| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 LRejected-Technical KERALA KL | L1 | Rejected-Technical Agreement executed by L1 bidder | |
| 2 | L2₹29.0 L+₹1.7 L (6.06%)Rejected-Technical | L2 | Rejected-Technical Agreement executed by L1 bidder | |
| 3 | L3₹29.9 L+₹2.5 L (9.28%)Rejected-Technical | L3 | Rejected-Technical L1 Bidder Executed the agreement | |
| 4 | L4₹30.3 L+₹3.0 L (10.9%)Rejected-Technical PARATHODUVIL HOUSE NADUVATTOM PO KUTTIPPURAM MALAPPURAM | KUTTIPPURAM | MALAPPURAM | KERALA | L4 | Rejected-Technical Agreement executed byL1 bidder | |
| 5 | L5₹30.8 L+₹3.4 L (12.5%)Rejected-Technical | L5 | Rejected-Technical Agreement executed byL1 bidder |
| Sl No | Description | Qty | Unit | PURUSHOTHAMAN P. L6 | Mukundan P. L7 | C MUJEEB RAHIMAN L5 | P MOHAMMED ALI L4 | Sathyanarayanan L2 | RIYAS K V L3 | ABDULKAREEM P P L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CONCRETE ROAD AND SIDE PROTECTION WORKS | ||||||||||
| 1.01 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 321.02 | cum | 1,100 ₹3,53,122 | 1,200 ₹3,85,224 | 700 ₹2,24,714 Lowest | 890 ₹2,85,707.8 | 750 ₹2,40,765 | 1,000 ₹3,21,020 | 756.28 ₹2,42,781.26 |
| 1.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 12.99 | cum | 165.07 ₹2,143.76 | 165.07 ₹2,143.76 | 150 ₹1,948.05 | 165 ₹2,142.86 | 160 ₹2,077.92 | 160 ₹2,077.92 | 140.65 ₹1,826.57 Lowest |
| 1.03 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 120.5 | cum | 2,700 ₹3,25,355.4 | 2,600 ₹3,13,305.2 | 2,400 ₹2,89,204.8 | 2,300 ₹2,77,154.6 | 2,300 ₹2,77,154.6 | 2,250 ₹2,71,129.5 | 2,135.1 ₹2,57,283.46 Lowest |
| 1.04 | 60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 4.33 | cum | 2,700 ₹11,688.3 | 2,700 ₹11,688.3 | 1,800 ₹7,792.2 | 1,850 ₹8,008.65 | 1,850 ₹8,008.65 | 1,700 ₹7,359.3 | 1,644.41 ₹7,118.67 Lowest |
| 1.05 | 15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 4 | cum | 3,000 ₹12,000 | 3,000 ₹12,000 | 1,900 ₹7,600 | 1,750 ₹7,000 | 1,800 ₹7,200 | 1,600 ₹6,400 Lowest | 1,618.09 ₹6,472.37 |
| 2.00TREE CUTTING AND DRAINAGE WORKS | ||||||||||
| 2.01 | 9.7 : Laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapets | 10 | metre | 1,600 ₹16,000 | 1,500 ₹15,000 Lowest | 2,500 ₹25,000 | 2,500 ₹25,000 | 2,450 ₹24,500 | 2,300 ₹23,000 | 2,134.66 ₹21,346.56 |
| 2.02 | 2.3.A.1 : Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) Girth above 300 mm to 600 mm | 10 | each | 2,000 ₹20,000 | 2,000 ₹20,000 | 380 ₹3,800 | 350 ₹3,500 | 380 ₹3,800 | 350 ₹3,500 | 325.08 ₹3,250.82 Lowest |
| 2.03 | 11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20 | 33.64 | cum | 7,200 ₹2,42,179.2 | 7,300 ₹2,45,542.8 | 7,840 ₹2,63,706.24 | 7,000 ₹2,35,452 | 7,300 ₹2,45,542.8 | 7,300 ₹2,45,542.8 | 6,656.36 ₹2,23,893.24 Lowest |
Tender Value
Refer Docs
EMD Value
₹48,400
Closing Date
10 Feb 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
O/O Executive Engineer Malappuram Ponnani
New road formation
2021_HED_410518_1
156/HED/EEM/2020-21
Open Tender
Civil Works - Roads
Item Rate
240 days
Purathur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹48,400
Yes
12 Feb 2021
1 Feb 2021
12 Feb 2021
1 Feb 2021
10 Feb 2021
3 Feb 2021
1 Feb 2021 - 3 Feb 2021
60 days
stage.html
html • 0.03 MB
tech_eval.pdf
finance_583342.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .