Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC | L1 | Accepted-AOC 1st lowest bidder | |
| 2 | L2₹25.1 L+₹11,010.03 (0.44%)Rejected-Finance 124 GARFA SITALA MANDIR KOLKATA WEST BENGAL 700075 | KOLKATA | KOLKATA | WEST BENGAL | 700075 | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹25.2 L+₹17,015.50 (0.68%)Rejected-Finance MIRZAPUR BELDANGA MURSHIDABAD WEST BENGAL 742133 | BELDANGA | MURSHIDABAD | WEST BENGAL | 742133 | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹25.0 L
EMD Value
₹50,046
Closing Date
11 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Bidhannagar Municipal Corporation
Construction of concrete road including cover drain from the h/o. Krishnapura Apartment to h/o. Maa Sitala Apartment to end of Ramkrishnapally at Hellabattala within ward no-14 under Bidhannagar Municipal Corporation. (Fund- U.D. M.A)
2026_MAD_1033632_1
NIT No- 218/PWD/ROAD/BMC, Dated- 21/07/2026
Open Tender
CIVIL WORKS
Percentage
45 days
Bidhannagar Municipal Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹50,046
8 Sept 2026
21 Jul 2026
13 Aug 2026
21 Jul 2026
11 Aug 2026
21 Jul 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying 5 HP Diesel Pump on hire basis for dewatering including Fuel, Operator, and accessories complete in all respect as per instruction of EIC | 20 | Each | 750 | ₹15,000 |
| 2 | Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance | 22.05 | % Cum | 5,662 | ₹1,24,847.1 |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) ln ground floor including roof. | 27.56 | Cum | 447 | ₹12,319.32 |
| 4 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed with in a lead of 75 m. ln ground floor including roof. (a) Above 150 mm. thick | 155.4 | Cum | 1,417 | ₹2,20,201.8 |
| 5 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 77.96 | % Cum | 11,927 | ₹9,29,828.92 |
| 6 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 260 | Cum. | 166 | ₹43,160 |
| 7 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 289.28 | %Cum | 93,621 | ₹2,70,82,682.88 |
| 8 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand | 173.25 | Sqm. | 361 | ₹62,543.25 |
| 9 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion | 25.99 | Cum. | 4,628.87 | ₹1,20,304.33 |
| 10 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth | 31.5 | Cum. | 5,367.81 | ₹1,69,086.02 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_2538622.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .