| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.7 L+₹16,318.64 (1.12%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.6 L+₹1.1 L (7.24%)Rejected-Finance | L3 | Rejected-Finance IIIrd lowest | |
| 4 | L4₹17.2 L+₹2.6 L (18.2%)Rejected-Finance | L4 | Rejected-Finance IVth lowest |
Tender Value
₹15.6 L
EMD Value
₹39,054
Closing Date
6 Jul 2022, 3:00 pmClosed
Executive engineer
PWD Buildings division kottayam
GENERALIHRD202122Construction of Retaining wallIHRD202122Construction of Retaining wall for IHRD Polytechnic College Poonjar KottayamGeneral Civil Work
2022_PWD_492392_2
PWD/BLDG/3281/2022-2023
Open Tender
Civil Works - Buildings
Item Rate
180 days
Poonjar
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹39,054
Yes
3 Nov 2022
23 Jun 2022
8 Jul 2022
23 Jun 2022
6 Jul 2022
23 Jun 2022
Amount
Detail Estimate
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD28975/2021-2022:Dry rubble masonry with hard stone in foundation and plinth using departmental rubble available at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD28980/2021-2022:Labour charge for chiseling, breaking and making to rubble with the Hard rock boulders available at site including stacking at site in standard heaps for measurement as per the direction of Engineer-in- charge including all machinery and labour, sundries etc.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
TOJU JOSEPH
ABRAHAM JOSEPH
Robin Joseph
Bidder Name
stjudepoonjar
ABRAHAM JOSEPH
Robin Joseph
TOJU JOSEPH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .