Construction Of 1.50M Span RCC Slab Culvert From Punavasipatty to Antharapatty Road H/O Cinthalavadi pt in Package No.KR PURAM-01 of
2023_RDTN_284154_1
Construction Of 1.50M Span RCC Slab Culvert From
Open Tender
Civil Works - Bridges
Item Rate
90 days
Krishnarayapuram Block (B.P)
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,800
Yes
2 Feb 2023
26 Jan 2023
31 Jan 2023
26 Jan 2023
31 Jan 2023
26 Jan 2023
Amount
Name of the Work : Construction Of 1.50M Span RCC Slab Culvert From Punavasipatty to Antharapatty Road H/O Cinthalavadi pt
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
Below Ground Level
Above Ground Level
Supplying and fabrication of steel including cost and conveyance of
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalmetal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Provison for Bitumen Pad
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SARAVANAN T
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .