Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SHEESHMAHAL KATHGODAM ALMORA | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical DURGA CITY CENTER BHOTIYA PAARAW HALDWANI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
Closing Date
23 Sept 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, EDD, Almora
EDD, Laxmeshwar, Almora
Voltage improvement, Fixing of 63 KVA T/F
2021_UPCL9_36107_1
51/2021-22/EDD(A)
Open Tender
Electrical Works
Item Wise
365 days
Bhaisiyachana Section under EDSD 2nd
As per tender document
2 documents required · 2 mandatory
₹295
Executive Engineer, EDD, Almora
Exempted
16 Nov 2021
3 Sept 2021
24 Sept 2021
3 Sept 2021
23 Sept 2021
3 Sept 2021
90 days
Amount
Cartage of ST Pole from store centre to construction site with Loading, Unloading at both points and proper stacking. Lead Distance 42 km SP-23
Cartage of other small material by vehicle from store centre to nearest construction site store including Loading and Unloading at both ends.LEAD DIST. 42 KM
Head load cartage of following Poles from road to site, lead distance 4 km. ST Pole SP-23
Head Load Cartage of Small materials including loading and unloading, lead distance 4 km
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.765x13=9.945cum)
Erection of following Single Support Pole of SP-23 in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual.
Erection of following Double Support Pole of SP-23 in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual.
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.(0.191*15=2.865)
Muffing of poles size 0.45x0.60 cm radious with cc 1:3:6 block size 45 cm height from ground level including cost of cement, stone and sand etc.
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.432x20=11.34 cum) (old & new)
Fixing, Tightneing and nozzling of stay with pole and stay rod on required tension as per drawing/RESPO Norms.
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual. (0.108X20=2.16)
Fabrication of MS Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESPO shedule and local approved drawing
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of of MS earth rod to proper depth and connecting the earth electrode with the help of GI wire as per RESPO Manual.
Dismentaling of existing HT Line, including disc fitting, insulator, clamps, Nut & Bolts. Single Pole SP-23
Dismentaling of existing HT Line, including disc fitting, insulator, clamps, Nut & Bolts. Double Pole SP-23
Lopping/Chopping of Tree Branches for Root Clearence
Laying, Spreading, Stringing & Sagging of 11KV Line in 3 Phase(3 phase 4 wire) of the following wire as phase wire GI earh wire complete including fixing of all accessories in 3 nos conductor in parallel with binding and jumpering as per profile and sagging chart. ACSR Rabbit
Cartage of ST Pole from store centre to construction site with Loading, Unloading at both points and proper stacking. Lead Distance 42 km ST Pole SP-10
Cartage of ST Pole from store centre to construction site with Loading, Unloading at both points and proper stacking. Lead Distance 42 km ST Pole SP-21
Cartage of other small material by vehicle from store centre to nearest construction site store including Loading and Unloading at both ends.
Head load cartage of following Poles from road to site. Lead Distance 4 km ST Pole SP-10
Head load cartage of following Poles from road to site. Lead Distance 4 km ST Pole SP-21
Head Load Cartage of Small materials including loading and unloading. Lead Distance 4 km
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. ST Pole SP-10(0.718x14=10.052)
Excavation of earth of pole pit of size 0.9x0.6x1/6 of full length of pole for errection of pole in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. ST Pole SP-21(0.765X9=6.885)
Erection of following Single Support Pole in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual. ST Pole SP-10
Erection of following Single Support Pole in Proper level and alignment along with fixing of all accessories, like top channel & clamps as per RESPO construction manual. ST Pole SP-21
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual. ST Pole SP-10(0.178x14=2.492)
Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual. ST Pole SP-21(0.191X9=1.719)
Muffing of poles size 0.45x0.60 cm radious with cc 1:3:6 block size 45 cm height from ground level including cost of cement, stone and sand etc.
Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all type of soil including dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (0.432x12=5.184 cum)
Fixing, Tightneing and nozzling of stay with pole and stay rod on required tension as per drawing/RESPO Norms.
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual.
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of of MS earth rod to proper depth and connecting the earth electrode with the help of GI wire as per RESPO Manual.
Dismentaling of existing LT Line, including insulator, clamps, Nut & Bolts.ST Pole SP-10
Dismentaling of existing LT Line, including insulator, clamps, Nut & Bolts. ST Pole SP-21
Laying, Spreading, Stringing & Sagging of LT lines of the following wire as phase wire GI earh wire complete with binding and jumpering as per RESPO Norms. 3 phase 4 wire
Laying, Spreading, Stringing & Sagging of LT lines of the following wire as phase wire GI earh wire complete with binding and jumpering as per RESPO Norms. 1 phase 2 wire
Cartage of the following capacity of transformers from store centre to construction site with loading and unloading at both points T/F 11/0.4 KV 63 KVA
Cartage of other small material by vehicle from store centre to nearest construction site store including Loading and Unloading at both ends. Other small materials
Head Load Cartage of Small materials including loading and unloading.
Head load cartage of following transformers along with loading/unloading at both points. T/F 11/0.4 KV 63 KVA
Mounting/Fixing of Fuse set on double pole structure including making of connection complete work
Mounting/Fixing of Lightning arrestor set (3 nos.) on Double pole structure including making all connections by GI strip size 35x6 mm to earth point(including cost of GI Strip).
Installation of new transformer on Double pole struture plinth and fixing of channel etc. and making all connection of HT and LT side and its complete commissioning. 63 KVA
Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contrector), connecting the same with GI strip(to be supplied by contrector) of size 35x6mm for a minium length 6m, treatment of soil with highly conductive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in MB before and after installation of earthing . The earth resistance after earthing should be less then 1 Ohm.
Earthing of support with MS earth rod of 2.5 mtr long by hammaring of of MS earth rod to proper depth and connecting the earth electrode with the help of GI wire as per RESPO Manual.
Laying and errection of LT PVC Cable including crimping of lugs of size 1x70 sqmm(including cost of material)
Providing and fixing of danger Board complete by providing clamps of MS Flat 50x6mm and nuts & bolts, Danger Boards of MS Sheet 2 mm thick 11''x7'' size (including cost of all material).
sai light house
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .