Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | -23.00% | ₹3.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹2,080.16 (0.65%)Admitted-Fee/PreQual/Technical/Finance | -22.50% | ₹3.2 L+₹2,080.16 (0.65%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.0 L+₹74,885.59 (23.4%)Admitted-Fee/PreQual/Technical/Finance VTC MAJHILADI ALIAS JAGIDI PO JEALGORA DHANBAD NEAR SHALIMAR GROUND SHALIMAR DHANBAD 828110 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828110 | -5.00% | ₹4.0 L+₹74,885.59 (23.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.9 L+₹1.7 L (51.9%)Admitted-Fee/PreQual/Technical/Finance SINGH NAGAR JHARIA DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | +17.00% | ₹4.9 L+₹1.7 L (51.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
18 Jul 2026, 5:00 pmClosed
ACE, Bastacolla Area
Civil Deptt., Vikash Bhawan, Bastacolla Area
Covering of various pit mouth under Bastacolla Area
2026_BCCL_361837_1
BCCL/Civ/BA/26-27/eNIT10/989
Open Tender
Civil Works - Others
Percentage
28 days
Bastacolla Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,200
20 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
18 Jul 2026
9 Jul 2026
9 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 9.6 | M3 | 154.9 | ₹1,487.04 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 0.9 | M3 | 214.15 | ₹192.74 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm | 0.12 | M3 | 5,120.95 | ₹614.51 |
| 4 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 5.0 upto plinth level.Cement mortar 1:6 (1 cement : 6 coarse sand) | 4.16 | M3 | 5,002.04 | ₹20,808.49 |
| 5 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 5.0 in superstructure above plinth level up to floor five level in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.96 | M3 | 5,483.5 | ₹16,227.87 |
| 6 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 25.75 | M2 | 222 | ₹5,716.5 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 21.2 | M3 | 6,086.45 | ₹1,29,032.74 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm | 4.45 | M3 | 6,520.45 | ₹29,016 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 349.35 | KG | 75.65 | ₹26,428.33 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 2.95 | M2 | 247.95 | ₹731.45 |
stage.html
html • 0.02 MB
finance_374725.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_374725.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .