| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹58.9 L+₹1.3 L (2.19%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹58.9 L+₹1.3 L (2.21%)Rejected-Finance 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L3 | Rejected-Finance L3 | |
| 4 | L4₹59.1 L+₹1.4 L (2.43%)Rejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L4 | M/S ARYA ENTERPRISES L3 | M/S SHIVANI ASSOCIATES L2 | santosh kumar pal L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Laying coarse sand below c.c. with including all lead and lift with all cost of labour, T&P etc complete. | 176.66 | Cum | 5,000 ₹8,83,300 | 4,200 ₹7,41,972 | 4,200 ₹7,41,972 | 1,800 ₹3,17,988 Lowest |
| 2.00 | Laying LDPE film 200 micron including cost of all materials labour T&P etc for complete work. | 3,533.12 | Sqm | 30 ₹1,05,993.6 | 25 ₹88,328 | 20 ₹70,662.4 Lowest | 25 ₹88,328 |
| 3.00 | Laying C.C. in sleeper M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 91.15 | Cum | 9,000 ₹8,20,378.8 | 10,000 ₹9,11,532 | 9,200 ₹8,38,609.44 | 8,500 ₹7,74,802.2 Lowest |
| 4.00 | Laying C.C. in M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and sand stone ballast (20mm-40mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 24.23 | Cum | 8,800 ₹2,13,206.4 | 8,300 ₹2,01,092.4 | 8,000 ₹1,93,824 Lowest | 8,000 ₹1,93,824 Lowest |
| 5.00 | Centering and shuttering for C.C work including cost of all material lebour and T & P etc.required for proper completion of work. | 1,552.41 | Sqm | 190 ₹2,94,957.9 | 100 ₹1,55,241 Lowest | 170 ₹2,63,909.7 | 400 ₹6,20,964 |
| 6.00 | Laying 75mm thick C.C. lining M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 3,533.12 | Sqm | 750 ₹26,49,840 Lowest | 800 ₹28,26,496 | 810 ₹28,61,827.2 | 800 ₹28,26,496 |
| 7.00 | Dry earth work digging in foundation masonary work on channels including lead up to 30m and lift up to 1.50m. | 307.76 | Cum | 80 ₹24,620.8 | 70 ₹21,543.2 Lowest | 70 ₹21,543.2 Lowest | 200 ₹61,552 |
| 8.00 | Laying C.C. M-20(1:1.5:3) 4.75 to 20mm size Granite crushed stone grit/cum including cost of all material labour and T&P etc. required for proper completion of work. | 82.7 | Cum | 8,800 ₹7,27,760 Lowest | 9,200 ₹7,60,840 | 8,800 ₹7,27,760 Lowest | 9,000 ₹7,44,300 |
| 9.00 | Providing and fixing sealing compound in between pannel joints including cost of all material labour, T&P with all lead and lift for proper completion of work as per direction of Engineer-in-charge . | 3,310 | RM | 40 ₹1,32,400 | 40 ₹1,32,400 | 40 ₹1,32,400 | 20 ₹66,200 Lowest |
| 10.00 | Preparation of sub grade for linig work including cost of all material labour T&P etc. as per direction of Engineer-in-charge. | 3,527.2 | Sqm | 15 ₹52,908 | 15 ₹52,908 | 11 ₹38,799.2 Lowest | 20 ₹70,544 |
Tender Value
₹72.8 L
EMD Value
₹1.5 L
Closing Date
6 Mar 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
C.C. LINING work IN U/S AND D/S OF 14 NO CONSTRUCTED STRUCTURES OF MANSURI MR.
2026_UPIDC_1111712_6
07/S.E/2025-26
Open Tender
Civil Works
Item Wise
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,859
₹1.5 L
8 May 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
Laying coarse sand below c.c. with including all lead and lift with all cost of labour, T&P etc complete.
Laying LDPE film 200 micron including cost of all materials labour T&P etc for complete work.
Laying C.C. in sleeper M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Laying C.C. in M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and sand stone ballast (20mm-40mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Centering and shuttering for C.C work including cost of all material lebour and T & P etc.required for proper completion of work.
Laying 75mm thick C.C. lining M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Dry earth work digging in foundation masonary work on channels including lead up to 30m and lift up to 1.50m.
Laying C.C. M-20(1:1.5:3) 4.75 to 20mm size Granite crushed stone grit/cum including cost of all material labour and T&P etc. required for proper completion of work.
Providing and fixing sealing compound in between pannel joints including cost of all material labour, T&P with all lead and lift for proper completion of work as per direction of Engineer-in-charge .
Preparation of sub grade for linig work including cost of all material labour T&P etc. as per direction of Engineer-in-charge.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
Buklet_1.pdf
Tender Documents • 3.43 MB
BOQ_2083721.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .