| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹1.5 Cr+₹2.5 L (1.69%)Rejected-Finance PLOT NO 7 SRI RAM NAGAR PERIYAKULAM ROAD THENI | THENI | THENI | TAMIL NADU | ₹1.5 Cr+₹2.5 L (1.69%) | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
17 May 2023, 3:00 pmClosed
The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Upgradation/ Strengthening of 1 no Rural Roads in Kodaikanal Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 TN05-74
2023_RDTN_309978_1
DIPR/2018/Tender/2023 DINDIGUL DISTRICT
Open Tender
Civil Works
Item Wise
180 days
DINDIUGL DISTRICT
Upgradation/ Strengthening of 1 no Rural Roads in Kodaikanal Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 TN05-74
6 documents required · 6 mandatory
₹0
₹1.5 L
DRDA,DINDIGUL
13 Jul 2023
3 May 2023
17 May 2023
3 May 2023
17 May 2023
3 May 2023
15 May 2023
Amount
STRENGTHENING THE ROAD FROM PERIYUR TO NADUPATTY ROAD, KM 0/000-2/000, H/O.PERIYUR Estimate amount Rs.152.34 lakhs Part A - Clearing the Scrub jungle clearence including all labour charges for burryingng and burning etc.,
Picking the Existing BT surface with 5cm thick iuncluding all cost of Labour charge etc complete.
Providing & Laying gravel for side bermes including all cost and conveyance of all material and labour charge etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying TACK COAT over WBM/WMM surface at 2.5Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 25mm thick compacted Bituminous Concrete which shall consist of construction of a single course binder / wearing course on a previously prepared
Providing and laying Tack coat over WMM surface(treated with primer) using 2.50Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete
Provision for HM Stone
Provision for KM Stone
Provision for Road White Marking
Provision for 90cm Equilateral traingle Cautionary Sing Board
Provision for 60cm Equilateral traingle Cautionary Sing Board
Provision for 60cm Circle ( Mandatory ) Sing Board
Provision for Chevron signs 90cm Octogon ( Curves )Circle
Provision for Information Board and Name Board
Provision for Cement Concrete "V" Shape Side Drain
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Cemant Concrete 1:2:4 using 20mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Construction of a Single Row Pipe Culvert @ Ch 600,
Earth work excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material
Cement concrete mix 1:4:8 using 40mm ISS size HBG including cost and conveyance of all materials to site including cost of cement and labour for mixing , laying,watering and curing and compacting concrete and labour for formwork and all other incidental charges such as baling out water providing protective bunds coffer dams etc.,complete for foundation concrete.
Supply and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90X40cm and BG for stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10-13cm dia spaced at 75cm c/c etc. complete.
CC 1:3:6 mix using 40 mm ISS HBG metal for RCC items of works excluding cost of reinforcement and fabricating charges and centering and shuttering charges but including curing providing fixtures like fan clamps in the RCC floor or roof level wherever neccessary and bearing surfaces of walls, sides and bottom of slab,beams etc., shall be finished smooth with C.M. 1:3 12mm thick and with kraft paper without claiming extra etc., as directed by the departmental officers complete complying with std. Specifications and as directed.The rate is including vibration charges.for foundation and basement.
Providing and laying Reinforced cement concrete pipe NP3 as per design in single row providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation ,protection works, backfilling, concrete and masonry works in head walls and parapets clause 1106
Retaining Wall
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Cemant Concrete 1:3:6 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, Below Sill
Supplying and erecting shuttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations -Above GL
PART (B) Maintenance Routine Maintenance After completion of construction works Maintenanace I year
Maintenanace II year
Maintenanace III year
Maintenanace IV year
Maintenanace V year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M.SANNASI CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .