Tender Value
₹144.7 Cr
EMD Value
₹2.2 Cr
Closing Date
8 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM SANJEEV JAIN
General Manager PIU-04, SPMJ, UPDCC Ltd, Yamuna Colony, Chakrata Road, Dehradun
Civil Works Including Hydro-Mechanical Works for Construction of 73.50 M High Concrete Gravity Dam and Appurtenant Works on Swarna River of Pt. Shyama Prasad Mukherjee Reservoir Drinking Water Project in District -Dehradun (Uttarakhand)
2026_IRDCE_102728_1
01/GM/PIU-04/SPMR/ 2026-27 Dated 16.11.2026
Open Tender
Civil Works - Water Works
Item Rate
1440 days
sahaspur
REQUIRED DETAILS TO BE FILLING AS PER STANDARD BIDDING DOCUMENT AND OTHERS
5 documents required · 5 mandatory
₹5,900
General Manager,PIU-04, UPDCC Ltd Dehradun
₹2.2 Cr
Office of The General Manager, PIU-04, SPMJ, UPD
20 Nov 2026
20 Nov 2026
9 Dec 2026
20 Nov 2026
8 Dec 2026
20 Nov 2026
20 Nov 2026 - 23 Nov 2026
23 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Open Excavation in overburden including boulder upto 1 cum in volume including placing neatly or disposing off the excavated stuff, dewatering, desilting, bailing out water etc. as per Technical Specification including all material labour, T & P etc Complete. | 3,200 | m3 | 316.56 | ₹10,12,992 |
| 2 | Back filling by the excavated material including compaction including all material labour, T & P etc Complete. | 1,600 | m3 | 316.56 | ₹5,06,496 |
| 3 | Providing and laying PCC (M15/ A40 Grade) Concrete as per drawing including all material labour, T & P etc Complete. | 40.26 | m3 | 316.56 | ₹12,744.71 |
| 4 | Providing and laying PCC (M20/ A20 Grade) Concrete as per drawing in cut off wall including all material labour, T & P etc Complete. | 50 | m3 | 316.56 | ₹15,828 |
| 5 | Dewatering from foundation with 40 kW pump for 5 days including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work. including all material labour, T & P etc Complete. | 4,800 | kWh | 316.56 | ₹15,19,488 |
| 6 | Compacted earthwork in d/s coffer dam including all material labour, T & P etc Complete. | 240 | m3 | 316.56 | ₹75,974.4 |
| 7 | S/I 1.2 m dia concrete Pipe NP-2 inclusive of all cost of collar, filler, labor, etc including all material labour, T & P etc Complete. | 150 | Rm | 316.56 | ₹47,484 |
| 8 | Admixture @ 3 kg/cum including all material labour, T & P etc Complete. | 270.78 | kg | 316.56 | ₹85,718.12 |
| 9 | Open Excavation in soft rock for cutoff in soft rock Drainage hole @76mm dia including all material labour, T & P etc Complete. | 75 | m3 | 316.56 | ₹23,742 |
| 10 | Plum Concrete in u/s coffer dam including all material labour, T & P etc Complete. | 380 | m3 | 316.56 | ₹1,20,292.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tendernotice_2.pdf
PDF • 5.52 MB
Tendernotice_3.pdf
PDF • 1.22 MB
Tendernotice_4.pdf
PDF • 30.29 MB
Tendernotice_5.pdf
PDF • 12.51 MB
BOQ_120931.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .