| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹2.8 LAccepted-AOC | ₹2.8 L | l1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Admitted in Tech.evaln. subject to the decision on Fin. Evaln. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Admitted in Tech.evaln. subject to the decision on Fin. Evaln. |
| Sl No | Description | Qty | Unit | I.BABY ABRAHAM L3 | GANESAN S L1 | DINESAN L2 |
|---|---|---|---|---|---|---|
| 1.00Compound Wall construction | ||||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 19.5 | cum | 1,192.54 ₹23,254.53 | 1,080 ₹21,060 | 1,187.75 ₹23,161.13 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 13.35 | cum | 358.28 ₹4,783.04 | 324 ₹4,325.40 | 356.84 ₹4,763.81 |
| 1.00 | OD354847/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. | 23.7 | cum | 3,977.49 ₹94,266.51 | 3,602 ₹85,367.40 | 3,961.51 ₹93,887.79 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.38 | cum | 8,310.12 ₹28,046.66 | 7,525 ₹25,396.88 | 8,276.74 ₹27,934 |
| 1.00 | OD354862/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site. | 13.65 | cum | 1,709.02 ₹23,328.12 | 1,547 ₹21,116.55 | 1,702.15 ₹23,234.35 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.75 | cum | 10,446.81 ₹7,835.11 | 9,460 ₹7,095 | 10,404.86 ₹7,803.65 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3 | sqm | 384.62 ₹1,153.86 | 348 ₹1,044 | 383.07 ₹1,149.21 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 29.82 | kilogram | 111.98 ₹3,339.58 | 101 ₹3,012.12 | 111.53 ₹3,326.16 |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 8.17 | cum | 6,803.82 ₹55,573.60 | 6,162 ₹50,331.22 | 6,776.49 ₹55,350.37 |
Tender Value
₹3.1 L
EMD Value
₹7,699
Closing Date
28 Oct 2025, 5:00 pmClosed
ASSISTANT ENGINEER
The Assistant Engineer, LSGD Section, Kareepa Grama Panchayat
CONSTRUCTION OF COMPOUND WALL AT NEDUMONKAVU SHOPPING COMPLEX
2025_LSGD_812748_1
347/AE/LSGD/KPA/25-26
Open Tender
Civil Works - Buildings
120 days
KAREEPRA
Please refer Tender documents.
6 documents required · 6 mandatory
₹802
Yes
₹7,699
Yes
10 Jun 2026
21 Oct 2025
29 Oct 2025
21 Oct 2025
28 Oct 2025
21 Oct 2025
Work Name:Annual Plan-2025-26 CONSTRUCTION OF COMPOUND WALL OF NEDUMONKAAVU SHOPPING COMPLEX IN WARD 12 OF KAREEPRA GRAMA PANCHAYATH-347/26-General Civil Work
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1358389.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
affid.pdf
Tender Documents • 0.24 MB
fot.pdf
Tender Documents • 0.25 MB
plms.pdf
Tender Documents • 0.25 MB
sbd.pdf
Tender Documents • 0.98 MB
ipact.pdf
Tender Documents • 0.23 MB
pay.pdf
Tender Documents • 0.23 MB
BOQ_1358389.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid