Executive Engineer Panchayat R&B Division Bharuch
Construction of Gate at Village VEDACH Ta. Jambusar Dist. Bharuch
313215
4/2026-27 (9th Attempt)
Open
Civil - All
Fixed-rate
Bharuch
5 documents required · 5 mandatory
₹900
Executive Engineer Panchayat R&B Division Bharuch
₹6,000
19 Jun 2026
19 Jun 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
Name of Work :- Construction of Gate at Village VEDACH Ta. Jambusar Dist.
BILL OF QUANTITIES
Memorandum showing item of works to be carried out.
It. Item of Work Qty. Unit Rates in Total
No. Figure Amount
1 Excavation for foundation upto 1.50 mt depth including sorting out and 23.50 Cum 447.54
stacking of useful materials and disposing the excavated stuff within all
lead and lift (C) Hard Murrum.
2 Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 2.80 Cum 2976.73
hand broken stone aggregate 40mm nominal size) & curing etc. complete
including cost of form work in foundation & plinth.
3 Providing and laying cement concrete work 1:2:4 (1 cement : 2 coarse sand 6.65 Cum 3746.12
: 4 graded stone aggregates 20 mm nominal size) and curing complete
excluding cost of formwork and reinforcement for reinforced concrete work
in (A) Foundations, footings, base or columns and mass concrete.
4 Filling available excavated earth (excluding rock) in trenches plinth side of 5.88 Cum 130.39
foundation etc. in layer not exceeding 20 cm in depth consolidation each
deposited layer by ramming and watering etc. complete.
5 Providing and laying ordinary cement concrete 1:2:4 (1 cement : 2 2.83 Cum 8692.87
coarse sand : 4 graded stone aggregates 20 mm nominal size) and
finishing smooth with curing etc. complete including the cost of formwork
but excluding the cost of reinforcement for R.C.C. work in (B) COLUMNS
(iii) Having cross-sectional area more than 0.12 Sq.m. and upto 0.18 Sq.M.
6 Providing and laying ordinary cement concrete 1:2:4 (1 cement : 2 1.50 Cum 8593.80
coarse sand : 4 graded stone aggregates 20 mm nominal size) and
finishing smooth with curing etc. complete including the cost of formwork
but excluding the cost of reinforcement for R.C.C. work in (A) BEAMS (i)
Having cross sectional area 0.05 to 0.08 Sq.M.
7 Providing formwork of ordinary timber planking so as to give a rough 33.70 Sq.m. 587.60
finish including centering shuttering strutting and propping etc. height of
propping and centering below supporting floor to ceiling not exceeding 4 M.
and removal of the same for in situ reinforced concrete and plain concrete
work in (H) (1) Sides and soffits of Beams Beam Haunchings cantilevers
girders Bressumers and lintels not exceeding 1 M. in depth.
8 White stone work ashlar punched (ordinary) in superstructure upto floor 23.60 Cum 16994.26
level in cement mortar 1:6 (1 white cement : 6 coarse sand) including
pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an
admixture of pigment matching the stone shade. (For one face dressed
and using white sand stone of superior quality)
9 Pointing on coursed stone masonry with cement mortar 1:3 (1-cement : 59.90 Sq.m. 87.81
3-coarse sand) (A) Flush pointing.
10 Distempeing (two coats) with oil bound distemper of approved brand and 59.90 Sq.m. 71.90
manufacture and of required shade on wall surfaces to give an even
shade, over and including a priming coat with distemper primer of approved
brand and manufacture after thoroughly brushing the surface free from
mortar dropping and other foreign matter and also including preparing the
surface even and sand papered smooth.
It. Item of Work Qty. Unit Rates in Total
No. Figure Amount
11 Providing I.S.I. Mark T.M.T. bar Fe-415 bar reinforcement for R.C.C. work 1120.40 Kg. 67.26
including bending, binding and placing in position complete for all floor
i.e. Rs. Five lacs Eighty Seven thousand Eight hundred Thirteen and Thirty Three paisa only.
I/We am/are willing to carry out the work @ ______________ % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me
and found order.
Deputy Executive Engineer Sr. Divisional Account Officer Executive Engineer
Panchayat (R & B) Sub Division, Panchayat (R & B) Division, Panchayat (R & B) Division,
Jambusar Bharuch Bharuch
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs - Circulars - 1.pdf
GRs - Circulars - 2.pdf
Specification Index.pdf
Technical Specifications.pdf
BOQ_Stamp Duty Work _ Gate At Village _Vedach.pdf
SBD_Stamp Duty Work _ Gate At Village _Vedach.pdf
NIT_Stamp Duty Work _ Gate At Village _Vedach.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .