Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 L+₹974.45 (0.23%)Rejected-AOC | ₹4.2 L+₹974.45 (0.23%) | L2 | Rejected-AOC L2 |
Tender Value
₹4.2 L
EMD Value
₹10,592
Closing Date
18 Aug 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Buildings Sub Division Taliparamba
GENERAL 2026 27 Running Maintenance of Various Buildings other than Judicial and Revenue Buildings under Thaliparamba Building Section running maintenance General Civil Work
2026_PWD_864358_1
D1/TN/13/2026 -27
Open Tender
Civil Works - Buildings
Percentage
TALIPARAMBA
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
Yes
₹10,592
Yes
17 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | OD21997/2026-2027:Engaging Coolie for cleaning roof slab , shade ,drain including all charges etc complete | - | each | 1,010.03 | - |
| 1.002 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 352.47 | - |
| 1.003 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | 630.92 | - |
| 1.004 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | 857.82 | - |
| 1.005 | 50.18.7.2.1:Providing and fixing PVC pipes, fittings including fixing the pipe with claps at 1.00 metre spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 20 mm dia 12Kgf/cm2 - Internal work - Exposed on wall | - | metre | 271.75 | - |
| 1.006 | 50.18.9.9.2:Providing and fixing PVC pipes includes joints of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in CHarge. 110 mm dia 4 Kg/cm2 | - | metre | 512.32 | - |
| 1.007 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | - | Litre | 0.47 | - |
| 1.008 | OD98383/2026-2027:Removing night soil from manhole of size 60x60c60cm including removing the cover slab and refixing , removing blockage , cleaning the manhole neatly including all charges etc | - | each | 1,515.05 | - |
| 1.009 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | 8.66 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1462407.xls
BOQ • 0.35 MB
SBD.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .