Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹11.9 LAccepted-AOC | ₹11.9 L Quoted ₹12 L | 1st | Accepted-AOC lowest Bidder(L1) Shivalik Solid Based Management. |
| 2 | 2nd₹16.3 L+₹4.3 L (35.4%)Rejected-Finance R O WARD NO 5 BRIJ NAGAR TEHSIL DISTT HAMIRPUR HP | ₹16.3 L+₹4.3 L (35.4%) | 2nd | Rejected-Finance 2nd |
| 3 | 3rd₹16.9 L+₹4.9 L (40.8%)Rejected-Finance 201 DDA LOCAL SHOPPING CENTRE BLOCK VIKASPURI NEW DELHI 110018 | NEW DELHI | WEST DELHI | DELHI | 110018 | ₹16.9 L+₹4.9 L (40.8%) | 3rd | Rejected-Finance 3rd |
| Sl No | Description | Qty | Unit | SBA EVIRO SYSTEMS PRIVATE LIMITED L3 | SHIVALIK SOLID WASTE MANAGEMENT LIMITED L1 | NISHAT KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Comprehensive Environmental Clearance & EMP Consultancy for B2 project,including. 1.01.Baseline evironmental data collection (air,water,soil,noise). 1.02Site visits,surveys,ecological & socio-economic assesment. 1.03Preparation of Enviromental Management Plan(EMP). 1.04.Mitigation & monitoring plan with cost estimates. 1.05.Comlpliance with EIA notifcation requirements. 1.06.Submission to SEIAA /authority and Liasion support. 1.07.Environmental monitoring during construction/operation (as per EMP). 1.08.Preparation of compliance reprts ,formats and documentation | 1 | Job | 16,89,000 ₹16,89,000 | 12,00,000 ₹12,00,000 Lowest | 16,25,000 ₹16,25,000 |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
30 Mar 2026, 11:00 amClosed
EE PSMIP Sadwan
EE PSMIP Sadwan
Phina Singh Multipurpose Project in Tehsil Nurpur Distt Kangra HP Providing Consultancy Services for Environment Impact Assessment and Environment Clearance thereof
2026_HPIPH_130805_3
EE-JSV-PSMIP-1585-1667 dated 06-03-2026
Open Tender
Civil Works
Item Rate
60 days
EE PSMIP Sadwan
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
₹28,000
Yes
18 May 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Comprehensive Environmental Clearance & EMP Consultancy for B2 project,including. 1.01.Baseline evironmental data collection (air,water,soil,noise). 1.02Site visits,surveys,ecological & socio-economic assesment. 1.03Preparation of Enviromental Management Plan(EMP). 1.04.Mitigation & monitoring plan with cost estimates. 1.05.Comlpliance with EIA notifcation requirements. 1.06.Submission to SEIAA /authority and Liasion support. 1.07.Environmental monitoring during construction/operation (as per EMP). 1.08.Preparation of compliance reprts ,formats and documentation | - | Job | 0.03 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
form6.pdf
Tender Documents • 0.55 MB
nit2docx.pdf
Tender Documents • 0.34 MB
form8.pdf
Tender Documents • 1.42 MB
Terms.pdf
Additional Documents • 0.29 MB
BOQ_195547.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .