Tender Value
₹10.3 L
EMD Value
₹10,279.11
Closing Date
3 Oct 2026, 2:30 pm6d left
Administrative Officer
Landscaping and creation of Garden at Gujarat Bhawan, Chanakyapuri, New Delhi during 2026- 27
348078
RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Open
Administration - Horticulture, Grass cutting, Tree planting
Works
Delhi
12 documents required · 11 mandatory · 1 optional
₹900
Resident Commissioner, Government of Gujarat, New Delhi
₹10,279.11
23 Sept 2026
23 Sept 2026
23 Sept 2026
2 Oct 2026
23 Sept 2026
Name of Work: Landscaping and creation of Garden at Gujarat Bhawan, Chanakyapuri, New Delhi during 2026-
GOVERNMENT OF GUJARAT
OFFICE OF THE RESIDENT COMMISSIONER,
GUJARAT BHAWAN, 11 KAUTILYA MARG CHANAKYAPURI,
NEW DELHI -110021
Sr No Section Description Page No
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Technical Specification
7 Section -6 Form of Bid
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
11 Section -10 Documents to be furnished by Bidder
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
INVITATION FOR BID
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
NATIONAL COMPETITIVE BIDDING
1. T h e Office of the Resident Commissioner, Government of Gujarat
invites bids for the construction of works detailed in the table. The bidders may submit bids for any or all of the following works.
Package No. Name of work Approximate value of works Bid security Cost Period of completion Class of Registration /
(Rs.) (EMD) (Rs.) of document Category of
Garden at Gujarat Bhawan, commencement
Chanakyapuri, New Delhi
2. Prospective / Interested bidder may download the Bid Documents from websitehttps://tender.nprocure.com free of cost till the Time and Date as
mentioned on online NIT at website https://tender.nprocure.com
(A) The concerned Contractor/bidder shall submit the certificate of registration or renewal receipt as approved contractor in “Gujarat Bhawan” office of
the Resident commissioner, Govt. of Gujarat, 11 Kautilya marg chanakyapuri, New Delhi -
(B) The Contractor registered outside Gujarat shall apply for getting registered himself in CPWD/MES/Railways/DDA/MCD/NDMC or any other State or
central Government organization registered under appropriate horticulture category and having similar work experience before the date of
submission of Tender. The proof of the application for the registration shall have to be attached with the Tender online.
(C) The Contractor registered in CPWD/NDMC/Railway and other State Govt. equivalent to class of Gujarat mentioned above, will be eligible to quote
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee/ Tender Fee through Demand D r a f t /Bank pay order from
any Schedule Bank in favour of ‘Resident Commissioner, Government of Gujarat, New Delhi’. Once the Bid is received online, Bid Document / Tender
Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid Security / EMD shall be submitted in electronic format
through online (by scanning) while uploading the bid, this submission shall mean that bid document / tender fee and BidSecurity / EMD has
been received. Accordingly, the offer of only those shall be opened whose Bid Document / Tender Fee and Bid Security / EMD have been received
electronically. However, for the purpose of realization of Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original through
R.P.A.D. /Speed Post/ Courier) only so as to reach to office of Administrative Officer, Gujarat Bhawan, New Delhi within 7 Days from the last day of
bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in original to Executive Engineer / Tender Inviting Authority by
bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the online NIT at websitehttps://tender.nprocure.com in the presence of
the bidders or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids will be opened on the next working day at the same time and
5. A pre bid meeting will be held on 00.00.2026 at 12.00 hrs. at Office of Administrative Officer, Gujarat
Bhawan to clarify the issues and to answer questions on any matter that may be raised at that stage as stated in clause 9.2 of ‘instructions to Bidders’ of
the bidding documents.
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be rounded off to the next thousand rupees.(The Validity of
EMD should be 165 days from the date of uploading of BG/FDR documents on e-tendering website).
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the tender submission date and time. After the tender submission
date and time, the bidder cannot modify / edit / withdraw their submitted offer in any case. No written or online request in this regard shall be
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of submission of Bids, will not be considered or accepted.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
D. The cost incurred by the contractor for this offer for clarification or attending discussion, conferences or site visits will not be reimbursed by the
Employer or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the format given in the checklist /qualification document / tender
I. It is mandatory for the bidders to supply each and every information as asked strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result indisqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the
past, it shall not be deemed to be a ground / reason for not giving required information for this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation of this bid. The Government will not ask for any other information,
unless it is found absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
INSTRUCTIONS TO BIDDERS (ITB)
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Table of Clauses
Section 1: Instructions to Bidders
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Page No. Page No.
A. General D. Submission of Bids
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
1. Scope of Bid 9 19. Sealing & Marking of Bids
2. Source of Funds 9 20. Deadline for Submission of
3. Eligible Bidders 9 21. Late Bids
4. Qualification of the 9 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 11 E. Bid Opening and Evaluation
7. Site Visit 11 23. Bid Opening
24. Process to be Confidential
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding Documents 12 26. Examination of Bids and
Determination of Responsiveness
9. Clarification of Bidding 12 27. Correction of Errors
10. Amendment of Bidding 13 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 14 F. Award of Contract
13. Bid Prices 14 31. Award Criteria
14. Currencies of Bid and Payment 15 32. Employer’s Right to Accept
any Bid and to Reject any or all Bids
15. Bid Validity 15 33. Notification of Award and
Signing of Agreement
16. Bid Security 15 34. Performance Security
17. Alternative Proposals By Bidders 16 35. Advance Payment and Security
18. Format and Signing of Bid 16 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer Gujarat Bhawan, Office of the Resident Commissioner, New Delhi invites bids for the Construction of works “Landscaping and creation
of Garden at Gujarat Bhawan, Chanakyapuri, New Delhi during 2026-27.” detailed in the table given in IFB. The bidders may submit bids for any or all
of the works detailed in the table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.)
are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat /Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a statement that the Bidder is neither associated, nor has been
associated, directly or indirectly, with the consultant or any other entity that has prepared the design, specifications, and other documents for the Project
or being proposed as Project Manager for the Contract. A firm that has been engaged by the Employer to provide consulting services for the preparation
or supervision of the works, and any of its affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a preliminary description of the proposed work method and schedule,
including drawings and charts, as necessary. The proposed methodology should include a program of construction backed with equipment planning and
deployment duly supported with broad calculations and quality assurance procedures proposed to be adopted justifying their capability of execution and
completion of work as per technical specifications, within stipulated period of completion.
4.5 QUALIFICATION CRITERIA:
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/ fail criteria regarding the Applicant’s general and particular
experience, personnel and equipment capabilities and financial positions, as demonstrated by the applicant’s responses in the forms attached to the
letter of application ( specified requirement for joint ventures are given under para 4.6 below ) Subcontractors experience and resources shall not be
taken in to account in determining the applicants compliance with the qualifying criteria To qualify for more than one contract, the applicant must
demonstrate having experience and resources sufficient to meet the aggregate of the qualification criteria for each contract given in paragraphs 4.5.4,
4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
Applicant should indicate actual figures of costs and amount for the works executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the above enhanced multiplying factors will not be applied. Instead, the
current market exchange rate (State Bank of India BC Selling rate as on the last date of submission of the bid) will be applied for the purpose of
conversion of the amount in foreign currency into India rupees.
4.5.3 General Experience.
The tenderers should have experience of having successfully completed similar works (Landscaping and creation of Garden) last Five (5) years ending previous
day of last date of submission of tenders and should fulfil any one of the followings:-
Minimum amount of work Done for one similar work is 40 % of estimated amount of tender.
For these, a certificate from the employers shall be submitted along with the application incorporating clearly the name of the work, contract value, billing amount,
date of commencement of works, satisfactory performance of the contractor and any other relevant information from an officer not below rank of Executive
Engineer or equivalent.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major equipment to attain the completion of works in accordance with the
prescribed construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their bid, a detailed construction planning and methodology supported with
layout and necessary drawings and calculations to allow the employer to review their proposals. The numbers, types and capacities of each
plant/equipment shall be shown in the proposals along with the cycle time for each operation for the given production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets (aggregate of working capital, cash in hand and uncommittedbank
guarantees/Solvency) and / or credit facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must demonstrate the soundness of the applicant’s financial position, showing long –
term profitability including an estimated financial projection for the next two years If necessary, the employer will make inquiries with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting from contracts completed or under execution by him over the
last five years. A consistent history of awards against the Applicant or any partner of a joint venture may result in failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to bedisqualified if they have:
Made misleading or false representation in the forms, statements submitted, and / or Record of poor performance such as abandoning the work,
rescinding of contract for which the reasons are attributable to the non – performance of the contractor; consistent history of litigation awarded against the
applicant or financial failure due to bankruptcy. The rescinding of contract of a joint venture on account of reasons other than non – performance, such as
Most Experienced partner of joint venture pulling out, court directions leading to breaking up of a joint venture before the start of work, which are not
attributable to the poor performance of the contractor will, however, not affect the qualification of the individual partners.
4.5.11 Even though the bidders meet the above qualifying criteria, they are subject to be disqualified if they have:
- Made misleading or false representation in the forms, statements and Attachments the submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted unreasonably high bid prices and could not furnish rational justification to
5 One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or participates in more than one bid (other than as a subcontractor or in cases
of alternatives that have been permitted or requested) will cause all the proposals with the bidder’s participation to be disqualified.
6 Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid, and the Employer will in no case be responsible and liable for
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine the Site of work and its surrounding and obtain all information that
may be necessary for preparing the Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
B. BIDDING DOCUMENTS
8 Content of Bidding Documents
8.5 The set of bidding documents comprises the documents listed below and addenda issued in accordance with Clause 10:
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the bidder in compliance to section 2 will be prepared by him and furnished
as Volume- V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract, contract data, forms, terms, technical specifications,
bill of quantities, forms, Annexes and drawings in the Bid Document. Failure to comply with the requirements of Bid Documents shall be at the bidder’s
own risk. Pursuant to clause 26 hereof, bids which are not substantially responsive to the requirements of the Bid Documents shall be rejected.
9 Clarification Bidding Documents
9.5 A prospective bidder requiring any clarification of the bidding documents may notify the Employer in writing or through E-mail at the Employer’s address
indicated in the invitation to bid. The Employer will respond to any request for clarification which he received earlier than 15 days prior to the deadline
for submission of bids. Employer’s response will be published on website including a description of the enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which will take place at the address, venue, time and date as indicated in
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying thesource of enquiry) and the responses given will be published without delay
on the tender website i.e. https://tender.nprocure.com. Any modification of the bidding documents listed in sub-Clause 8.1 which may become necessary
as a result of the pre-bid meeting shall be made by the Employer exclusively through the issue of an Addendum pursuant to Clause 10 and not through
the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of abidder.
10 Amendment of Bidding Documents
10.5 Before the deadline for submission of bids, the Employer may modify the bidding documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into account in preparing their bids, the Employer may, at his discretion,
extend as necessary the deadline for submission of bids, in accordance with Sub-Clause 20.2 below.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
C. PREPARATION OF BIDS
11 Language of the Bid
11.5 All documents relating to the bid shall be in the English language.
12 Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause8.1) shall be in two separate parts:
Part I shall be named “Preliminary Stage” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section-2
(iv) Any other information pursuant to Clause 4.5 of these instructions
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
(v) Undertaking that the bid shall remain valid for the period specified in Clause15.1
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e. preliminary as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.5 The Contract shall be for the whole works as described in Sub-Clause 1.1, based onthe priced Bill of Quantities submitted by the Bidder.
13.6 The bidder shall fill in rates and prices and line item total (both in figures and words) for all items of the Works described in the Bill of Quantities along with
total bid price (Both in figures and words). Items for which no rate or price is entered by the bidder will not be paid for by the Bill of Quantities.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
13.7 All duties, taxes, and other levies including GST payable by the contractor under the contract, or for any other cause shall be included in the rates, prices
and total Bid Price submitted by the Bidder.
13.9 The rates and prices quoted by the bidder are subject to adjustment during the performance of the Contract in accordance with the provisions of Clause
of the Condition of Contract (Irrespective of the time limit and Bid Amount)
14 Currencies of Bid and Payment
14.5 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All payments shall be made in Indian Rupees.
15 Bid Validity
15.5 Bids shall remain valid for a period of not less than 90 days after the deadline date forbid submission specified in Clause
15.6 In exceptional circumstances, prior to expiry of the original time limit, the Employer may request that the bidders may extend the period of validity for a
specified period. A bidder may refuse the request without forfeiting his bid security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his security for a period of the extension, and in compliance with Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in column 4 of the table of IFB for this particular work. This Bid security
shall be in favor of Employer as named in Appendix and may be in one of the following forms;
a. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank approved by the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building Department or (2) Gujarat Bhawan, office of the Resident
commissioner, Govt. of Gujarat, New Delhi. Exemption Certificate is applicable only when Registration Certificate of Appropriate Class and
Category of Approved Contractors is required as eligible criteria of bidder.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
16.2. Fixed Term Deposit (and other instruments having fixed validity) issued as surety for the bid shall be valid for 45 days beyond the validity of the bid i.e.
total validity of 120+45 = 165 Days.
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the
Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed the Agreement and furnished the required Performance
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bidvalidity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will beintimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited and his tender will be rejected. Punitive action will be
taken on such contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D, Dt.08/06/2018).
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding documents, including the conditions of contract (including mobilization
advance or time for completion), basic technical design as indicated in the drawing and specifications. Conditional offers or alternative offers will not be
considered further in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of these Instructions to bidder as the “Preliminary Stage“ and
“Financial Bid” in separate parts to be uploaded.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
D. SUBMISSION OF BIDS
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
19. Deadline for Submission of the Bids
19.1. Complete Bids must be received online by the Employer at the tender website specified above not later than the date indicated in appendix.
19.2. The Employer may extend the deadline for submission of bids by issuing an amendment in accordance with Clause 10, in which case all right and
obligation of the Employer and the bidders previously subject to the original deadline will then be subject to the new deadline.
20. Modification and Withdrawal of Bids
20.1. Bidders may modify or withdraw their bids online before the deadline prescribed in Clause 20 or pursuant to Clause
20.2. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.3. Withdrawal or modification of a bid between the deadline for submission of bidsand the expiration of the original period of bid validity specified in
Clause 15.1 above or as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security pursuant to Clause
21. Bid Opening
E. BID OPENING AND EVALUATION
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
23.1 The Employer will open all the Bids received including modifications made pursuant to Clause 22, in the presence of the Bidders or their representatives
who choose to attend at time, date and the place specified in Appendix in the manner specified in Clauses 20 and 23.3, In the event of the specified date
of Bid opening being declared a holiday for the Employer, the Bids will be opened at the appointed time and location on the next working day.
23.3. The “Preliminary Stage” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished does not conform to the amount and validity period as specified in the
invitation for bid (ref. Column 4 and paragraph 3), and has not been furnished in the form specified in Clause 16, the financial bid will not be opened.
23.4. At the time of opening of “Financial Bid”, the names of the bidders were found responsive in accordance with Clause 23.3 will be announced. The bids of
only these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount and such other details as
only these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount and such other details as
the Employer may consider appropriate, will be announced by the Employer at the opening.
23.5. At the time of opening of “Financial Bid”, the names of the bidders were found responsive in accordance with Clause 23.3 will be announced. The bids of
only these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount, and such other details as
only these bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount, and such other details as
the Employer may consider appropriate, will be announced by the Employer at the opening.
23.6 In case bids are invited for more than one package, the order for opening of the “Financial Bid” shall be in order of Estimated amount of Bids from
highest to lowest.
23.7 The Employer shall prepare minutes of the Bid opening, including the information disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids and recommendations for the award of a contract shall not be
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
disclosed to Bidders or any other persons not officially concerned with such process until the award to the successful Bidder has been announced. Any
effort by Bidder to influence the Employer’s processing of Bids or award decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his discretion, ask any Bidder for clarification of his Bid, including
breakdowns of unit rates. The request for clarification and the response shall be in writing or by e- mail, but no change in the price or substances of the
Bid shall be sought, offered, or permitted except as required to confirm the correction of arithmetic errors discovered by the Employer in the evaluation of
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matterrelating to his Bid opening to the contract is awarded. If the Bidder wishes
to bring additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bidcomparison or contract award decision may result in the
rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Preliminary Stage", the Employer will determine whether each Bid (a) meets the eligibility criteria defined in Clause 3 and
4; (b) has been properly signed; (c) is accompanied by the required securities and; (d) is substantially responsive to the requirements of the Bidding
document. During the detailed evaluation of the “Financial Bid”, the responsiveness of the bids will be further determined with respect to the remaining
bid conditions, i.e., priced bill of quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms, conditions and specifications of bidding documents, without material
deviation or reservation. A material deviation or reservation is one (a) which affects in any substantial way the scope, quality, or performance of the
Works; (b) which limits in any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would affect unfairly the competitive position of other Bidders presenting
substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by theEmployer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
27. Evaluation and Comparison of Financial Bids
27.1. The Employer will evaluate and compare only the Bids determined to be substantially responsive in accordance with Sub-Clause 26.2.
27.3. The Employer reserves the right to accept or reject any variation or deviation. Variation and deviations and other factors, which are in excess of the
requirements of the Bidding documents or otherwise result in unsolicited benefits for the Employer, shall not be taken in to account in Bid evaluation.
27.4. The estimated effect of the price adjustment conditions under Clause 47 of the Conditions of Contact, during the period of implementation of the
Contract, will not be taken in to account in Bid evaluation.
27.5. If the Bid of the successful Bidder is seriously unbalanced in relation to theEngineer’s estimate of the cost of work to be performed under the contract
the Employer may require the Bidder to produce detailed consistency of those prices with the construction methods and schedule proposed. After
evaluation of the price analyses, the Employer may require that the amount of the performance security set forth in Clause 34 be increased at the
expense of the successful /bidder to a level sufficient to protect the Employer against financial loss in the event of default of the successful Bidder under
27.6. A bid which contains several items in the bill of Quantities which are unrealistically priced low and which cannot be substantiated satisfactorily by the
bidder may be rejected as non-responsive.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
F. AWARD OF CONTRACT
28. Award Criteria
28.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which is the lowest evaluation in any of the packages opened earlier
than the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid capacity is less than the evaluated bid price, even if the said bid is the
lowest evaluated bid. The contract will in such cases be awarded to the next lowest bidder at his evaluation bid price.
29. Employer’s Right to Accept any Bid and to Reject any or all Bids
29.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid, and to cancel the Bidding process and reject all Bids, at any time
prior to the award of contract, without thereby incurring any liability to the affected bidder or Bidder or any obligation to inform the affected Bidder or
Bidders of the grounds for the Employer’s action.
30. Notification of Award and Signing of Agreement
30.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to expiration of the Bid validity period by cable, telex or
facsimile confirmed by registered letter. This letter (hereinafter and in the condition of contract called the “Letter of Acceptance”) will state the sum that the
Employer will pay the Contractor in consideration of the execution, completion, and maintenance of the Works by the Contractor as prescribed by the
Contract (hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the furnishing of a performance security in accordance with the
provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the successful Bidder. It will be signed by the Employer and to the successful
Bidder, within 28 days following the notification of award along with the Letter of Acceptance. Within 21 days of receipt, the successful Bidder will sign the
Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer will promptly notify the other Bidders that their Bids have
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
been unsuccessful.
31. Performance Security
31.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall furnish to the Employer an irrevocable and unconditional
guarantee from a Bank in the form set forth in Section 8 (the “Performance Security”) for an amount equal to 5% (five percent) of its Contract Price. In
case of bids mentioned below, the successful Bidder, along with the Performance Security, shall also furnish to the Authority an irrevocable and
unconditional guarantee from a Bank in the same form given at Section 8 towards an Additional Performance Security (The “Additional Performance
Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but upto 20% of the Estimated Project Cost, then the Additional
Performance Security shall be calculated @ 20% of the difference in the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus
10% of the Estimated Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the Estimated Project Cost, then the Additional Performance Security
shall be calculated @ 30% of the difference in the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects Liability Period and the Additional Performance Security shall be
valid beyond 28 (twenty-eight) days of Project Completion Date.
31.2. If the performance security is provided by the successful Bidder in the form of a Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and acceptable to the Employer. As per GoG Finance Department’s Circular
No. FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest amendment.
31.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause 34.1 shall constitute sufficient grounds for cancellation of the award and
forfeiture of the Bid Security.
32. Corrupt of Fraudulent Practices
32.1. The Employer will reject a proposal if it determines that the Bidder recommended for award has engaged in corrupt or fraudulent practices in completing
for the contract in question and will declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract with National
Highways Authority of India/ State PWD and any other agencies, if it at any time determines that the firm has engaged in corrupt or fraudulent practices in
completing for the contractor, or in execution.
32.2. Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the Conditions of Contract.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
APPENDIX TO ITB
Clause Reference With respect to Section –I
1. The Name of the Employer is Gujarat Bhawan office of the Resident [ Cl.1.1]
Commissioner, Govt. of Gujarat, New Delhi.
2. The last five years.
3. Deleted [Cl.4.5.3 (a)]
4. Value of Work is Rs. 10,27,911/-
6. The pre-bid meeting will take place at 00.00.2026 [Cl. 9.2.1]
7. The technical bid will be opened at the office of Administrative Officer,
Gujarat Bhawan, New Delhi
On dated 00.00.2026 at 15.00 hrs.
8. Address of the Employer: Gujarat Bhawan, Office of the Resident
Commissioner, Govt. of Gujarat, New Delhi.
10. The bid should be submitted latest by As stated on online NIT [Cl. 20.1 & 20.2]
11. The bid will be opened at …………………………… As stated on [Cl. 23.1 ]
12. Th Bank Draft in “favor of office of the Resident Commissioner,
Govt. of Gujarat, New Delhi”
13. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common
base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025 -2026
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they propose to use on the work.
Sr. Plant or Machinery Location Age of Machinery Make Capacity Approximate Value Remark
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
QUALIFICATION INFORMATION
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the purpose of post qualification as provided for in Clause 4 of the
Instruction to Bidders. This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder (Attach Copy)
Place of registration Principal place of business
Power of attorney of signatory of Bid (Attach)
1.2 Total value of Civil engineering
constructions Works performed in 2025-2026
the last five years (in Rs. Lakhs)
1.3 Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place & State Contract No. Name Value Contract Stipulated Period of Completion Value Anticipated of completion
of works & Address of (Rs. Cr) of Works* remaining to be completed
Employer (Rs. Cr)
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.4 Availability of key items of Contractors Equipment for carrying out the works (Ref. Clause 4.5.5). The Bidder should list all the information requested
Item of Equipment Requirement Availability Proposals Remarks
NO Capacity Owned/ Leased to be procured Nos/. Age/ Conditions (from whom to be
Capacity purchased
1.5 Qualifications and experience of key personnel required for administration and execution of the contract.Attach biographical data. Refer also to Sub
Clause 9.1 of the Conditions of Contract.
Year of experience in
Position Name Qualification Year of Experience (General) the proposed
Project Manager
1.6 Proposed sub-contract and firms involved
Sub-Contractor (Name &
Sections of the works Value of Sub- Contractor Experience in similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/ building electrification works.
1.7 Financial reports for the last five years: balance sheets, profit and loss statements, auditors’ reports (in case of companies/corporations), etc. List them below and
1.8 Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them below and attach copied documents.
1.9 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who may provide references if contacted by the Employer.
1.10 Information on Litigation history in which the Bidder is involved.
Other Party (ies) Employer Cause of Dispute Amount Remarks showing Present Status
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to Bidders. (Name of Consultant engaged for project preparations is
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
1.13 Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the
Bidding documents. (Refer ITB Clause 4.1)
2. Additional Requirements
Bidders should provide any additional information required to fulfill the requirements of Clause 4 of the Instructions to the Bidders, if
* Fill the name of Consultant
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. _______________________________________ is a reputed company with a good financial standing.
If the contract for the work, namely ________________________________ is awarded to the above firm, we shall be able to provide overdraft/credit facilities to the
Rs. ________________ to meet their working capital requirements for executing the above during the contract period.
Senior Bank Manager
Address of the Bank
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
1. I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of Government of Gujarat/Government of India/any Board or Corporation
under Government of Gujarat/Government of India nor any contract awarded to us for such works have been rescinded, during last five years prior to
the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the Department to verify this statement or regarding any (our)
competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information may be requested, and agrees to furnish any such information at the
request of the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
I, the undersigned do hereby undertake that our firm M/s………………………………………………………..………………………….. would invest a minimum cash up to 25% of the
value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
SAMPLE FORMAT FOR ANNUAL TURNOVER CERTIFICATE
(REGARDING TOTAL VALUE OF CIVIL ENGINEERING CONSTRUCTION WORKS PERFORMED IN THE LAST FIVE YEARS)
(CLAUSE 4.5.3 (a) OF ITB & Clause 1.2 of Q.1)
This is to certify that we have verified Books of Account of M/s. _________________________________
PAN No._____________________, Address : _______________________________________________ has registered as Civil Construction Firm and
achieved the following Gross Annual Turnover from Construction Activity for Last five financial years is as under:
Civil Other Gross
Sr.No. Financial Year Engineering Construction Business Turnover Annual Turnover
works Turnover (in Rs) (in Rs) including GST (in Rs)
We have verified the above facts and figures from the Audited Books of the Firm or the Audited Balance
sheet and other relevant authentic records of the firm, for the last five financial years and certify the same as True.
(Signature & stamp of the Chartered Accountant)
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
In above Form, the details given in above form is given in any other format butcontaining a, b & c in same wording then the format shall be considered for
If any tender is to be opened between 1st April and 30th September, then their provisional certificate of previous financial year shall be considered for evaluation.
CONDITIONS OF CONTRACT
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Conditions of Contract
Table of Contents
A General Page No. D. Cost Control
1 Definitions 33 37 Bill of Quantities
2 Interpretation 34 38 Changes in the Quantities
3 Language and Law 35 39 Variations
4 Engineer’s Decisions 35 40 Payments for Variations
5 Delegations 35 41 Cash Flow Forecasts
6 Communications 35 42 Payment Certificates
7 Sub-Contractors 35 43 Payments
8 Other Contractors 35 44 Compensations Events
9 Personnel 36 45 Tax
10 Employer’s & Contractor Risk 36 46 Currencies
11 Employers Risks 36 47 Price Adjustment
12 Contractor’s Risk 36 48 Retention
13 Insurance 36 49 Liquidated damages
14 Site Investigations Reports 37 50 Bonus
15 Queries about the Contract 37 51 Advance Payment
16 Contractors to Construct the works 37 52 Securities
17 The Works to be Completed By 37 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 37 54 Cost of Repair
20 Discoveries 38 E. Finishing the Contract
21 Possession of the Site 38 55 Completion
22 Access to the Site 38 56 Taking Over
23 Instructions 38 57 Final Account
24 Disputes 38 58 Operating and Maintenance manuals
25 Procedure for Disputes
26 Deleted 39 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 40 62 Release from Performance
28 Extensions of the Intended completion date
29 Deleted 40 F. Special Conditions of
30 Delays Ordered by The 40 63 Labour
Engineer 64 Compliance with labour regulations
31 Management Meetings 41 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
CONDITIONS OF CONTRACT
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute, complete and maintain the Workstill the completion of
Defects Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to the Employer and includes Technical and Financial
The Contract Price is the price stated in the Letter of Acceptance and thereafter as adjusted in accordance with the provisions of the
Contract.Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent person appointed and notified to the contractor to act in
replacement of the Engineer) who is responsible for supervising the Contractor, administering the Contract, certifying payments due to the Contractor,
issuing and valuing Variations to the Contract, awarding extensions of time, and valuing the Compensations Events.
While dealing with the financial approval and items like extra items, quantity variations and other such proposals involving the finance where the terms
should mean the Competent Authority under the organization having competency to deal with and approve such cases.
Equipment is Contractor’s machinery and vehicles brought temporarily to the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the Contractor shall complete the Works. The Intended Completion Date is
specified in the Contract Data. The Intended Completion Date may be revised only by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical, electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents and are factual interpretive reports about the surface and
subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when theContractor shall commence execution of the works. It does not necessarily
coincide with any of the Site Possession Dates.
A S u b c o n t r a c t o r is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the Contractor which are needed for construction or installation of
A V a r i a t i o n is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also means female or neuter and the other way around. Heading
have no significance. Words have their normal meaning under the language of the Contract unless specifically defined. The Engineer will provide
instructions clarifying queries about Conditions of Contract.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
2.2 If sectional completion is specified in the Contract Data, references in the Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to the Completion Date and Intended Completion date for the whole
2.3 The documents forming the Contract shall be interpreted in the following order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of theContract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual matters between the Employer and the Contractor in the role
representing the Employer. The Engineer shall obtain approval of Competent Authority if needed as per Delegation of Powers of Office of the
Resident Commissioner .
5.1 The Engineer may delegate any of his duties and responsibilities to other people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6.0 Communications
6.1 Communications between parties which are referred to in the conditions are effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7.0 Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in contract data, with the approval of the engineer but may not assign
the Contract without the approval of the Employer in writing. Subcontracting shall not alter the Contractor’s obligations. Sub-contracting of
supply or specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the part of work to be subcontracted.
8.0 Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public authorities, utilities and the Employer between the dates given in
the Schedule of other Contractor. The Contractors shall as refer to in the Contract Data, also provide facilities and services for them as described
in the Schedule. The employer may modify the schedule of other contractors and shall notify the contractor of any such modifications.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in the Contract Data to carry out the
functions stated in the Schedule or other personnel approved by the Engineer. The Engineer will approve any proposed replacement of key
personnel only if their qualifications, abilities, and relevant experience are substantially equal to or better than those of the personnel listed in the
9.2 If the engineer asks the Contractor to remove a person who is a member of the Contractor Staff or his work force stating the reasons the
Contractor shall ensure that the person leaves the Site within seven days and has no further connection with the work in the Contract.
10.0 Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks, and the Contractor carries the risks which these Contracts states
are Contractors risk.
11.0 Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they directly affect the execution of the Works, the risks of war,
hostilities, invasion, act of foreign enemies, rebellion, revolution, insurrection or military or usurped power, civil war, riot commotion or disorder
(unless restricted to the Contractor’s employees), and contamination from any nuclear fuel or nuclear waste or radioactive toxic explosive.
12.0 Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and death which arise during and in consequence of the performance of
the Contract other than the excepted risks are the responsibility of the Contractor.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer for the Engineer’s approval before the Start Date. All
such insurance shall provide for compensation to be payable in the types and proportions of currencies required to rectify the loss or damage
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
13.3 If the Contractor does not provide any of the policies and certificatesrequired, the Employer may affect the insurance which the Contractor should
have provided and recover the premiums the Employer has paid from payments otherwise due to the Contractor or, if no payment is due, the
payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14.0 Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15.0 Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16.0 Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the specification and Drawings.
17.0 The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall carry out the Works in accordance with the programme
submitted by the Contractor, as updated with the approval of the Engineer, and complete them by the Intended Completion date
18.0 Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility fordesign of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or permanent work are subject to prior approval by the Engineer
before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
20.0 Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly discovered on the site is the property of the Employer. The contractor is
to notify the engineer of such discoveries and carry out the Engineer’s instructions for dealing with them.
21.0 Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If possession of a part is not given by the date stated in the Contract
Data the Employer is deemed to have delayed the start of the relevant activities and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not handed over to the Contractor, then contractor/ Employer may
fore-close the contract. Contractor/Employer has to foreclose the work within 30 days after lapse of 25%-time limit and after 30 days foreclosure
option will be closed.
22.0 Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the Engineer access to the Site, to any place where work in connection with
the Contract is being carried out or is intended to be carried out and to any place where materials or plants are being manufactured/ fabricated/
assembled for the works.
23.0 Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works which comply with the applicable laws where the site is located.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to the office of the Administrative Officer , Gujarat Bhawan within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any party
can refer the matter for conciliation within 15 days from the decision given by such Competent Authority.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of theCompetent Authority, both the parties have to
refer to the Office of the Resident Commissioner, Govt. of Gujarat, New Delhiconcern for the conciliation process.
25.0 Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure stated in the Special Conditions of Contract.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
B. TIME CONTROL
26.1 Within the time stated in the Contract Data the Contractor shall submit to the Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along with monthly cash flow forecast.
26.2 An update of the Programme shall be a programme showing the actual progress achieved on each activity and the effect of the progress achieved
on the timing of the remaining work including any changes to the sequence of the activities.
26.3 The Contractor shall submit to the Engineer, for approval an updated programme at intervals no longer than the period stated in the Contract data.
If the Contractor does not submit an updated programme within this period, the Engineer may withhold the amount stated in the Contract data from
the next payment after the date on which the overdue programme has been submitted.
26.4 The Engineer’s approval of the programme shall not alter the Contractor’s obligations. The Contractor may revise the programme and submit it to
the Engineer again at any time. A revised programme is to show the effect of Variations and Compensations events.
27.0 Extension of the Intended Completion Date
27.1 The Engineer shall extend the Intended Completion Date if a compensation Event occurs or a Variation is issued which makes it impossible
for completion to be achieved by the Intended Completion Date without the Contractor taking steps to accelerate the remaining work and which
would cause the Contractor to incur additional cost.
27.2 The Engineer shall decide whether and by how much to extend the Intended Completion Date within 35 days of the Contractor asking the
Engineer for a decision upon the effect of a compensation event or Variation and submitting full supporting information. If the Contractor has failed
to give early warning of a delay or has failed to cooperate in dealing with a delay, the delay by this failure shall not be considered in assessing the
new Intended Completion Date.
27.3 The Engineer shall within 14 days of receiving full justification from the contractor for extension of Intended Completion Date refer to the Employer
his decision. The employer shall in not more than 21 days communicate to the engineer the acceptance or otherwise of the Engineer’s decision. If
the employer fails to give his acceptance, the Engineer shall not grant the extension and the contractor may refer the matter under Clause
28.0 Delays Ordered by the Engineer
28.1 The Engineer may instruct the Contractor to delay the start or progress of any activity within the works.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
29.0 Management Meetings
29.1 Either the Engineer or the Contractor may require the other to attend a management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in accordance with the early warning procedure.
29.2 The Engineer shall record the business of management meetings and is to provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
30.0 Early Warning
30.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely future events or circumstances that may adversely affect the
quality of the work, increase the Contract price or delay the execution of works. The Engineer may require the contractor to provide an estimate of
the expected effect of the future event or circumstance on the contract price and completion date. The estimate is to be provided by the Contractor
as soon as reasonably possible.
30.2 The Contractor shall cooperate with the Engineer in making and considering proposals for how the effect of such an event or circumstance can be
avoided or reduced by anyone involved in the work and in carrying out any resulting instruction of the Engineer.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
C.QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
33.1 : Defect liability period :
The contractor shall be responsible to make good and remedy at his own expense any defect which may develop or may be noticed before the
period mentioned hereunder from the certified date of completion. The Engineer in charge shall give the contractor a notice in writing about the
defects and the contractor shall make good the same within 15 days of receipt of the notice. In the case of failure on the part of the contractor, the
Engineer- in-charge may rectify or remove or re-execute the work at the risk & cost of the contractor. The Engineer-in-charge shall be entitled to
appropriate the whole or any part of the amount of security deposit towards the expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under….
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put tender), the period shall be 12 (Twelve) months from the certified
date of completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be 36 Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be 4 years or elapse of 4 monsoon period following date of possession of building taken
over by user agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009, PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No.TNC/ 10/ 2016/ Clause 17A (Correction/(1)C Dated 12/05/2016]
1. If the engineer instructs the Contractor to carry out a test not specified in the Specification to check whether any work has a Defect and the test
shows that it does, the Contractor shall pay for the test and any samples. If there is no defect the test shall be a Compensation Event.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of the defects Liability Period, which begins at Completion and is
defined in the contract data. The Defects Liability Period shall be extended for as long as Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the Engineer’s notice, the Engineer will assess the cost of having the
Defect corrected, and the Contractor will pay this amount.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
37. Bill of Quantities
D. COST CONTROL
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
37.1 The bill of Quantities shall contain items for the constructions, installation, testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is paid for the quantity of the work done at the rate in the Bill of
Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the original specifications, drawings, designs and instructions that may
appear to him to be necessary or advisable during the progress of the work and the contractor shall be bound to carry out the work in accordance
with any instruction in this connection which may be given to him in writing signed by the Engineer and such alteration shall not invalidate the
contract and any additional work which the contractor may be directed to do in the manner above specified as part of the work shall be carried out
by the contractor on the same conditions in all respects on which he agreed to do the main work and at the same rate as are specified in the
tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the Contractor.
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is specified in this contract, then such class of work shall be carried
(i) At the rate derived from the item within the contract which is comparable to the one involving additional or altered class of work; where there are
more than one comparable items, the item of the contract which is nearest in comparison with regard to class or classes of the work involved shall
be selected and the decision of the Superintending Engineer as to the nearest comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out at the rate entered in the Schedule of Rates of the
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
for the year in which the tender was received, increased or decreased by the percentage by which the tender amount is more or less as compared
to the amount arrived at the rates in the “Schedule of Rates” of the Division in the year in which the tender was received. If the Schedule of rates of
the Division does not contain all the items, the percentage increase or decrease of the tender shall be calculated considering such items which
were included in the “Scheduled Rates” of the division for the year and for materials consumed on such item the rate to be charged would be the
basic rate taken into account for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall be carried out at the rate decided by the competent
authorities on the basis of detailed rate analysis after hearing the contractor before a Committee of two Superintending Engineers stationed at the
same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of the Division is ordered to be carried out before the rate
is agreed upon, then the contractor shall within seven days of the date of receipt by him of the order to carry out the work, inform the Engineer-in-
charge of the rate, which it is his intention to charge for such class of work and if the Engineer in charge does not agree to this rates, he shall by
notice in writing be at liberty to cancel his order to carry out such class of work and arrange to carry it out in such manner as he may consider it
advisable, provided always that if the contractor shall commence work or incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the rate as aforesaid according to such rate or rates as shall be fixed by the
Engineer-in-charge after obtaining approval of the Competent Authority if needed as per delegation of Powers of Gujarat Bhawan, Office
of the Resident Commissioner, Govt. of Gujarat, New Delhi. In the event of the dispute, the decision of theCompetent Authority of Gujarat
Bhawan, Office of the Resident Commissioner shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications recommended by the contractor and accepted
by the competent authority, the alternation above referred to shall be within the scope of such designs, drawings and specifications appended to
The time limit for the completion of the work shall be extended in the proportion that the increase in the cost occasioned by alterations bears to the
cost of the original work and the certificate of the Engineer-in-charge as to such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an updated cash flow forecast.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated value of the work completed less the cumulative amount
certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and certify the amount to be paid to the Contractor after taking in to
account any credit or debit for the month in question in respect of materials for the
works in the relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or reduce the proportion of any item previously certified in any certificate in
the light of later information.
43.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms of the contract and taxes at source, as
applicable under the law. The Employer shall pay the Contractor the amounts certified by the Engineer within 28 days of the date of each
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to the Contractor will be made by the Employer. Hence, it is the
responsibility of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid by the Employer and shall be deemed covered by other rates and
prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site Possession date stated in Contract data to the Contractor.
44.2 In case of compensation event occurs and it prevents the work being completed beyond the Intended Completion Date then Authority will approve
EOT with eligible contractual price escalation.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of bid submission also including GST. However, any
subsequent changes in the tax structure by Government after due date of bid submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding changes occurred in the tax structure after bid submission. If the
contractor fails to provide such information and if any financial obligation may arise due to change in tax structure, same will be recovered from the
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
46.2 To the extent that full compensation for any rise or fall in costs to the contractor is notcovered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed to include amounts to cover the contingency of such other rise or fall in
47.1 The Employer shall retain from each payment due to Contractor the proportion stated in the Contract Data until Completion of the whole of
47.2 On Completion of the whole of the Works half the total amount retained is repaidto the Contractor and half when the Defects Liability Period has
47.2 On Completion of the whole of the Works half the total amount retained is repaidto the Contractor and half when the Defects Liability Period has
passed and the Engineer has certified that all Defects notified by the Engineer to the Contractor before the end of this period have been corrected.
47.3 On completion of the whole works, the contractor may substitute retention money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the Employer under the provision of this clause, Employer shall
consider the said request of the Contractor provided that the refund hereunder shall be made in tranches of not less than 1% (One Percent) of the
Contract Price and Contractor furnishes an irrevocable and unconditional Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to 60 day beyond the scheduled / extended Defects Liability Period. On
completion of the whole works, the contractor has however an option to submit a fresh irrevocable and unconditional Bank Guarantee for an
amount equal to 5% of the total value of work executed substantially in the format of Bank Guarantee
for Performance Guarantee enclosed with SBD and valid up to 60 days beyond the Defect Liability Period and yet refund the Retention Money
Bank Guarantee submitted for refund of Retention Money.
48. Liquidated Damages
48.1 The Contractor shall pay liquidated damages to the Employer at the rate per day stated in the Contract Data for each day that the Completion Date
is later than the Intended Completion Date (for the whole works or the milestone as stated in the contract data). The total amount of liquidated
is later than the Intended Completion Date (for the whole works or the milestone as stated in the contract data). The total amount of liquidated
damages shall not exceed the amount defined in the Contract Data. The Employer may deduct liquidated damages from payment due to the
Contractor. Payment of liquidated damages does not affect the Contractor’s liabilities.
48.2 If the Intended Completion Date is extended after liquidated damages have been paid, the Engineer shall correct any overpayment of liquidated
damages by the Contractor by adjusting the next payment certificate. The Contractor shall not be entitled for any interest on the over payment
calculated from the date of payment to the date of repayment.
48.3 If the contractor fails to comply with the time for completion as stipulated in the tender, then the contractor shall pay to the employer the relevant
sum stated in the Contract Data as Liquidated damages for such default and not as penalty for everyday or part of day which shall elapse between
relevant time for completion and the date stated in the taking over certificate of the whole of the works on the relevant section, subject to the limit
stated in the contract data.
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve the contractor from his obligation to complete the works on from any
other of his obligations and liabilities under the contract.
48.4 If, before the Time for Completion of the whole of the Works or, if applicable any Section, a Taking Over Certificate has been issued for any part of
the Works or of a Section, the liquidated damages for delay in completion of the remainder of the Works or of that Section shall, for any period of
delay after the date stated in such Taking-Over-Certificate, and in the absence of alternative provisions in the Contract, be reduced in the
proportion which the value of the part so certified bears to the value of the whole of the Works or Section,as applicable. The provisions of this Sub-
clause shall only apply to the rate of liquidated damages and shall not affect the limit thereof.
49.1 The performance Security (including additional security for unbalanced bids) shall be provided to the Employer no later than the date specified in
the Letter of Acceptance and shall be issued in an amount and form and by a bank or surety acceptable tothe Employer, and denominated in
Indian Rupees. The performance Security shall be valid until a date 60 days from the date of expiry of Defects Liability Period and the additional
security for unbalanced bids shall be valid until a date 28 days from the date of issue of the certificate of completion.
50. Cost of Repairs.
1. or damage to the Works or Materials to be incorporated in the Works between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages arises from the Contractor’s acts or omissions.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
E. FINISHING THE CONTRACT
51.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the works and the Engineer will do so upon deciding that the work
52. Taking Over
52.1 The Employer shall take over the Site and the Works within seven days of the Engineer issuing a certificate of Completion.
53. Final Account
53.1 The Contractor shall supply to the Engineer a detailed final account of
the total amount that the Contractor considers payable as full and final settlement of all claims under the Contract for items before the end of the
the total amount that the Contractor considers payable as full and final settlement of all claims under the Contract for items before the end of the
Defects Liability Period. The Engineer shall issue a Defect Liability Certificate and certify any final payment that is due to the Contractor within
days of receiving the Contractor's account if it is correct and complete. If it is not, the Engineer shall issue within 56 days a schedule that states the
scope of the corrections or additions that are necessary. If the Final Account is still unsatisfactory after it has been resubmitted, the Engineer shall
decide on the amount payable to the Contractor and issue a payment certificate, within 56 days of receiving the Contractor’s revised account.
53.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and savings in final account is observed, the Engineer/Employer
shall be at liberty to restrict the final payment of BOQ items to the lowest amount evaluated of the bids considering the final quantities and the
rates quoted including the rebates if any. Payment of variation items shall however be made at the rates approved by the Employer, within 90 days
from the physical completion of work.
54. Operating and Maintenance Manuals
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
54.1 If “as built” drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the
54.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated in the Contract data,
or they do not receive the Engineer’s approval, the Engineer shall withhold the amount stated in the Contract Data from payments due to the
55. Termination
55.1 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental breach of the Contract.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
55.2 Fundamental breaches of Contract include, but shall not be limited to thefollowing:
(i) The contractor stops work for 28 days when no stoppage of work is shown on the current programme and the stoppage has not been authorized by
(ii) The Engineer instructs the Contractor to delay the progress of the Works and the instructions is not withdrawn within 28 days;
(iii) The Employer or the Contractor is made bankrupt or goes into liquidation other than for a reconstructions or amalgamation
(iv) A payment certified by the Engineer is not paid by the Employer to the Contractor within 56 days of the date of the Engineer’s certificate
(v) The Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of Contract and the Contractor fails to correct itwithin
a reasonable period of time determined by the Engineer;
(vi) The Contractor does not maintain a security which is required;
(vii) The Contractor has delayed the completion of works by the number of daysfor which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
(viii) If the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence a procurement process or the execution of a contract to the detriment
of the borrower, and includes collusive practice among Bidders (prior to or after bid submission) designed to establish bid prices at artificial non-
competitive levels and to deprive the Borrower of the benefits of free and open competition.
55.3 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause other than those listed under Sub Clause
above, the Engineer shall decide whether the breach is fundamental or not.
55.4 Notwithstanding the above, the employer may terminate the Contract forconvenience.
56. Payment upon Termination
56.1 If the Contract is terminated because of a fundamental breach of Contract by the Contractor, the Engineer shall issue a Certificate for the value of
the work done less advance payments received up to the date of the issue of the
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
certificate, less other recoveries due in terms of the contract, less taxes due to deducted at source as per applicable law and less the percentage to
apply to the work not completed as indicated in the Contract data. Additional Liquidated Damages shall not apply. If the total amount due to the
apply to the work not completed as indicated in the Contract data. Additional Liquidated Damages shall not apply. If the total amount due to the
Employer exceeds any payment due to the Contractor the difference shall be a debt payable to the Employer.
56.2 If the Contract is terminated at the Employer’s convenience or because of a fundamental breach of Contract by the Employer, the Engineer shall
issue a certificate for the value of the work done, the cost of balance material brought by the contractor and available at site, the reasonable cost of
removal of equipment, repatriation of the Contractor’s personnel employed solely on the works, and the Contractor’s cost of protecting and
securing the Works and less advance payment received up to the date of the certificate, less other recoveries due in terms of the contract and less
taxes due to deducted at source as per applicable law.
57.1 All materials on the Site, Plant Equipments, Temporary Works and Works are deemed to be property of the Employer, if the Contract is terminated
because of a Contractor’s default.
58. Release from Performance
58.1 If the Contract is frustrated by the outbreak of war of by any other event entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor shall make the Site safe and stop work as quickly as possible after
receiving this certificate and shall be paid for all work carried out before receiving it and for any work carried out afterwards to which commitment
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
F. SPECIAL CONDITIONS OF CONTRACT
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
The Contractor shall, unless otherwise provided in the Contract, make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a return in detail, in such form and at such intervals as the Engineer
may prescribe, showing the staff and the numbers of the several classes of labour from time to time employed by the Contractor on the site and
such other information as the Engineer may require.
60. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall abide at all times by all existing labour enactments and rules
made thereunder, regulations, notification and bye laws of the State or central Government or local authority and any other labour law (including
rules), regulations, bye laws that may be passed or notifications that may be issued under any labour law in future either by the State or the Central
Government or the local authority. Salient features of some of the major labour laws that are applicable to the construction industry are given
below. The Contractor shall keep the Employer indemnified in case any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made thereunder, regulations or notifications including amendments. If the
Employer is caused to pay or reimburse, such amounts as may be necessary to cause or observe, or for observance of the provisions stipulated in
the notifications/bye laws/Acts/Rules/regulations including amendments, if any, on the part of the Contractor, the Engineer/employer shall have the
right to deduct any money due to the Contractor including his amount of performance security. The Employer/Engineer shall also have the right to
recover from the Contractor any sum required or estimated to be required for making good the loss or damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be treated as the employees of the Employer at any point to time.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER
CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in case of injury by accident arising out of and during the course of
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the Act on satisfaction of certain conditions on separation if an employee
has completed 5 years service or more on death, the rate of 15 days wages for every completed year of service. The Act is applicable to all
establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for monthly contributions by the employer plus workers @ 10% or
8.33% The benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for certain welfare measures to be providedby the Contractor to contract
labour and in case the Contractor fails to provide, the same are required to be provided, by the Principal Employer by Law. The principal Employer is
required to take Certificate of Registration and the Contractor is required to take license from the designated Officer. The Act is applicable to the
establishments or Contractor of Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the Minimum Wages fixed by appropriate Government as per provisions
of the Act, if the employment is a scheduled employment. Construction of Building, Roads, Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to be paid, when it will be paid and what deductions can be made
from the wages of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for work of equal nature to Male and Female workers and for not
making discrimination against female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments employing 20 or more employees. The Act provides for payments of
annual bonus subject to a minimum of 8.33% of wages and maximum of 20 % of wages to employees drawing Rs. 3500/- per month or less. The
bonus to be paid to employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
apply to certain establishments. The newly set-up establishments are exempted for five years in certain circumstances. Some of the State
Governments have reduced the employment size from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all establishments employing 100 or more workmen (employment size
reduced by some of the State and Central Government to 50). The Act provides for laying down rules governing the conditions of employment by the
Employer on matters provided in the Act and get the same certified by the designatedAuthority.
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade unions of workmen and employers. The Trade Unions registered under
the Act have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits employment of children below 14 years of age in certain occupations and
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of service) Act 1979:- The Act is applicable to an establishment
which employs 5 or more inter-state migrant workmen through an intermediary (who has recruited workmen in one state for employment in the
establishment situated in another state).The inter-state migrant workmen, is an establishment to which
this Act becomes applicable, are required to be provided certain facilities such as housing, medical aid, traveling expenses from home upto the
establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and Conditions of Service) Act 1996 and the Cess Act of
1996:- All the establishments who carry on any building or other constructions work and employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of thecost of construction as may be modified by the government.
The Employer of the establishment is required to provide safety measures at the Building or construction work and other welfare measures, such as
canteens, First Aid facilities, Ambulance, Housing accommodations for workers near the workplace etc. The Employer to whom the Act applies has to
obtain a registration certificate from the Registering Officers appointed by the Government.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans before setting up a factory, health and safety provisions, welfare
provisions, working hours, annual earned leave and rendering information regarding accidents or dangerous occurrences to designated authorities. It
is applicable to premises employing 10 persons or more with aid of power or 20 or more persons without the aid of power engaged in the
manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time to time shall be applicable .
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for best energy use, waste management, the reduction of
pollution as in EMS (Environmental Management system)ISO-14001-
61. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred t o COMPETENT AUTHORITY of Gujarat Bhawan, Office of the Resident
Commissioner, New Delhi within 14 days of the notification of the Engineer's decision. If the issue is not resolved, any party can refer the matter
for conciliation within 15 days from the decision given by such Competent Authority.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of the Administrative Officer,
both the parties have to refer to the Resident Commissioner, Gujarat Bhawan, New Delhi concerned for the conciliation process.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Item marked “N/A” do not apply to this Contract.
Clause Reference With respect To section
1. The Employers is [CL.1.1]
Address: ………………………………….
Name of authorized Representative (will be intimated later)
2. The Engineer is ………………………
Name of Authorized Representative: …………………………
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
3. The Defects Liability Period is ................. years from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice to proceed with the work. [CL.1.1]
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
………… Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date Milestone 1 i.e. .…… % days.
Milestone 2 i.e. …..... %........... days.
Milestone 3 i.e. ……..%........... days.
Milestone 4 i.e. ……..%........... days.
6. The Site is located at……………………………………… [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The proportion of payments retained (retention money) shall be 6% {CL. 48} from each bill subject to a maximum of 5% of final
contract price.
Amount of Liquidated damages for For Whole of work {CL.49} delay in completion of works (1/2000)th of the Initial contract price,
rounded off to the nearest Thousand, per day. For sectional Completion (wherever specified In item 6 of Contract data) (1/2000)th
of initial contract price for 5 km Section, rounded off to the nearest thousand per day.
10. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
TECHNICAL SPECIFICATION
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
1. The Agency who has their own arrangement of machinery and T&P to get the subject work done in mechanized system shall be eligible to participate for this work.
2. The Tenderer should be registered with the CPWD, MES, Railways, state Govt organizations, DDA, MCD, NDMC, PSU etc. in appropriate class.
3. The Agency should have executed the similar nature of work in Government/PSU organization in last five years.
4.Works shall be carried out as per latest CPWD Specifications with correction slips
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in conformitywith the conditions of Contract, specification, drawings,
Bill of Quantities and Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably possible after the receipt of the Engineer’s notice to commence,
and to complete the whole of the Works in the Contact within the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for receiving the same, and it shall remain binding upon it and may be
accepted at any time before the expiration of that period.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
4. Unless and until a formal Agreement is prepared and executed this Bid, together with your written acceptance thereof, shall constitute a binding contract
5. We understand that you are not bound to accept the lowest or any tender you mayreceive.
in the capacity of ---------------------
------- duly authorized to sign bids for and on behalf of ----------------------------------
(in block capitals or typed)
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
BILL OF QUANTITIES
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and aregiven to provide a common basis for bidding. The basis of payment
will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and
prices tendered in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices as the Engineer may fix within the terms of
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it is otherwise provided under the Contract, include all
constructional plant, layout, supervision, materials, erection, maintenance, insurance, profit, taxes and duties, together with all general risks, liabilities
and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered by other rates and prices entered in the Bill of Quantities (in case of Item
rate contract).
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
6. The whole cost of complying with the provisions of the Contract shall be included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated or summarized in the Bill of Quantities. References to the
relevant sections of the contract documentation shall be made before entering rates or prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification for Road and Bridge works. For building works specifications
for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw with a single rear mounted heavy duty
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
BILL OF QUANTITIES
(A) Percentage Rate Tender
Description of Items Quantity Rate Unit Amount (₹)
1 Earth work in surface excavation not exceeding 250.00 138.20 Per
30 cm in depth but exceeding 1.5 m in width as Sqm
well as 10 sqm on plan including getting out &
disposal of excavated earth up to 50 m and lift
up to 1.5 m, disposed earth to be levelled and
neatly dressed as per directions of Engineer-in-
2 Trenching in ordinary soil up to a depth of 60 75.00 119.00 Per
cm including removal and stacking of cum
serviceable materials and then disposing of
surplus soil, by spreading and neatly levelling
within a lead of 50 m and making up the
trenched area to proper levels by filling with
earth or earth mixed with sludge or/and manure
before and after flooding trench with water
(excluding cost of imported earth, sludge or
3 Removal of excavated 75.00 334.00 Per
earth/malba/unserviceable material loading, cum
unloading and carriage upto a lead of 05 km, all
complete as per direction of officer-in-charge.
4 Supplying and stacking of good earth at site 80.00 803.75 Per
including royalty and carriage upto 5 km lead cum
complete (earth measured in stacks will be
reduced by 20% for payment).
5 Supplying and stacking of well decayed cattle 6.00 667.10 Per
manure at site including royalty and carriage cum
upto 05 km lead complete (cattle manure
measured in stacks will be reduced by 8% for
6 Supplying and spreading of sand in Lawn area, 10.00 2,088.90 Per
including watering, mixing and dressing cum
7 Spreading of sludge, dump manure and/or 86.00 79.70 Per
good earth in required thickness as per cum
direction of officer-in-charge (cost of sludge,
dump manure and/or good earth to be paid
8 Fine dressing of the ground. 250.00 5.60 Per
9 Providing and laying Neelgiri/Mexican grass turf 100.00 257.00 Per
with earth 50mm to 60mm thickness of existing Sqm
ground prepared with proper level and ramming
with required tools wooden (Dhurmos) and than
rolling the surface with light roller make the
surface smoothen and light, watering with
sprinkler and maintenance for 30 days or more
till the grass establish properly as per direction
of officer-in-charge.
10 Providing & fixing White River (Stone) Pebbles 10.00 776.60 Per
size of 2" to 2.5" dia (5cm to 6.25 cm), in Qtl.
natural colour at site of work including loading,
unloading, carriage etc. and as per direction of
officer-in-charge.
11 Providing, stacking and Displaying Ixora 100.00 154.25 Each
singaporensis different colour having 30 cm
and above ht., well developed with fresh &
healthy foliage with bloom in 25 cm Earthen
Pot/Plastic Pot and as per direction of the
officer-in-charge.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
12 Providing, stacking and Displaying Furcaria 10.00 222.10 Each
variegated well developed with fresh & healthy
foliage 8 to 10 leaves in 30 cm Earthen
Pot/Plastic Pot and as per direction of the
officer-in-charge.
13 Providing, stacking and Displaying Murraya 175.00 277.60 Each
Dwarf well developed fresh & healthy foliage
cm to 30 cm ht. bushy plant in 25 cm Earthen
Pot/Plastic Pot and as per direction of the
officer-in-charge.
14 Providing, stacking and Displaying Bush Rose 400.00 28.40 Each
in different colour 2 to 3 healthy branch 30 cm
and above ht. well developed with 8 or more
flowers/flower buds in 20 cm Earthen
pot/Plastic pot as per direction of the officer-in-
15 Providing, stacking and Displaying Ficus 20.00 2,405.95 Each
Retusa Topiary well developed with fresh &
healthy 5 to 6 big ball specific size and shape
180 cm to 210 cm ht in 40 cm Cement
Pot/Plastic Pot and as per direction of the
officer-in-charge.
16 Providing, stacking and Displaying Topiary 25.00 1,209.15 Each
Casuarina plant fresh & healthy having 5 to
specific shape and size ball well developed
cm to 210 cm ht. plant in 40 cm Cement
Pot/Plastic Pot and as per direction of the
officer-in-charge.
17 Providing and stacking Syngonium miniature 700.00 45.75 Each
dwarf of height 15 cm to 20 cm with 2 to
suckers healthy foliage in 15 cm Earthen
Pot/Plastic Pot and as per direction of the
officer-in-charge.
18 Providing and stacking Alternanthera species of 700.00 14.45 Each
height 10 cm to 12 cm, full of branches and
foliage in Poly Bag and as per direction of the
officer-in-charge.
19 Providing and stacking Ophiopogon, 700.00 21.65 Each
Green/Black full of leaves in 15 cm size of
Earthen Pot/Plastic Pot and as per direction of
the officer-in-charge.
20 Providing and stacking Alpinia Variegated 400.00 132.40 Each
(three in one) having ht. 30 cm and above, with
fresh and healthy variegated foliage in 25 cm
size of Earthen Pot/Plastic Pot and as per
direction of the officer-in-charge.
21 Providing and stacking Portulacaria afra (Jade 700.00 33.70 Each
plant) with 5 to 6 branches in 20 cm size of
Earthen Pot/Plastic Pot and as per direction of
the officer-in-charge.
22 Providing and stacking Chlorophytum- 800.00 21.65 Each
variegated, full of leafy suckers in 15 cm size of
Earthen Pot/Plastic Pot and as per direction of
the officer-in-charge.
23 Providing, stacking and Displaying Mogra of 250.00 50.60 Each
height 25 to 30 cm., 2 to 3 branch in 20 cm
Earthen Pot/Plastic Pot and as per direction of
the officer-in-charge.
24 Providing, stacking and Displaying Canna 400.00 39.50 Each
dwarf of height 25 to 30 cm., 2 to 3 suckers in
20 cm Earthen Pot/Plastic Pot and as per
direction of the officer-in-charge.
25 Providing, stacking and Displaying Dracaena 200.00 203.60 Each
pendanus, well developed, having 6 to
suckers with healthy foliage in 25 cm size
Earthen pot/Plastic pot and as per direction of
the officer-in-charge.
26 Providing, stacking and Displaying 300.00 101.15 Each
Spathiphyllum (peace lilly), having 15 cm to
cm ht. blooming stage with fresh & healthy
foliage well developed in 15 cm Earthen
pot/plastic pot and as per direction of the
officer-in-charge.
27 Providing, stacking and Displaying Dracaena 300.00 123.40 Each
'Song of India' plant (three in one), having ht.
30 cm and above, multibranched, well
developed with fresh and healthy leaves in
cm size of Earthen pot/Plastic pot and as per
direction of the officer-in-charge.
28 Providing, stacking and Displaying Dracaena 150.00 51.80 Each
Marginata having ht. 30 cm to 45 cm with
colorful leaves, fresh and healthy in 20 cm size
of Earthen pot/Plastic pot and as per direction
of the officer-in-charge.
29 Providing, stacking and Displaying Schefflera 200.00 148.05 Each
high colour plant (three in one), having ht.
cm to 30 cm, well developed with fresh and
healthy foliage in 30 cm size of Earthen
pot/Plastic pot and as per direction of the
officer-in-charge.
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
30 Providing and stacking of Allyssum in different 700.00 14.45 Each
colour with fresh and healthy bud stage in
polybag of size 10 cm and as per direction of
the officer-in-charge.
31 Providing and stacking of Antirrhinum Hybrid 700.00 16.85 Each
dwarf variety with fresh & healthy bud stage in
polybag of size 10 cm and as per direction of
the officer-in-charge.
32 Providing and stacking of Begonia wax hybrid 700.00 19.25 Each
in different colour with fresh and healthy bud
stage in polybag of size 10 cm and as per
direction of the officer-in-charge.
33 Providing and stacking of Calendula Double 700.00 16.85 Each
with fresh and healthy bud stage in polybag of
size 10 cm and as per direction of the officer-
34 Providing and stacking of Dahlia single in 700.00 12.05 Each
different colour with fresh and healthy bud
stage in polybag of size 10 cm and as per
direction of the officer-in-charge.
35 Providing and stacking of Marigold French 700.00 14.45 Each
Hybrid dwarf in different colour with fresh and
healthy bud stage in polybag of size 10 cm and
as per direction of the officer-in-charge.
36 Providing and stacking of Marigold Inca hybrid 700.00 14.45 Each
dwarf in different colour with fresh and healthy
bud stage in polybag of size 12 cm and as per
direction of the officer-in-charge.
37 Providing and stacking of Pansy Hybrid in 700.00 16.25 Each
different colour with fresh and healthy bud
stage in Polybag of size 10 cm and as per
direction of the officer-in-charge.
38 Providing and stacking of Petunia hybrid in 700.00 14.45 Each
different colour with fresh and healthy bud
stage in polybag of size 10 cm and as per
direction of the officer-in-charge.
39 Providing and stacking of Salvia dwarf Hybrid in 700.00 14.45 Each
different colour with fresh and healthy bud
stage in polybag of size 10 cm and as per
direction of the officer-in-charge.
40 Providing and stacking of Stock double in 700.00 14.45 Each
different colour with fresh and healthy bud
stage in polybag of size 10 cm and as per
direction of the officer-in-charge.
41 Providing and stacking of Verbena hybrid dwarf 1,000.00 14.45 Each
in different colour with fresh and healthy bud
stage in polybag of size 10 cm and as per
direction of the officer-in-charge.
42 Providing, stacking and Displaying Bamboo 150.00 499.70 Each
Buddha valley with fresh & healthy 3 to
suckers having 75 cm to 90 cm ht. plant in
cm size Earthen Pot/Plastic Pot and as per
direction of the officer-in-charge.
43 Providing and Stacking of Hibiscus 150.00 49.35 Each
rosasinensis of height 60-75 cm. with 5-6
branches in p.bag of size 25 cm as per
direction of the officer-in-charge.
44 Providing and Stacking of Tabernaemontana 150.00 49.35 Each
Coronaria (chandni variegated) of height 45-60
cm. with 3-4 branches earthen pot of size
cm as per direction of the officer-in-charge.
45 Steel work welded in built up sections/ framed 700.00 179.55 kg
work, including cutting, hoisting, fixing in
position and applying a priming coat of
approved steel primer using structural steel etc.
as required.In gratings, frames, guard bar,
ladder, railings, brackets, gates and similar
works.(DSR 2023 10.25.2 with c.I 4.03 %)
I/We am/are willing to carry out the work at…............ % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in words)………………………………………………….
(C)Net Tendered Amount (A-B) (in figure) ………………………………
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
1 The Contractor shall exhibit a board with detailed specification and details of work asdirected by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
SECURITIES AND OTHER FORMS
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called the “The Bidder”) has submitted his bid Dated ------------------------ (Date) for
the construction of ------------- (Name of Contractor hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We ------------------------------------------------
(name of Bank) of-------------------------------- (name of country) having our
hereinafter called
“the bank”) are bound unto --------------------------------------------(name
(hereinafter called “The Employer”) in the sum of------------------------------- *
for which payment well and truly to be made to the said Employer the Bank itself, his successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this ----------------------day of------
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the Employer during the period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with the Instructions to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security, in accordance with the Instructions to Bidders; or
C. does not accept the correction of the Bid Price pursuant to Clause 27 (Correction of Errors)
We undertake to pay to the Employer up to the above amount upon receipt of his first written demand, without the employer having to
substantiate his demand, provided that in his demand the Employer will note that the amount claimed by him is due to him owing to the occurrence of
one or any of the three conditions, specifying the occurred conditions or conditions.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
This Guarantee will remain in force up to and including the date---------------- **
days after the deadline for submission of Bids as such the deadline is stated in the Instructions to Bidders or as it may be extended by the Employer,
notice of which extension (s) to the Bank is hereby waived. Any demand in respect of this guarantee should reach the Bank not later than the above
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures denominated in Indian Rupees. This figure should be the same as shown
in Clause 16.1(Bid Security) of the Instructions to Bidders.
**45 days after the end of the validity period of the Bid. Date should be inserted by the Employer before the Bidding documents are issued.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
PERFORMANCE SECURITY
(name and address of
contractor) (hereafter called “the Contractor”) has undertaken, in pursuance of Contracts No. ------------------------- dates -------------------------- to
--------- (name of Contract and brief description of Works) (hereinafter called “The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish you with a Bank
Guarantee by a recognized bank for the sum specified therein as security for compliance with his obligation in accordance with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to youon behalf of the Contractor, up to a total of -------------------------------
(amount of guarantee)* --------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we undertake to pay you, upon your first written demand and without
cavil or argument, any sum or sums within the limits of---------------------------------------- (amount of guarantee) as aforesaid without your needing to prove or
to show grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor before presenting is with the demand.
We further agree that no change or addition to or other modification of the terms of the Contract to of the Works to be performed thereunder or of any of
the Contract documents which may be made between your and the Contractor shall in any way release us from any liability under this guarantee, and we
hereby waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the Defect Liabilities period.
Signature and Seal of the guarantor ----------------------------- Name of Bank -----------------------------------------------
*An amount shall be inserted by the Guarantor, representing the percentage the Contract price specified in the Contract denominated in Indian Rupees.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
ADDITIONAL PERFORMANCE SECURITY
[Clause 34.1. (A)]
(Name and address of
contractor) (hereafter called “The Contractor”) has undertaken, in pursuance of Contracts No. ------------------------- dates -------------------------- to
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
--------- (Name of Contract and brief description of Works) (hereinafter called “TheContract”)
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall
furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as security for compliance with his obligation in accordance with the
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to youon behalf of the Contractor, up to a total of -------------------------------
(amount of guarantee)--------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we undertake to pay you, upon your first written demand and without
cavil or argument, any sum or sums within the limits of---------------------------------------- (amount of guarantee) as aforesaid without your needing to prove or
to show grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the contractor before presenting is with the demand
We further agree that no change or addition to or other modification of the terms of the Contract to of the Works to be performed thereunder or of any of
the Contract documents which may be made between your and the Contractor shall in any way release us from any liability under this guarantee, and we
hereby waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor ----------------------------- Name of Bank -----------------------------------------------
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
BANK GUARANTEE FOR ADVANCE PAYMENT
In accordance with the provisions of the Conditions of Contract, sub-clause
51.1 (“Advance Payment”) of the above mentioned Contract, ------------------------------
------------------- (name and address of Contractor) (hereinafter called----- “the Contractor”) shall deposit with (name of
Employer) a bank guarantee his proper and faithful performance under the said Clause of the Contract in an amount of (amount of Guarantee)* -
We, the----------------------- (bank of financial institution), as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary obligator and not as Surety merely, the payment to ------------------------------
---------- (name of Employer) on his first demand without whatsoever right of obligation on our part and without his first claim to the Contractor, in the
amount not exceeding ---
We further agree that no change or addition to or other modifications of the terms of the Contractor or Works to be performed thereunder or of any of the
Contract documents which may be made between --------------------------------- (name of Employer) and the Contractor, shall in any way release us from any
liability under this guarantee, and we hereby waive notice of any such change, addition or modifications.
This guarantee shall remain valid and in full effect from the date of the advance payment under the Contract until --------------------------------------
(name of employer) receives full repayment of the same amount from the contractor.
Signature and Seal Name of Bank/ Financial Institution Address
* An amount shall be inserted by that Bank or Financial Institution representing the amount of the Advance Payment, and denominated in Indian Rupees.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Letter of Acceptance
(Letter head paper of the Employer)
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number, as given in the Instructions to Bidders) for the Contract Price of Rupees
( ) (amount in words and figures) as corrected and modified inaccordance with the Instructions to Bidders* is hereby accepted by our agency.
You are requested to furnish performance security, in the form detailed in para 34.1 of ITB for an amount equivalent to Rs.
within 10 days of the receipt of this letter of acceptance up to beyond 60 days from the date of expiry of defects Liability period i.e. up to
and the Additional Performance Security for an amount equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of
Project Completion Date i.e. up to and sign the contract, failing which action as stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature Name and title of Signatory Name of Employer
* Delete “Corrected and” or and modified if only one of these actions applies. Delete as corrected and modified in accordance with the Instructions to Bidders, if
corrections or modifications have not been affected.
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Issue of Notice to proceed with the work
(Letterhead of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing the requisite security in ITB Clause 34.1 and signing of the Contract for the construction of
at a bid Price of Rs.
You are hereby instructed to proceed with the execution of the said works in accordance with the contract documents.
Yours faithfully
(Signature, name and title of signatory authorized To sign on behalf of Employer)
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
This agreement, made on the day of between
(name and address of Employer) (Hereinafter called “the Employer) and (name and address of contractor)
hereinafter called “the Contractor” of the other part.
Whereas the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and the
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
employer has accepted the Bid by the Contractor for the execution and completion of such works and the remedying of any defects therein, at a cost of
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. In this Agreement, words and expression shall have the same meanings as are
respectively assigned to them in the conditions of contract hereinafter referred to and they shall be deemed to form and be read construed as part of
this Agreement.
2. In Consideration of the payment to be made by the Employer to the contractor as hereinafter mentioned, the Contractor hereby covenants with the
Employer to executive and complete the works and remedy any defects therein in conformity in all aspects with the provisions of the contracts.
3. The employer hereby covenants to pay the Contractor in consideration of the execution and completion of the works and the remedying the defects
wherein contract price or such other sum as may become payable under the provisions of the Contract at the times and in the manner prescribed by
4. The Following documents shall be deemed to form and be ready and construed as part of this Agreement viz
i) letter of Acceptance
ii ) Notice to proceed with the works:
iii ) Contractor’s Bid
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
iv ) Conditions of contract: General and Special
v) Contract Data
vi) Additional conditions
viii ) Bill of Quantities and
ix ) Any other documents listed in the Contract
data as forming part of the Contract.
In witness whereof the parties there to have caused this Agreement to be executed the day and year first before written
The Common seal of Was hereunto affixed in the presence of :
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
…………………………………………………..……………………………….. would invest a minimum cash up to 25% of the value of the work during implementation
of the contract.
(Signed by an Authorized officer of the firm)
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
Title of officer
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
I, the undersigned do hereby undertake that our firm M/s ……………………………………
……………..……………………………….. agree to abide by this bid for a period........ days
for date fixed for receiving the same and it shall be binding on us and may be accepted at any time before the expiration of that period.
(Signed by an Authorized officer of the firm)
Title of officer
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
Signature of Bidder with Stamp Signature of Engineer In-Charge
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
DOCUMENTS TO BE FURNISHED BY BIDDER
DOCUMENTS TO BE FURNISHED BY BIDDER
Documents to be furnished by the Bidder
(A) Minimum requirements for the evaluation of preliminary stage:
EMD or Valid Exemption Certificate of Appropriate Class of Registration of Approved Contractors.
Registration Certificate of Appropriate Class
Tender Fee, EMD or Exemption Certificate and Registration Certificate shall be uploaded electronically as prescribed in tender document,
otherwise bid shall be treated as non-responsive.
(B) Minimum requirements for the evaluation of Financial Stage:
Form of Bid as specified in Section-6
Annual Financial Turnover Certificate for last 5 years as per format prescribed as Form-E in Qualification Information certified by CA.
For Value of B in Bid capacity, bidder must submit online a self-certified copy of statement for existing commitments and ongoing works in
prescribed format
If necessary, DTP Approving Authority may add any other document in the above list as per the requirement/ scope of the work.
Prior Approval from the Competent Authority of office of the Resident commissioner, Government of Gujarat, New Delhi, must be taken for any type of
deviation in the Approved Standard Bidding Document, if required.
Signature of Bidder with Stamp Signature of Engineer In-Charge
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Letter No: RDC/0001/09/2026 Approved Date: 19-09-2026 15:38
Office of Resident Commissioner, Gujarat Bhawan, Kautilya Marg, Chanakyapuri, New Delhi
File No: RDC/civ/e-file/308/2025/0098/Bhavan Civil Maintenance-PF2
Approved By: Resident Commissioner,Head of Department (RC),RDC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Land Scaping tender document.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .