Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
4 Oct 2023, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to be carried out to pump casings of 10 cusec horizontal end suction pumps at Lift Irrigation Scheme Vighbal Ist of MISD Sopore.
2023_IFC_231516_10
e NIT 17 of 2023-24
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Sopore
Please refer Tender documents.
7 documents required · 7 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
16 Oct 2023
28 Sept 2023
5 Oct 2023
28 Sept 2023
4 Oct 2023
28 Sept 2023
Amount
Decoupling of pump from motor, dismantling of pump casing from base frame, extraction and removing of pump parts viz., shaft, impeller and other pump accessories. 02 no. pumps.
Mechanical transportation, loading, unloading and handling of pump using appropriate means of transport like load carrier/auto minivan upto a lead of 18 Km per trip.
Repairing of horizontal C.I. pump casing, end suction type by required mechanical operations viz., bevelling, grinding, buffing, welding etc. The welding includes DG set, welding set, skilled workers and superior quality C.I electrodes/welding rods of Make: (Essab/Adore/Advani/Drew marine) for welding of the pump casing as per requirement. Before repairing the welding portion is to be cleaned, bevelled/ V-grooved by bevelling tool/ portable grinder to billet the welding material to make the joint strong enough and leak proof to withstand full hydrostatic pressure. The welding to be carried out in fragments with Manual Metal Arc welding in multi-layer stringer beads and skip-welding. The job includes pre-heating of surface with proper heating equipment. The welding should be neat and smooth with zero porosity including removing of abrasive material. The job also includes providing and fitting of M.S. plate of required size to be fitted on the repaired portion of pump casing by required C.I. welding electrodes, if required, complete. The job also includes cutting, grinding and finishing of plate.
Installation and fitting of pump casing after repairing at site and fitting of pump parts. The job includes coupling of pump to motor and successful testing of pumping unit on full hydrostatic pressure.
M/s Sultan Engineering Works Baramulla
M/s BUHROO MECHANICAL WORKS
M/S STAR ELECTRICAL ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .