Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | L1 | Accepted-Finance Attached | |
| 2 | L2₹10.4 L+₹47,113.80 (4.74%)Accepted-Finance NOT SPECIFIED | L2 | Accepted-Finance Attached | |
| 3 | L3₹10.5 L+₹54,658.60 (5.50%)Accepted-Finance | L3 | Accepted-Finance Attached | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Gurvaksh Singh L3 | CHETAN SHARMA L1 | JITENDER KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechaanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing
of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and dispoasl of surplus excavated soil as directed, within a lead of 50 m. | 199.04 | Cum | 450 ₹89,568 | 230 ₹45,779.2 Lowest | 250 ₹49,760 |
| 2.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three
wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting
to the required density Grading 1 as per Technical Specification Clause 404. | 48.14 | Cum | 3,410 ₹1,64,157.4 | 3,200 ₹1,54,048 | 3,050 ₹1,46,827 Lowest |
| 3.00 | Providing and Laying cement concrete 1:1.5:3 (1 Cement : 1.5 Sand : 3 graded stone aggregate 20mm nominal size) curing complete including cost of form work in retaining walls/ breast walls as per HPPWD specification clause 802, 803, 1202, & 1203. | 81.51 | Cum | 7,640 ₹6,22,736.4 | 7,600 ₹6,19,476 Lowest | 8,000 ₹6,52,080 |
| 4.00 | Providing and Laying cement concrete 1:2:4 (1 Cement : 2 Sand : 4 graded stone aggregate 20mm nominal size) curing complete including cost of form work in retaining walls/ breast walls as per
HPPWD specification clause 802, 803, 1202, & 1203. | 25 | Cum | 6,900 ₹1,72,500 Lowest | 7,000 ₹1,75,000 | 7,710 ₹1,92,750 |
Tender Value
₹10.0 L
EMD Value
₹25,000
Closing Date
20 Aug 2025, 4:00 pmClosed
Secretary
OO NP Karsog
C/o Bus stand Karsog. (SH P/L Cement concrete, and c/o protection wall)
2025_UDDHP_111897_1
NP/Karsog/2025-511-17
Open Tender
Civil Works
Item Wise
60 days
Karsog
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Secretary
₹25,000
Yes
27 Aug 2025
8 Aug 2025
21 Aug 2025
8 Aug 2025
20 Aug 2025
8 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .