| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC | ₹1.6 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹1.7 CrRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹1.7 Cr | 2 | Rejected-Finance 2nd lowest |
| 3 | Rejected-Technical 99 SUSHILA BIHAR BHUD BULANDSHAHAR | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S Singh Construction L2 | R.B.S. CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | M-150 brick work in Toe wall/X- sleeper in 1:4 cement coarse sand mortar including of all labour,Material and T&P etc. required for proper completion of work | 132.76 | m³ | 6,800 ₹9.0 L | 6,250 ₹8.3 L |
| 2.00 | Earth work in filling ruts & cuts for making sub grade for lining including lead up to 30m. & lift up to 1.50m. Including labour, T&P and dressing to profiles etc. required for proper completion of work | 1,784.2 | m³ | 160 ₹2.9 L | 145 ₹2.6 L |
| 3.00 | 10 mm Thick Cement plaster 1:4 C.M with hamirpur coarse sand including cost of all Material, Labour and T&P etc. with proper completion of work. | 78.07 | m² | 264 ₹20,610.48 | 200 ₹15,614 |
| 4.00 | Laying of Tiles for Pressure Release Arrangement on slope filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 42 | Nos. | 3,490 ₹1.5 L | 800 ₹33,600 |
| 5.00 | Laying & Fixing Vertical Pressure Release Valve filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 58 | Nos. | 4,900 ₹2.8 L | 1,200 ₹69,600 |
| 6.00 | Slope lining in two layer 1st layer laying with 1st class brick work in 1:4 cement mortar laid over 10mm thick cement mortar and 15 mm thick S.W.P in 1:3 cement mortar and 2nd layer laying with C.C. Tiles in 1:4 cement mortar laid over 5 mm thick cement mortar in 1:4 including Cost of material,Labour and T&P required for proper completion of work | 7,136.79 | m² | 1,955 ₹1.4 Cr | 1,950 ₹1.4 Cr |
| 7.00 | Slope lining in single layer laying with C.C. Tiles laid over 15 mm thick S.W.P in 1:3 cement mortar and laid over 5 mm thick cement mortar in 1:4 over 1st class brick work.including Cost of Material,labour and T&P required for proper completion of work. | 768.78 | m² | 1,285 ₹9.9 L | 800 ₹6.2 L |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
13 Oct 2025, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT01
2025_UPIDC_1080571_1
07/SE-XII/2025-26
Open Tender
Civil Works
240 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,745
₹3.5 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Apr 2026
7 Oct 2025
13 Oct 2025
7 Oct 2025
13 Oct 2025
7 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
techsummary_1977250.pdf
BOQ Comparative Chart
xlsx
finsummary_1977250.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
TD1.pdf
Tender Documents • 2.22 MB
BOQ_1977250.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid