Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.0 LAccepted-AOC | L-1 | Accepted-AOC L-1 bidder and most acceptable. | |
| 2 | L-2₹7.6 L+₹66,357.50 (9.50%)Rejected-Finance | L-2 | Rejected-Finance HIGHER BID | |
| 3 | L-3₹8.6 L+₹1.6 L (23.4%)Rejected-Finance | L-3 | Rejected-Finance HIGHER BID | |
| 4 | L-4₹8.9 L+₹2.0 L (28.1%)Rejected-Finance | L-4 | Rejected-Finance HIGHER BID |
Tender Value
₹9.5 L
EMD Value
₹19,080
Closing Date
4 Oct 2022, 2:00 pmClosed
General Manager, OFDR
Ordnance Factory Dehuroad, Pune
Repairs to water proofing treatment of Bastion (1-15) Non-production buildings in factory area at OFDR
2022_MIL_129326_1
GM/OFDR/B/R/669 of 2022-23
Open Tender
Civil Works - Others
Works
120 days
Ordnance Factory Dehuroad
for details kindly refer attached tender documents
4 documents required · 4 mandatory
₹0
₹19,080
Yes
17 Nov 2022
19 Sept 2022
6 Oct 2022
19 Sept 2022
4 Oct 2022
20 Sept 2022
Amount
Cutting or uprooting grass on old Water proofing treatment, removing rubbish off the premises, cleaning surface & preparing to receive new plaster, all as specified in SSR part I and as directed by E-I-C.
Taking down existing water proofing treatment of any thickness in two-three layers from roof slab including taking out any type of cement plastering of any thickness in two-three layers from roof surfaces and removing rubbish off the premises, hacking for key, scrubbing down with water & preparing the surfaces to receive plaster, all as specified in SSR part I and as directed by E-I-C.
Removing building materials etc. ( other than spoil payable under items -Earthwork) to a distance of 1km , beyond the lead included in the rates, including loading, unloading & stacking at the destination, all as specified in SSR Part I & as directed by E-I-C.
M&L for provision of PCC 1:2:4 type B-o (using 12.5mm graded stone agg.) in padding/levelling layer/caping plate-form for storage tanks, with line,level,slope etc complete,all as specified in SSR part I and as directed by E-I-C.
M&L screed bed 15mm thick on roof slab in c.m. 1:4 finished even, fair,& smooth to receive water proofing treatment,with line,level,slope etc complete,all as specified in SSR part I and as directed by E-I-C.
Supply oil based bitumen primer for use in water proofing treatments, etc complete,all as specified in SSR part I and as directed by E-I-C. Make:- M/S Tiki Tar Ltd, M/S STP Ltd.
Labour charges for applying oil based bitumen primer coat 0.30 lit/Sqm on clean and dry surface of C.C., Plaster surfaces, etc complete, all as specified in SSR part I and as directed by E-I-C.
M&L required for provision of water proofing treatment by using APP based ploymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150gms/sqm) land on primed surface by thermo fusion process by using gas regulated torch over roof & vertical surfaces,confirming to I.S.,all as specified in SSR part I and as directed by E-I-C. Make:-MOPLY FP3 Marketed by M/S STP Texsa Ltd.,HYDROSTOP Marketed by M/S Tikki Asphalt.,Tikidan by M/S STP
M & L applying two coat of alluminium paint on app membrane .all as specified in SSR part I( and as directed by E-I-C Make:-M/s STP L.t.d, Asian paint L.t.d, Pidilite industry .
V C SHETH
Ambaji Corporation
GREENSTONE CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .