Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.6 LAccepted-AOC | ₹57.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹58.9 LRejected-Finance | ₹58.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹58.9 LRejected-Finance 0 KUMHARPURA PHULWARIYA CANTT VARANASI UTTAR PRADESH 221106 UDYAM UP 75 0135081 | VARANASI | UTTAR PRADESH | 221106 | ₹58.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹59.1 LRejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹59.1 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S ADITYA CONSTRUCTION COMPANY L4 | M/S ARYA ENTERPRISES L3 | M/S SHIVANI ASSOCIATES L2 | santosh kumar pal L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Laying coarse sand below c.c. with including all lead and lift with all cost of labour, T&P etc complete. | 176.66 | Cum | 5,000 ₹8.8 L | 4,200 ₹7.4 L | 4,200 ₹7.4 L | 1,800 ₹3.2 L |
| 2.00 | Laying LDPE film 200 micron including cost of all materials labour T&P etc for complete work. | 3,533.12 | Sqm | 30 ₹1.1 L | 25 ₹88,328 | 20 ₹70,662.40 | 25 ₹88,328 |
| 3.00 | Laying C.C. in sleeper M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 91.15 | Cum | 9,000 ₹8.2 L | 10,000 ₹9.1 L | 9,200 ₹8.4 L | 8,500 ₹7.7 L |
| 4.00 | Laying C.C. in M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and sand stone ballast (20mm-40mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 24.23 | Cum | 8,800 ₹2.1 L | 8,300 ₹2.0 L | 8,000 ₹1.9 L | 8,000 ₹1.9 L |
| 5.00 | Centering and shuttering for C.C work including cost of all material lebour and T & P etc.required for proper completion of work. | 1,552.41 | Sqm | 190 ₹2.9 L | 100 ₹1.6 L | 170 ₹2.6 L | 400 ₹6.2 L |
| 6.00 | Laying 75mm thick C.C. lining M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc. | 3,533.12 | Sqm | 750 ₹26.5 L | 800 ₹28.3 L | 810 ₹28.6 L | 800 ₹28.3 L |
| 7.00 | Dry earth work digging in foundation masonary work on channels including lead up to 30m and lift up to 1.50m. | 307.76 | Cum | 80 ₹24,620.80 | 70 ₹21,543.20 | 70 ₹21,543.20 | 200 ₹61,552 |
| 8.00 | Laying C.C. M-20(1:1.5:3) 4.75 to 20mm size Granite crushed stone grit/cum including cost of all material labour and T&P etc. required for proper completion of work. | 82.7 | Cum | 8,800 ₹7.3 L | 9,200 ₹7.6 L | 8,800 ₹7.3 L | 9,000 ₹7.4 L |
| 9.00 | Providing and fixing sealing compound in between pannel joints including cost of all material labour, T&P with all lead and lift for proper completion of work as per direction of Engineer-in-charge . | 3,310 | RM | 40 ₹1.3 L | 40 ₹1.3 L | 40 ₹1.3 L | 20 ₹66,200 |
| 10.00 | Preparation of sub grade for linig work including cost of all material labour T&P etc. as per direction of Engineer-in-charge. | 3,527.2 | Sqm | 15 ₹52,908 | 15 ₹52,908 | 11 ₹38,799.20 | 20 ₹70,544 |
Tender Value
₹72.8 L
EMD Value
₹1.5 L
Closing Date
6 Mar 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
C.C. LINING work IN U/S AND D/S OF 14 NO CONSTRUCTED STRUCTURES OF MANSURI MR.
2026_UPIDC_1111712_6
07/S.E/2025-26
Open Tender
Civil Works
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,859
₹1.5 L
8 May 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
Laying coarse sand below c.c. with including all lead and lift with all cost of labour, T&P etc complete.
Laying LDPE film 200 micron including cost of all materials labour T&P etc for complete work.
Laying C.C. in sleeper M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Laying C.C. in M-15(1:2:4) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and sand stone ballast (20mm-40mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Centering and shuttering for C.C work including cost of all material lebour and T & P etc.required for proper completion of work.
Laying 75mm thick C.C. lining M-20(1:1.5:3) with cement (OPC-43 Grade) coarse sand of F.M. not less than 2.0 and crushed hard stone grit (4.75-20mm size) including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour etc.
Dry earth work digging in foundation masonary work on channels including lead up to 30m and lift up to 1.50m.
Laying C.C. M-20(1:1.5:3) 4.75 to 20mm size Granite crushed stone grit/cum including cost of all material labour and T&P etc. required for proper completion of work.
Providing and fixing sealing compound in between pannel joints including cost of all material labour, T&P with all lead and lift for proper completion of work as per direction of Engineer-in-charge .
Preparation of sub grade for linig work including cost of all material labour T&P etc. as per direction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
Buklet_1.pdf
Tender Documents • 3.43 MB
BOQ_2083721.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid