| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | Rejected-Technical As per approval, Bidder is Techno Commercially Not Acceptable |
Tender Value
Refer Docs
EMD Value
₹100.0 L
Closing Date
1 Jul 2020, 6:00 pmClosed
Puneet Khanna (Head-Supply Chain Management)
Jacobs Engineering India Private Limited, Jacobs House, Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
EPCC-2 package for Normal Butanol Unit of Acrylic _OXO-Alcohol Project at IOCL Gujarat Refinery
2020_REFHQ_112683_1
44AC9100-EPCC-2
Open Tender
Lump Sum TurnKey
750 days
IOCL GUJARAT REFINERY, INDIA
Please refer Tender documents.
10 documents required · 10 mandatory
₹100.0 L
Yes
IOCL, NEW DELHI
18 Sept 2020
5 Feb 2020
2 Jul 2020
5 Feb 2020
1 Jul 2020
4 May 2020
29 Apr 2020
Amount
The scope of work includes Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Topography Survey and Soil Investigation, Demolition/Dismantling works as per prevailing site conditions, Site enabling jobs including area filling and grading upto FGL, Total Procurement (including chemicals, catalysts (except proprietary catalyst supplied by licenser), first fill, consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance which will be obtained by M/s IOCL),pre commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities , Final invoice/ billing & document hand over and handing over of the facilities with Final and “As Built” documentation for EPCC-2 package for Normal Butanol Unit of Acrylic / OXO Alcohol Project at IOCL Gujarat Refinery
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
ENGINEERING PRICE (RESIDUAL PROCESS DESIGN AND DETAILED ENGINEERING OF EPCC PACKAGE (LSTK-2): NBA(NORMAL BUTANOL) UNIT AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION INCLUDING DEMOLITION & DISMANTLING WORKS /INSTALLATION, START-UP, PRECOMMISSIONING, COMMISSIONING, PGTR, TRAINING PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Tax Details
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Customs Duty on Foreign Component of SP-1
SWS on Customs duty on Foreign Component of SP-1
IGST/ (CGST+SGST) on (Foreign Component of SP-1 + (Customs duty at Sr.2.1 + SWS at 2.2 above))
GST ON SUPPLY OF SERVICES EXCLUDING DEMOLITION & DISMANTLING WORKS (PART BREAK-UP OF SP-2)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ANALYSERS (including GCs) / AMADAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DCS/PLC (Supplied by Contractor) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for MMS/CMS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for FDAS/GDAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PACKAGE PLC as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for VFD as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for BATTERY CHARGER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for SOFT STARTER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for HEATER CONTROL PANEL as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for CCTV as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for ANTI-SURGE CONTROLLER as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for SPEED GOVERNOR as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for FA/PA/Telephone as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITY CONSUMPTION FOR EPCC PACKAGE (EPCC-2) AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR EPCC PACKAGE (EPCC-2)
GUARANTEED HP STEAM CONSUMPTION FOR EPCC PACKAGE (EPCC-2)
GUARANTEED COOLING WATER CONSUMPTION FOR EPCC PACKAGE (EPCC-2)
Toyo Engineering India Private Limited
Toyo Engineering India Private Limited
Toyo Engineering India Private Limited
Toyo Engineering India Private Limited
thyssenkrupp Industrial Solutions India
thyssenkrupp Industrial Solutions India
Toyo Engineering India Private Limited
Bidder Name
Technip KT India Ltd
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
European Euro
European Euro
US Dollar
US Dollar
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid