Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹11.3 L
EMD Value
₹12,000
Closing Date
5 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Rajkot Irrigation Division, Rajkot.
BHADAR-I IRRIGATION SCHEME. Repairing work of Miscelleneous Canal Structures in Bhadar Section 3, Dhoraji.
367949
SBD-24 of 2026-27
Open
Civil - All
Works
Rajkot
10 documents required · 10 mandatory
₹900
Executive Engineer Rajkot Irrigation Division Rajkot.
₹12,000
21 Nov 2026
21 Nov 2026
21 Nov 2026
5 Dec 2026
21 Nov 2026
120 days
NAME OF WORK :-
Repairing work of Miscelleneous Canal Structures in Bhadar Section 3, Dhoraji.
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Excavation in all sort of strata and formations incl. depositing the unuseful 111.50 Cum 83.00 Rupees: Eighty Three
excavated stuff as and where directed incl sorting and stacking useful materials as Only.
directed upto 30 mt lead etc. complete incl. dewatering. (Depth 0 TO 3.0 mt)
(For all type canal & foundation trenches of C.D. works)
(A) IN OVERBURDEN INCL. HARD MURRUM.
2 Dismantling stone/brick masonry & stacking of useful and unuseful material from 57.51 Cum 616.00 Rupees: Six Hundred
the dismantled materials as directed etc complete. Sixteen Only.
(a) In cement mortar
3 Dismentling charges of existing steel structure of gate & its parts at site & stacking 0.07 M.T. 4126.10 Rupees: Four Thousand
the at site properly. One Hundred Twenty Six
& Ps. Ten Only.
4 Dismentalling the exisitng RCC pipes including sorting out and stacking of the 53.10 Rmt 127.00 Rupees: One Hundred
usefull material Pipe measureble conditions upto lead 200 mt as directed under Twenty Seven Only.
the specification.
(ii) 450 mm to 600mm diameter
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
5 Providing, supplying at site,laying and fixing in position under ground, R.C.C Hume 2.50 Rmt 502.00 Rupees: Five Hundred
pipe of NP-2 class of BIS strandard incl filling the joints with cement mortar 1:1 with Two Only.
providing necessary collars etc complete with inclusive of testing with working
pressur and all lead and lift.
(b) 225 mm dia.
(d) 450mm dia. 20.10 Rmt 986.00 Rupees: Nine Hundred
Eighty Six Only.
(e) 600mm dia. 29.00 Rmt 1344.00 Rupees: One Thousand
Three Hundred Fourty four
(g) 900mm Dia 32.40 Rmt 2214.00 Rupees: Two Thousand
Two Hundred Fourteen
6 Providing and laying in position Controlled cement cocrete using cement sand and 34.41 Cum 4303.00 Rupees: Four Thousand
crushed aggragates by mass and machine mix for R.C.C./C.C. work including Three Hundred Three
necessary formwork, centering, scaffolding, compaction by vibrators using as Only.
directed with all lead and lift etc completed Excluding the cost of reinforcement.
FOR PLINTH COURSE AND COPPING
a. Cocrete grade M-15 and MSA-20 mm
7 White stone bela masonry block in coarse in superstructure with stone of approved 112.61 Cum 5109.37 Rupees: Five Thousand
quality, in lime mortar 1:5 (1-Cement : 5 course sand) including packing the joints One Hundred Nine & Ps.
etc. complete. (More than 10 ton) Thirty Seven Only.
8 Removing plaster including racking out joints 20mm deep etc complete. 85.61 Sqm 71.00 Rupees: Seventy One
a) cement plaster Only.
9 Cement plaster 15 mm thick in single coat to stone masonry in C.M. 1:3 including 517.63 Sqm 216.00 Rupees: Two Hundred
finishing, curing, scaffolding etc complete. Sixteen Only.
a) UPTO 6.0 Mt. HEIGHT
10 Rehandling the excavated stuff incl stacking as and where directed for all sort of 47.07 Cum 59.50 Rupees: Fifty Nine & Ps.
soil,soft murrum,hard murrum,soft rock,hard rock etc. for specified lead as under Fifty Only.
and all lift incl loading unloading transportation etc complete without rolling and
(c) Lead 500mt. to 1 km
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
11 Providing & fixing outlet gates for canal including all materials, labours, fabrication, 586.08 Kg. 87.00 Rupees: Eighty Seven
transporting, fixing to site of work with all lead and lift including one coat of primer Only.
and two coat of epoxy anticorrosive paint as directed including handle and loacking
arrangements etc. complete.
12 Providing & Laying in position Controlled cement concrete using cement, sand and 158.28 Sqm 340.00 Rupees: Three Hundred
crushed aggregate by mass and machine mix for C. C. work in canal lining including Fourty Only.
necessary form works centering scaffolding compaction by plate vibrator, curing as
directed with all lead & lift etc. complete including dressing the bed and trimming the
canal section if required and minor filling with murrum / earth as per site condition to
the correct profile, including providing bitumen joints as per drawing and specified
interval.(Without using paver machineries.)
(d) For 7.50cms thick cast-in-citu canal lining in M-15 grade of conc.with MSA-
20mm without sleepers.
Rupees: Eleven Lac Thirty Two Thousand Four Hundred Twenty Only
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated
rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate
of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P I to XV.pdf
2- SBD Bhadar- I rep. Structure P 1 to 207.pdf
3 Sch B - Rep Str Sec-3 p 208 to 210.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .