Assistant Engineer
Municipal Office, Kothamangalam.
GENERAL-ANNUAL PROJECTS 2024-25- PROJECT NO 96/25-KALLAD KUDIVELLA PADHATHI - FILTER UNIT PIPE LINE IN WARD 6-General Civil Work
2025_LSGD_728138_1
LSGD/CELSGD/73294/2024-2025
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kothamangalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
₹21,168
10 Mar 2025
20 Jan 2025
29 Jan 2025
20 Jan 2025
28 Jan 2025
20 Jan 2025
Amount
KALLAD FILTER
OD316595/2024-2025:Design, fabrication, supply, installation and commissioning of Dual Media Pressure Filter having shell thickness 8mm and dish 10mm with epoxy coating outside and GRP lining inside with suitable diameter and height, with manhole and cover for easy inspection at top and an opening provision for media removing arrangement at bottom side with dummy arrangement, capable of discharging water at 7.42 litres per second with a capacity to withstand the operating head which is necessary to deliver water to the pumping main with best quality suitable size Butterfly/Multiport valve for easy backwashing, rinsing and filtering. The Scope of Works includes all related mechanical and pumping works and interconnection of the system at inlet and outlet with the pumping main, bypass arrangement, providing backwash facility, etc. The unit should withstand an internal pressure of 10kg/cm2. All the metallic parts shall be painted with approved quality anti-corrosive paint. The unit should be so installed at suitable point that the operation and maintenance is easy. Piping 100mm MS, 100mm pneumatically activated butterfly valves and SS liquid-filled pressure gauge. Filter media is of grades quartz sand (8-16 & 16-30 mesh), Anthracite with 2 years warranty period (with average 8 hour pumping hours per day), including providing pneumatically controlled butterfly valves with activator, Air Compressor and PLC Panel for dual media Pressure Filter unit for operating system. The system should be compatible with site conditions and other units including motor pump sets. The whole installed system shall be under guarantee for 2 years from the date of commissioning. The Scope of Works also includes suitable weather protection arrangements with MS fabrication and Trafford sheets. The Technical Details including drawings and Specifications of the filter unit and accessories, O & M manual with guidelines for troubleshooting shall be submitted in two sets and trial run should be conducted as per the direction of Departmental Officers.
pipe line changing
18.12.7:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work65 mm dia nominal bore
18.17.5:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore
50.18.9.7.1:Providing and fixing PVC pipes includings of pipes with one step PVC solvent cement, trenching refilling & testing of joints complete as per direction of Engineer in Charge. 63 mm dia 6Kgf/cm2
M P ALIYAR (BID ID -2080260)
Bidder Name
SAJI K KOYA
M P ALIYAR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .