Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹20.1 CrAccepted-AOC 366 27 SUBHASH NAGAR ROHTAK ROAD JIND | JIND | JIND | HARYANA | 126102 | 1st | Accepted-AOC AOC completed | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied |
Tender Value
₹17.1 Cr
EMD Value
₹34.2 L
Closing Date
24 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE PD-II PWD B and R Branch Railway road Sonipat
Special repair of road from G.T road to Narela border via Jakholi Pabsera Manoli Atterna, Nangal Kalan road RD 0.00 to 19.64 in Rai constituency in Sonipat Distt. Road ID 6039 Alternate route due to Kisan Agitation at Kundli border.
2022_HRY_202991_1
pwd-eepd2-sonepat
Open Tender
Civil Works
Works
180 days
Sonipat
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
Yes
₹34.2 L
Yes
Superinteding Enginer office
8 Feb 2022
6 Jan 2022
25 Jan 2022
6 Jan 2022
24 Jan 2022
6 Jan 2022
13 Jan 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Milling of existing damaged bitumen surface by cold milling machine upto any depth and hauling the milled material up to any lead and stacking at nearest recycling plant site. (HSR 17.43.2)
Note: - The quantity of milled bituminous mix material shall be a recovery item as mention in BOQ item No. 27
The quantity of reclaimed material shall be considered minimum 80% of theoretical volume. The reclaimed material shall be used 30% of total quantity of DBM item No.9 as per clause No. 519 of MoRT&H specifications. | 7,134.4 | Cum | 100 | ₹7,13,440 |
| 2 | Removal of existing CC Block pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or as desired by Engineer. (HSR 17.67). | 787.5 | Cum | 100 | ₹78,750 |
| 3 | Providing & laying Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material
Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer. (Based on HSR 17.15.1) | 1,104 | Cum | 100 | ₹1,10,400 |
| 4 | Providing, laying WBM (G-II) 53 mm to 22.4 mm with screening of Type ‘A’ in layer of 75mm each, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2)
Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI).
2. Materials to be used and operations of manufacturing shall be approved by the engineer | 1,568.29 | Cum | 10 | ₹15,682.9 |
| 5 | Construction of 150mm dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications. (HSR 17.44)
Note: - Minimum cement content for this item will be 150 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 150 kg /cum, then the extra cement will be incidental to work and nothing shall be payable on this account. | 2,719.5 | Cum | 10 | ₹27,195 |
| 6 | Construction of 300mm un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing panel size 3.50m x 4.50m, dowel bars 38mm dia, 500mm long @ 300mm c/c, tie bars 12mm dia, 640mm long @ 600mm c/c, provide 125 micron PVC sheet between DLC & PQC complete as per clause 602 of MORT&H specifications. (minimum content of cement 440 kg/cum) (Based on HSR 17.45.6)
Note: - Minimum cement content for this item will be 440 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 440 kg /cum, then the extra cement will be incidental to work and nothing shall be payable on this account. | 5,439 | Cum | 10 | ₹54,390 |
| 7 | Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor @ 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (HSR.17.26.2) | 1,62,050 | Sqm | 10 | ₹16,20,500 |
| 8 | Providing & laying 70 mm DBM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary check and evaluation, adding fresh mateerial including rejuvenation as required, grade, level and thickness, all as specified in clause No.519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen content 4.50% i/c bitumen of retrieved material as per job mix formula) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, appropriate roller and with hydraulic paver finisher with sensor control to the required grade. The milled material to be used in DBM shall be minimum 80% of the theoretical quantity. (Based on HSR 17.43.1)
Note:- If bitumen required is more than 4.50% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work.
II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
Note: - Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. | 5,671.75 | Cum | 10 | ₹56,717.5 |
| 9 | Providing and laying 40mm thick bituminous concrete (BC) with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor controlto the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications
Note: - I If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor.
III - Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MoRT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. (HSR.17.31.2) | 3,241 | Cum | 10 | ₹32,410 |
| 10 | Providing and laying of cement concrete blocks of size 0.450 m x0.300 m x 0.15 m of cement concrete (C.C) M30 grade and spreading 25 mm thick sand underneath filling joints with sand on existing W.B.M./G.S.B base as per technical specification clause 1503 (HSR.17.66.1) | 928.43 | Cum | 10 | ₹9,284.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_267459.xls
BOQ Document • 0.26 MB
90373369.pdf
Tender Document • 1.96 MB
90373372.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .