Loading…
Loading…
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
31 Aug 2026, 3:00 pm7d left
KARAN BEER SINGH
Ambala City PHED
sewerage network in recently merged 11 No. villages in MC area, Construction of 2.00 MLD Sewage Treatment Plant at existing STP Nayagaon, Construction of 2.00 MLD Sewage Treatment Plant for village Kanwla and 60.00 MLD Sewage Treatment Plant
2026_HRY_541820_1
2025246CF06F 7AE2 4902 BC86 F0DAA98CBA9B544PUH
Open Tender
Civil Works
Works
365 days
Ambala City
AS PER DNIT
2 documents required · 2 mandatory
₹15,000
₹7.2 L
Yes
18 Aug 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
31 Aug 2026
19 Aug 2026
19 Aug 2026 - 20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame , 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS / Saint Gobin/ Modi Float, covered area 150 sqm including operation and Maintenance of 5 years after 12 months defect liablity period and 3 months trail run period. | 100 | Sqm | - | - |
| 2 | 2 no. High Mast of 3 mtr GI Octagonal Poe 4mm thickness (T=100mm, Base Plate - 320 x 320 x 20mm ), Window at 500mm from Base Plate with 6 no. LED energy outdoor suitable size reupted make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 Mtr high including all acccessories along the road and path complete in all respect | 1 | Job | - | - |
| 3 | Providing and installing 4 CCTV Cameras - 3 Cameras for STP and 1 Camera for MPS complete as per satisfaction of the Engineer - in - charge along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP siteand 8 Channel DVR at MPS site with connectors cables, poles and power supply with online real time output facility. The cameras at both the sites i.e MPS and STP shall be synchronized at STP site. At STP and MPS Site 1 No. PTZ speed dome 360 degree 50x zoom camera 3 no. 12mm lens size 1 no. 36mm size Make - CP Plus Internet protocol minimum 5 MP WDR, Night vision colour mode 2.4.2 12mm very focal with extra IR CCTV Cameras should be installed and commissioned before starting execution of work including operation and Maintenance of 5 years after 12 months defect liability period and 3 months trail run period. | 1 | Job | - | - |
| 4 | NS Item -MPS AT Design, construction, erection, testing and commissioning of MPS and following components: a RCC Inlet chamber, screening chamber, collecting tank, , wet well sump suitable for 2.00 MLD average flow with peak factor 3 including Providing and installing as per CPHHEO manual non clog sewage submersible pump sets having minimum head of 15 m, equipped with suitable LT panel boards, all safety devices, automatic capacitor bank and suitable size submersible cable from LT panel to pumps complete in all respect excluding OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. b K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, sluice valves, non returning valves as per equirements even for bye-pass arrangements complete in all respect excluding
OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. c) 3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design excluding OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. d Supply and installation of 2 mechanical coarse screens suitable for for 2.00 MLD average flow with peak factor of 3.0 complete in all respect excluding OandM during Defect liability period of 12 months after trial run period of 3 months and 5 years thereafter. e Entire infrastructure except construction of staff quarter, Boundary wall, path ways / roads and work covered under Schedule - (HSR - Items) required to be executed at site to make the MPS functional is included in the scope of work for lump-sum job. f) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. g) Raw sewage will be available near boundary wall within the premises of proposed STP but
the conveyance of sewage through DI pipe of suitable diameter, from this terminal point to the receiving Chamber of the MPS is included in the Turnkey contract. The Level of the MPS / STP will be as per bed level of existing incoming sewer at MPS. h) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work. | 1 | Complete Job | - | - |
| 5 | SEWERAGE TREATMENT PLANT (2.00 MLD) a) Design, construction, erection, testing and commissioning of 2.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping, MCC Panel Room, all other contingent ie. Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS at STP including furniture and laboratory equipments and following components.
b) Supplying and installation of 2 Nos. (1W plus 1S) Fine screens of suitable size along with screw conveyor for 2.00 MLD average flow with peak factor 2.25.
c) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED suitable size, outdoor type energy efficient lamps on each pole, 20 no. LED outdoor light with 7 m. high GI pole along road / path including all accessories complete in all respects.
d) Supply and installation of 1 No. 6.00 m wide Main Gate of MS and 1.80 m. wide wicket gate at STP to the entire satisfaction of Engineer-in-charge and as per the design.
e) Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentation, electric panel board etc. as per design complete in all respects as per the design and direction of the Engineer in charge. | 1 | Complete Job | - | - |
| 6 | Operation and maintenance of the complete scope of work
required to be executed in this DNIT i.e 2.00 MLD STP,
MPS, Flow metrs, analyzers etc and all electrical,
mechanical, horticulture and civil structures for 3 months
successful trail run period, one year defect liability period and
five year thereafter on the commissioning of scheme and
plant | 1 | Complete Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_621263.xls
BOQ • 0.29 MB
777955Z140686.pdf
Additional Documents • 2.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].