Loading…
Loading…
Tender Value
₹44.6 L
EMD Value
₹45,000
Closing Date
27 Mar 2026, 1:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Nadiad Irrigation Division Nadiad
Restoration of damaged Canal Syphon at ch.22000 ft. of Traj Distry.
285187
Tender Notice No. 20 of 2025-2026
Open
Civil - All
Kheda
6 documents required · 5 mandatory · 1 optional
₹1,500
Yes
Executive Engineer, Nadiad Irrigation Division Nadiad
₹45,000
Yes
12 Mar 2026
12 Mar 2026
12 Mar 2026
27 Mar 2026
12 Mar 2026
BILL OF QUANTITIES
of Restoration of Damaged Canal Syphon at ch. 22000 ft. of Traj Distry
Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Dismantling the existing brick masonry including sorting out and
stacking the useful material and removing the debris and
making good the damages etc. complete as directed. In Cement
Dismantalling the C.C. lining including including disposing off
2 the dismentalled materials as directed etc. complete.(A)7.50 cm SM 93.00 86.50
Dismantling the R.C.C. work and disposing off the stuff including
stacking of the useful materials etc. complete as
directed.(A)Light Reinforcement ( Main bar upto 16 mm. dia. )
Dismantling the existing R.C.C. Pipes including sorting out and
stacking of the useful materials of the following diameters
including refilling the trenches etc. complete as directed.NP_2
pipes A -5(i)(d) 1000 mm. to 1200 mm.
Excavation for foundation in all sorts of soil including yellow
sandy gravelly soils ,soft & hard murrum etc. in dry condition
including depositing the excavated stuff in uniform layers in
banks or as and where directed etc. complete for lead up to
500m and all lift. (BY MACHINERY)(Excluding Dewatering)
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C work
by "FLORI" including necessary formwork, centering, scaffolding,
compaction by vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost of steel
reinforcement.(A) For Footing of column / Abutment / Pier /
Bottom slab of barrel / Plinth course / Coping / Approach Slab
etc.(a) Concrete grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C work
by "FLORI" including necessary formwork, centering, scaffolding,
compaction by vibrator, curing as directed with all lead & lift etc
6(b) complete without dewatering and excluding the cost of steel CM 510.00 4457.00
reinforcement.(B) For Pier and Abutments / Wing wall / Head
wall / Return wall / Dowel Wall etc.(g) Concrete grade M-15 and
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C work
by "FLORI" including necessary formwork, centering, scaffolding,
compaction by vibrator, curing as directed with all lead & lift etc
6( c ) complete without dewatering and excluding the cost of steel CM 43.00 5642.00
reinforcement.(E) For Column / Beam / Solid Slab of Road
Bridge / Barrel / Cutoff wall etc.(q) Concrete grade M-25 and
BILL OF QUANTITIES
of Restoration of Damaged Canal Syphon at ch. 22000 ft. of Traj Distry
Item of work Unit Qty Rate (Rs.) Amount (Rs.)
Providing and fixing in position ( different diameter ) NP2 R.C.C.
pipe with collar including filling and caulking the joints with
7 cement mortar 1:1 proportion, finishing to design grade and RMT 50.00 3091.10
level curing etc. complete for all leads and lifts.(h)NP-2 class
1200 mm dia pipe.
Providing & Placing in position reinforcement bars including
cutting, bending, welding joints where necessary, hooking etc.
complete as per drawing for all lead and lifts. (B) TMT / CRS Fe
Providing and laying plain / reinforced cement concrete lining of
Nominal Mix, M-15, (MSA-20 mm) in bed, side slopes and
curvature, including mixing, transporting, placing, vibrating,
smooth finishing, curing, including dewatering where required.
(MANUALLY WITH CONVENTIONAL MIXER )(B)10 cm thick lining
in bed /slope - with water curing.
Rs. Forty Four Lac Fifty Seven Thousand Six Hundred Sixty Five & Sixty Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs. ______
Net Tender amount Rs. ______________ Net Tender amount Rs.
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-
In-Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
MIS102010/ 17/ K1 Date:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of contractor. Deputy Executive Engineer
Matar Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Front Page.pdf
2 Notice Inviting online Tender..pdf
3 SBD Book.pdf
4 BOQ.pdf
5 Cement Requirement.pdf
6 Steel Requirement.pdf
7 Prise Escalation.pdf
8 Other Specification.pdf
9 item Wise Specification_compressed.pdf
10 Test Schedule.pdf
11 Tender Notice No20 of 2025-26.pdf
Download all tender documents and submit your bid