Loading…
Loading…
Tender Value
₹14.5 L
EMD Value
₹29,100
Closing Date
6 Oct 2026, 3:00 pm7d left
The Executive Engineer, DIV-III , AMC
O/o the EE Div-III,AMC
Construction of community centre at Chandimata club,under ward No.44 AMC.
2026_SAMC_77312_1
39/EE/Div-III/AMC/2026-27
Open Tender
Civil Works
Percentage
Under AMC Div-III.
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹29,100
Yes
29 Sept 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 34.38 | cum | 231.6 | ₹7,961.71 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 9.19 | cum | 1,177.3 | ₹10,821.74 |
| 3 | Providing and laying dry flat brick flooring in required pattern completed. | 37.2 | sqm | 701.2 | ₹26,084.64 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering shuttering - All work upto plinth level 1:3:6(1 cement:3fine sand:6 graded well burnt brick aggregate 20 mm nominal size.) | 2.41 | cum | 9,938.6 | ₹23,961.96 |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ) | 5.72 | cum | 9,845.2 | ₹56,265.32 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement5.3.1 RCC work in suspended floors, roofs having slope upto 15° landings, balconies, shelves and chajjas. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 11 | cum | 13,584.5 | ₹1,49,409.12 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,587.48 | kg | 103.9 | ₹1,64,939.17 |
| 8 | 12 mm cement plaster of mix : In cement mortar1 : 4 ( 1 cement : 4 fine sand) | 198.09 | sqm | 224.2 | ₹44,411.78 |
| 9 | Neat cement punning | 60.9 | sqm | 56.8 | ₹3,459.12 |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 60.35 | sqm | 577.1 | ₹34,827.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_78693.xls
BOQ • 0.33 MB
DNIT44.pdf
Tender Documents • 3.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .