Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹44.4 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹44.6 L+₹15,556 (0.35%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | 2 | Rejected-Finance L2 | |
| 3 | 3₹45.9 L+₹1.5 L (3.26%)Rejected-Finance R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | 3 | Rejected-Finance L3 | |
| 4 | 4₹45.9 L+₹1.5 L (3.28%)Rejected-Finance | 4 | Rejected-Finance L4 | |
| 5 | 5₹46.0 L+₹1.5 L (3.46%)Rejected-Finance | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Anil Kumar L3 | Subham Thakur L1 | Sh. Ashok Kumar Prop. M/S A.K. Guleria Construction L5 | Manoj Kumar L2 | Metro Suppliers and Construction Company L4 | Pawan Kumar L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS New Bilaspur Town whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 45,89,500 ₹45,89,500 | 44,44,444 ₹44,44,444 Lowest | 45,98,000 ₹45,98,000 | 44,60,000 ₹44,60,000 | 45,90,000 ₹45,90,000 | 45,99,000 ₹45,99,000 |
| 2.00Description of main components of the scheme is as under:- | |||||||||
| 2.01Civil works: 6 Nos pump house, Sump well/ main storage tank/Raw water tank, Clear water tank sector storage tanks. Rising main: 300mm dia 3200 Rmt, 65mm dia =6500 Rmt. Pumping machinery: Booster stage: KRT Submersible pump 2x35=70 HP,2x5HP=10HP Centrifugal pump 4x265=1060HP,Centrifugal pump 2x25=50HP,Centrifugal pump 2x20=40HP, Centrifugal pump 2x2x52=208HP,2x5=10 HP,2x20=40HP. Distribution system:79.27 Km of various dias No of storage tanks: 23 No., 11 No. Sectors , Total working hours: 169 per day through , 24 No. persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 3850000 Litr). Pumping hours per day (16) and energy consumptoin per day Unit. | |||||||||
Tender Value
₹45.5 L
EMD Value
₹90,910
Closing Date
14 Oct 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS New Bilaspur Town in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system for one year).
2025_HPIPH_116827_1
BLP-BLP-0736-NIT No. 8643-8742 Dated 03/10/2025
Open Tender
Civil Works
Item Rate
365 days
Sub Division Bilaspur Section NBT
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
Yes
₹90,910
Yes
17 Oct 2025
4 Oct 2025
14 Oct 2025
4 Oct 2025
14 Oct 2025
4 Oct 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS New Bilaspur Town whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 6 Nos pump house, Sump well/ main storage tank/Raw water tank, Clear water tank sector storage tanks. Rising main: 300mm dia 3200 Rmt, 65mm dia =6500 Rmt. Pumping machinery: Booster stage: KRT Submersible pump 2x35=70 HP,2x5HP=10HP Centrifugal pump 4x265=1060HP,Centrifugal pump 2x25=50HP,Centrifugal pump 2x20=40HP, Centrifugal pump 2x2x52=208HP,2x5=10 HP,2x20=40HP. Distribution system:79.27 Km of various dias No of storage tanks: 23 No., 11 No. Sectors , Total working hours: 169 per day through , 24 No. persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 3850000 Litr). Pumping hours per day (16) and energy consumptoin per day Unit.
Manoj Kumar (BID ID -569836)
M/S Anil Kumar (BID ID -569847)
Metro Suppliers and Construction Company (BID ID -568144)
Sh. Ashok Kumar Prop. M/S A.K. Guleria Construction (BID ID -569866)
Pawan Kumar (BID ID -569867)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .