Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Finance | -28.50% | ₹12.7 L | L1 | Admitted-Finance |
| 2 | L2₹15.1 L+₹2.4 L (18.7%)Admitted-Finance | -15.10% | ₹15.1 L+₹2.4 L (18.7%) | L2 | Admitted-Finance |
| 3 | L3₹15.3 L+₹2.6 L (20.3%)Admitted-Finance | -14.00% | ₹15.3 L+₹2.6 L (20.3%) | L3 | Admitted-Finance |
Tender Value
₹17.8 L
EMD Value
₹42,000
Closing Date
4 Jun 2026, 3:00 pmClosed
Executive Engineer (Mtc-I)
Office of the Executive Engineer, New Mangalore Port Authority, Panambur, Mangalore.
Pruning of tree branches at NMPA Colony, watering to the plants, conveying and burring the carcass and Plantation for the year 2026-27
2026_NMPT_908622_1
CIVIL/CE(C)/EE(C)/17/2026-27
Open Tender
Civil Works
Percentage
365 days
New Mangalore Port Authority, Panambur, Mangalore
As per tender document
6 documents required · 6 mandatory
₹560
Yes
As per tender condition
₹42,000
Yes
8 Jul 2026
14 May 2026
5 Jun 2026
14 May 2026
4 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ perticulars | |||||
| 1.01 | Cutting of branches of trees of large/small sizes, Size Upto 30cms girth by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc. complete as directed by the department without damaging the port property like buildings, cables etc. (The main tree branch cut off from the tree of girth size upto to 30 cm, before its disposal shall be cut into smaller pieces of length not less than 3.0 m and stacked separately for measurement. Each smaller pieces of length not less than 3.0 m shall be considered as 1 No for payment.) including Taking away the cut branches and clear the site. | 400 | Each | 58.12 | ₹23,248 |
| 1.02 | Cutting of branches of trees of large/small sizes, Size 30cms to 60 cms girth by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department without damaging the port property like buildings, cables etc. The main tree branch cut off from the tree of girth size 30cm to 60 cm , before its disposal shall be cut into smaller pieces of length not less than 2.0m and stacked separately for measurement. Each smaller pieces of length not less than 2.0 m shall be considered as 1 No for payment. including Taking away the cut branches and clear the site | 400 | Each | 168.58 | ₹67,432 |
| 1.03 | Cutting of branches of trees of large/small sizes, Size60cms to 90cms girth by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc. and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc. complete as directed by the department without damaging the port property like buildings, cables etc. The main tree branch cut off from the tree of girth size 60cm to 90 cm , before its disposal shall be cut into smaller pieces of length not less than 1.20 m and stacked separately for measurement. Each smaller pieces of length not less than 1.2 m shall be considered as 1 No for payment. including Taking away the cut branches and clear the site | 300 | Each | 273.35 | ₹82,005 |
| 1.04 | Cutting of branches of trees of large/small sizes, above 90cms girth by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc. complete as directed by the department without damaging the port property like buildings, cables etc. The main tree branch cut off from the tree of girth size above 90 cm , before its disposal shall be cut into smaller pieces of length not less than 1.00 m and stacked separately for measurement. Each smaller pieces of length not less than 1.0 m shall be considered as 1 No for payment. including Taking away the cut branches and clear the site. | 200 | Each | 377.48 | ₹75,496 |
| 1.05 | Cutting of Coconut trees of all sizes which is in dangerous condition without damaging the electrical lines telephone lines water supply and sewer lines, T.V. cables, roof tiles etc. All the tree/branches should be cut into small pieces on the tree itself and descend the same manually by employing sufficient numbers of labours and tools and plants like ropes, axes, sickle, etc and removing the cut off materials from the site, disposing off the unwanted materials including cost and conveyance of all materials labour tools and plants and all other incidental charges etc complete as directed by the department. including Taking away the cut branches and clear the site | 40 | Each | 1,417.2 | ₹56,688 |
| 1.06 | Providing and sprinkling of water TO PLANTS in Plantation area & gardens in & around N.M.P.T Staff Colony & A.O.building premises by a water tanker of 6000 ltrs. mechanically or manually including cost and Conveyance of all materials, transportation, labour, sprinkling and all other incidental charges including cost of vehicles, pumping, labour charges, T&P charges etc. complete | 2,054 | Trips | 350.98 | ₹7,20,912.92 |
| 1.07 | Removing of Parasites from the trees in the port area without damaging the trees and disposing the same including cost and conveyance of all materials, labour, tools and plants and all other incidental charges etc complete as directed by the department | 50 | Nos. | 2,412.19 | ₹1,20,609.5 |
| 1.08 | Planting of plants as specified by the department in 0.60 mX0.60 m deep in the ground, mixing the soil with manure, planting the saplings, back filling the trench, including cost of material, labour, Transporting plants from the departmental nursery to the specified locations etc. complete | 3,000 | Nos. | 46.87 | ₹1,40,610 |
| 1.09 | Digging deep pit, conveying and burring carcass of domestic animals as soon as such incident occur and refilling these pits etc. complete s with a lead of 1.00km including cost of labour, tools and plants and all other incidental charges etc. complete as directed by the department | 40 | Nos. | 703.11 | ₹28,124.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
PruningOfTreesTD.pdf
Tender Documents • 1.17 MB
BOQ_954980.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .