| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.3 LAccepted-AOC 221 VIJAY PARK EXTENSION LANE NO 11 DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | 1 | Accepted-AOC Bids lower rates | |
| 2 | 2₹16.0 L+₹63,999 (4.17%)Accepted-AOC 16 A KHADRI MOHALLA SAHARANPUR CHOWK DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | 2 | Accepted-AOC Bidder higher rate | |
| 3 | Rejected-Technical 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | - | Rejected-Technical bidder does not qualified in PQR | |
| 4 | Rejected-Technical JHAWAREDI POST KARBARI IDBI BANK COMPLEX SHIMLA ROAD DEHRADUN | - | Rejected-Technical bidder does not qualified in PQR | |
| 5 | Not Admitted-Fee/PreQual/Technical NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹16.3 L
EMD Value
₹49,000
Closing Date
6 Mar 2024, 1:30 pmClosed
Superintending Engineer, EDC (Urban),Dehradun
Office of the Superintending Engineer, EDC (Urban),Dehradun
Installation of poles and Transformer in Raipur Assembly under EDD North (Deposit Head)
2024_UPCL4_70368_1
Tender No.57/EDC(U)/2023-24
Open Tender
Electrical Works
Item Wise
60 days
as per tender specification
as per tender specification
4 documents required · 4 mandatory
₹1,180
Superintending Engineer, EDC (Urban),Dehradun
₹49,000
2 Aug 2024
24 Feb 2024
6 Mar 2024
25 Feb 2024
6 Mar 2024
26 Feb 2024
Decentralized Material
PP & Clamp MS flat 50X6 mm for SP-55 Pole with Nut-bolts.
LT Clamps for SP-55 pole with nut-bolts.
LT Clamps for SP-23 pole with nut-bolts.
Al Crimping Lug of size 70 Sq. mm
Al Crimping Lug of size 400 Sq. mm
Stay Clamp for SP-55 pole with nut-bolts.
Stay Clamp for SP-23 pole with nut-bolts.
LT Shackle Insulator 100X115 MM with nut-bolts.
Nut & Bolts Full Threads in size 200X16 MM.
PRC Connector 120 to 120 Sq. mm
PRC Connector 120 to 25 Sq. mm
11 KV Joint Kit HSK size 3X70 Sq. mm O/D type.
Cable Holding Clamps for SP-55 pole with nut-bolts.
LT Distribution Box for LT AB Cable 3-Phase 4-Way.
Connecting Cable 1X25 Sq. mm for LT Distribution box(1.5M each).
Labour Part
Carriage of Line material from Araghar Store to work Site including loading/unloading.
(a) ST Pole SP-55
(b) ST Pole SP-23
(c) Line /Stock material
(d) T/F 11/0.4 KV 250 KVA
Manual shifting of following material from road site to pit site distance approximate. 0 to 5 Km.
(a) ST Pole SP-55
(b) ST Pole SP-23
(c) Line /Stock material
(d) T/F 11/0.4 KV 250 KVA
Excavation of foundation pit of size 0.9X0.6X1/5th of length of pole in mixed Soil. Erection of following type Single pole in proper level and alignment alonwith fixing of all accessories, top channel & clamps as per RESPO construction mannual.
Excavation of foundation pit of size 0.9X0.6X1/5th of length of pole in mixed Soil.Erection of following type Double pole in proper level and alignment alonwith fixing of all accessories, top channel & clamps as per RESPO construction mannual.
Grouting of pole in size 0.45x0.45x1/6th mtr lengthy of pole in CC ratio 1:4:8Cement:graded stone:coarse sand) block including cost of cement, sand stone ballast. Back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO const. mannual
Muffing/Plinthing of pole 300 mm above ground level size 0.45x0.45 mm in CC ratio 1:3:6.
Febrication of MS Channel/MS Angle 125X65 mm/100X50 mm/65X65X6 mm, for making Bracket,Channel etc.
Lopping-Chopping of Tree branches for making proper clearance from HT/LT line as per RESPO per tree.
Excavation of Earth for Stay pit size 0.6x0.6x1.2 mtr length of pole for erection of Stay Rod and Grouting of Rod inRatio 1:4:8 CC in Block of size 0.6X.6X0.3 mtr. including nozzaling, fixing, tensioning and tightening complete.
Earthing of Supports with MS Earth rodof 2.5 mtr long by MS rod upto proper depth and connecting the Earth electrode with the help of GI wire 6 no. as per const. mannua.
Layying, sprading & sagging of HT 11 KV line, 3-phase, 3-wire with GI Erth wire complete including fixing of all accessories complete, with binding and jumppering as per sagging chart. including binding complete as per UPCL norms.
(a) ACSR Weasel/Rabbit Conductor.
Layying, sprading & sagging of LT line, 3-phase, 5-wire with complete including fixing of all accessories complete, with binding and jumppering as per sagging chart. including binding complete as per UPCL norms.
(a) ACSR Weasel/Rabbit Conductor.
(b) ACSR Dog Conductor.
Dismentaling of existing LT line(3-Phase, 5 w.)
(a) ACSR Weasel/Rabbit Conductor.
(b) ACSR Dog Conductor.
Re-sagging of LT line, 3-phase, 5-wire(After making Section) with complete including fixing of all accessories complete, with binding and jumppering as per sagging chart. including binding complete as per UPCL norms.
(a) ACSR Weasel/Rabbit Conductor.
(b) ACSR Dog Conductor.
Chemical/Special type Earthing of distribution Transformer including digging of Pit of size 2.5 mtr. Depth and make hole of size 150 mm. Placing of Earthing electrode(to supplied by Contractor own his cost as per drawind-A) as drawing B, connecting the same with GI Strip(to be supplied by Contractor) of size 35x6 mm as per drawing C for a minimum length 6 m. teatment of Soil with highly conductive sustace as per IS 30343 complete in all respect, result of Earthing. The Earth resistance after Earthingshould be less than 1 Ohm.
Gaurding of line over road/other line crossing as per drawing with 6/8 SWG GI wire including fixing of gaurding angle as per RESPO mannual for 11 KV Line
Layying and erection of LT PVC single lead Cable including crimping of Lugs of size 1X400 Sq. mm.
Mounting and fixing of TPMO/ G/O Switch on erected double pole structure of T/F including making all connections with smooth operation.
Mounting and Fixing of 11 KV fuse set o erected D/P with all connections.
Mounting and Fixing of L.A. on D/P Structure including making connections with GI Earthing strip to Earthing Rod properly as per UPCL construction manual.
Painting of pole ST as per UPCL norms.
(a) Single Pole supports.
(b) Double Pole with complete structure.
Installation of following capacity new/repaired T/F 11/0.4 KV, on the D/P Structure with the help of manpower/loading equipments, withmaking all connections as per UPCL construction manual.
Making section pole for existing LT line complete in all respect.
Mounting & fixing of LT PRMC
Making special type bottom Chair Structure for T/F 250 KVA 11/0.4 KV including 3 nos. Channel-.2.2X2 Mtr & 0.5X4. Long pieces Welding with Bottom Channel, on each support of D/P Structure of T/F
Mounting and fixing of LT Fuse Set on erected double pole structure including making all connections with T/F LT Leads..
Dismentaling and re-connection of LT cable service connections of 3-phase.
Dismentaling and re-connection of LT cable service connections of 1-phase.
Filling and fixing of HT Cable Joint Kit Outdoor of size 3X70 Sq. mm.
Layying of 11 KV overhead line of following size, as per UPCL norms.
(a) 3X70 Sq. mm
Layying, stringing and fixing of LT AB Cable-
(a) 3X120+1X95+1X16 Sq. mm.
(b) 3X95+1X70 Sq. mm.
Mounting & fixing of LT distribution box on poles.
RJ ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .