts, diminishing pieces, caps, plugs and unions, etc. and fixing complete including short lenghts, cutting, screwing and waste and for making forged and bends on piping as required including taking up or down steel tubing and connections in respect of following sizes:-(a) 20mm dia pipe.
(b) 25mm dia pipe.
M&L for GI gate valves, heavy duty, with iron wheel head, screwed both ends (ISI marked) of size 15 mm dia complete all as specified & directed by Engr-in-Charge.
M&L for GI gate valves, heavy duty, with iron wheel head, screwed both ends (ISI marked) of size 20 mm dia complete all as specified & directed by Engr-in-Charge.
M&L for GI gate valves, heavy duty, with iron wheel head, screwed both ends (ISI marked) of size 25 mm dia complete all as specified & directed by Engr-in-Charge.
M&L for GI globe or gate valves, heavy duty, with iron wheel head, screwed both ends (ISI marked), class-II of size 40mm dia complete all as specified & directed by Engr-in-Charge.
M&L for GI globe or gate valves, heavy duty, with iron wheel head, screwed both ends (ISI marked), class-II of size 50mm dia complete all as specified & directed by Engr-in-Charge.
Supplying laying and testing , connecting, and fixing of polypropylene random copolymer aluminium foiled pipes or composite pipes complete with fittings duly insulated with 13mm thick closed cell elastomeric insulation 30 to 40 kg/cum density for the following sizes of hot glycol fluid pipes:-(a) 32 mm bore OD pipe
(b) 25mm bore OD pipe
M&L for Welding work for MS water storage tank to prevent leakages etc complete all as specified and directed by Engineer-in-Charge.
S&F of themostatic valve suitable for radiators complete all as specified and as directed by Engineer-in-Charge.
Repairing of Pump of capacity 1/2 HP with material like mechinical seal , bearing, washers etc. and Rewinding of electric motor if required complete all as specified and as directed by Engineer-in-Charge.
Repairing/Rewinding of Pump of capacity 3 HP with material like mechinical seal , bearing, washers etc. and Rewinding of electric motor if required complete all as specified and as directed by Engineer-in-Charge.
Repairing/Rewinding of Pump of capacity 5 HP with material like mechinical seal , bearing, washers etc. and Rewinding of electric motor if required complete all as specified and as directed by Engineer-in-Charge.
S&F 2000 ltrs capacity Rotational moulded polyethylene in white coloured three layered, PUF insulated ISI Marked water storage tanks (cylindrical vertical with closed top), hoisted and fixed in position incl provision of in & out connections complete all as specified and as directed by Engineer-in-Charge.
M&L for topping up of glycol concentrate along with the necessary additives and inhabittor in cognition and supplied in barrels,The mixture freezing temperature should be -30 Degree complete all as specified and as directed by Engineer-in-Charge.
Manning and operation of 2 x hot water boiler installation (Location Near HQ Coy & Power House) MES No. 06Y/7025/HW/08 & 06Y/7026/HW/08 respectively, comprising of 01 number each hot water generator of Rapid cool capacity 1,00,000 KCal/Hr with all safety devices/ accessories and mountings etc (16 Hrs in two shifts i.e. two shifts of eight hours) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, all as directed. Note: The contractor has to employ 01 (one) FGM per shift of 8 (eight) hours for 2 (two) shifts (i.e. total 2 FGM per day for two shifts) for carrying out the duties all as directed by Engr-in-Charge.The shift hours shall be decided by the Engineer-in-Charge as per requirement.The contractor shall not have any claim what so ever on this account. Both HWP are within 200 mtrs distance.
Manning and operation of central heating installation No. 01 (Location new 80 ORs building HAWS) comprising of 03 numbers generator of WESTHERM capacity 2,50,000 K Cal/Hr with all safety devices accessories and mountings etc (16 Hrs in two shifts i.e. in two shifts of eight hours each) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, all as directed. Note: The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours for 2 (two) shifts (i.e. total 2 FGMs per day for two shifts) for carrying out the duties all as directed by Engr-in-Charge.The shift hours shall be decided by the Engineer-in-Charge as per requirement. The contractor shall not have any claim what so ever on this account.
Manning and operation of hot water boiler installation (Location Near 15 GARH Rif) MES No. 06Y/7029/HW/08 comprising of 01 number hot water generator of Rapid cool capacity 1,50,000 K Cal/Hr with all safety devices accessories and mountings etc (16 Hrs in two shifts i.e. in two shifts of eight hours each) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, all as directed. Note: The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours for 2 (two) shifts (i.e. total 2 FGMs per day for two shifts) for carrying out the duties all as directed by Engr-in-Charge.The shift hours shall be decided by the Engineer-in-Charge as per requirement. The contractor shall not have any claim what so ever on this account.
Manning and operation of 1 x CHS (Location Arty Bde) ,comprising of 01 number each hot water generator of Rapid cool capacity 1,00,000 K Cal/Hr with all safety devices/ accessories and mountings etc (16 Hrs in two shifts i.e. in two shifts of eight hours each) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc. Complete all as specified and directed by Engr-In-Charge. Note : (a) The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours for 2 (two) shifts (i.e. total 2 FGM per day for two shifts) for carrying out the duties. Shift Hrs shall be decided by Engineer-in-Charge and the contractor shall not have any claim what so ever on this account. (b) Weekly off to workers shall be given and cost of reliver is deemed to include in quoted rate.
S&F in replacement of Balance valve 3" dia complete all as per sample and as specified & directed by Engr-in-Charge.
S&F in replacement flange rubber gasket as per sample complete all as specified and as directed by Engineer-in-Charge.
S&F in replacement fuel pipe of CHS as per samplecomplete all as specified and as directed by Engineer-in-Charge.
S&F in replacement oil filter of CHS as per sample complete all as specified and as directed by Engineer-in-Charge.
S&F in replacement Air release valve 1" dia of CHS as per sample and directed by Engr-in-Charge.
S&F in replacement Burner air motor suitable for 11,00,000 K Cal/Hr CHS complete all as specified and as directed by Engineer-in-Charge.
S&F in replacement Glycol Circulator pump suitable for 11,00,000 K Cal/Hr CHS or as per sample complete all as specified and as directed by Engineer-in-Charge.
S&F in replacement of Swing motor of Fan Coil unit suitable for 11,00,000 K Cal/Hr CHS complete all as specified and as directed by Engineer-in-Charge.
S&F Boiler smoke seamless pipe 6mm thick to withstand high temperature and high pressure including all accessories complete all as specified and as directed by Engineer-in-Charge.
S&F in replacement 25 mm dia 3-layer PP-R Polypropylene random copolymer) concealed pipes SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings fixed complete to walls, ceilings or in floors etc all as directed by engineer-in-charge.
M/S GHULAM RASOOL LONE AND SONS
M/s SONA ULLAH LONE AND SONS
M/S KULBIR SINGH SODHI AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .