| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Fee/PreQual/Technical/Finance THOTTIYIL CHITHARI RAVANESHWARAM | KERALA | ₹9.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.9 L+₹33,402.40 (3.49%)Admitted-Fee/PreQual/Technical/Finance | ₹9.9 L+₹33,402.40 (3.49%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.9 L+₹34,829.91 (3.64%)Admitted-Fee/PreQual/Technical/Finance PWD S CONTRACTOR KUNHALINKIL HOUSE MARKET ROAD NILESHWAR | ₹9.9 L+₹34,829.91 (3.64%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.1 L+₹48,678.23 (5.09%)Admitted-Fee/PreQual/Technical/Finance | ₹10.1 L+₹48,678.23 (5.09%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹10.2 L+₹62,618.95 (6.54%)Admitted-Fee/PreQual/Technical/Finance | ₹10.2 L+₹62,618.95 (6.54%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SHAMEER A L3 | SIRAJUDEEN K L2 | MUNAFFIR C A L4 | SUKESH M L1 | ABDUL KHADER SHEHEEM L6 | ABOOBACKER K L7 | ABDUL KHADER C A L5 | MADIKAI PANCHAYATH LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD NO S L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00COSTRUCTION OF COMPOUND WALL | |||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 158.74 | cum | 262 ₹41,588.83 | 188.95 ₹29,993.17 Lowest | 268.39 ₹42,603.16 | 255.4 ₹40,541.17 | 275.63 ₹43,752.4 | 276.82 ₹43,941.3 | 272.12 ₹43,195.24 | 331.64 ₹52,643.21 |
| 1.00 | OD51517/2026-2027:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 156.16 | cum | 4,495 ₹7,01,921.22 | 4,960.96 ₹7,74,683.67 | 4,565.6 ₹7,12,945.83 | 4,344.54 ₹6,78,425.99 Lowest | 4,688.79 ₹7,32,182.69 | 4,708.87 ₹7,35,318.3 | 4,628.92 ₹7,22,833.63 | 5,641.52 ₹8,80,957.2 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.95 | cum | 7,700 ₹1,15,130.4 | 5,780.6 ₹86,431.53 Lowest | 7,825.69 ₹1,17,009.72 | 7,446.79 ₹1,11,344.4 | 8,036.85 ₹1,20,166.98 | 8,071.39 ₹1,20,683.42 | 7,934.23 ₹1,18,632.61 | 9,669.88 ₹1,44,584.05 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 35.6 | sqm | 284 ₹10,110.4 | 213.11 ₹7,586.72 Lowest | 288.11 ₹10,256.72 | 274.16 ₹9,760.1 | 295.88 ₹10,533.33 | 297.11 ₹10,577.12 | 292.11 ₹10,399.12 | 356 ₹12,673.6 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,046.64 | kilogram | 84.5 ₹88,441.08 | 62.55 ₹65,467.33 Lowest | 83.88 ₹87,792.16 | 79.82 ₹83,542.8 | 86.14 ₹90,157.57 | 86.51 ₹90,544.83 | 85.04 ₹89,006.27 | 103.64 ₹1,08,473.77 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 74.24 | sqm | 270 ₹20,044.8 | 199.3 ₹14,796.03 Lowest | 275.88 ₹20,481.33 | 262.52 ₹19,489.48 | 283.32 ₹21,033.68 | 284.54 ₹21,124.25 | 279.71 ₹20,765.67 | 340.89 ₹25,307.67 |
| 1.01 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 74.24 | sqm | 154 ₹11,432.96 | 123.38 ₹9,159.73 Lowest | 156.13 ₹11,591.09 | 148.57 ₹11,029.84 | 160.34 ₹11,903.64 | 161.04 ₹11,955.61 | 158.3 ₹11,752.19 | 192.92 ₹14,322.38 |
| 1.01 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 600 | per Letter per cm height | 5 ₹3,000 | 3.54 ₹2,124 Lowest | 4.73 ₹2,838 | 4.51 ₹2,706 | 4.85 ₹2,910 | 4.88 ₹2,928 | 4.79 ₹2,874 | 5.85 ₹3,510 |
Tender Value
₹12.7 L
EMD Value
₹31,696
Closing Date
19 Sept 2026, 6:00 pmClosed
Assistant Execurtive Engineer
Office of the Executive Engineer LID AND EW DIVISION, KASARAGOD P.O. VIDYANAGAR
Construction of Compound Wall
2026_LSGD_868885_1
60/2026-27
Open Tender
Civil Works - Buildings
Item Wise
180 days
PALLIKKARA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,696
Yes
22 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COSTRUCTION OF COMPOUND WALL | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 158.74 | cum | - | - |
| 1.002 | OD51517/2026-2027:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 156.16 | cum | - | - |
| 1.003 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.95 | cum | - | - |
| 1.004 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 35.6 | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,046.64 | kilogram | - | - |
| 1.006 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 74.24 | sqm | - | - |
| 1.007 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 74.24 | sqm | - | - |
| 1.008 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 600 | per Letter per cm height | - | - |
stage.html
html • 0.03 MB
finance_1471833.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd60.pdf
Tender Documents • 1.73 MB
BOQ_1471833.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .