| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹60.0 L+₹29,931 (0.50%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹74.5 L+₹14.7 L (24.6%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S AYCON L1 | LAKWA STEEL CONSTRUCTION L2 | SILVERLINE INTEGRITY SERVICES L3 |
|---|---|---|---|---|---|---|
| 1.00Corrosion Monitoring & CP System Monitoring and Preventive Maintenance of CPPSM/TRU -Monthly • Measurement, observation, recording and reporting of operating parameters of TR unit, alarms, feeding & draining potentials, energy meter & hour meter readings etc. • Checking of control cards, panel meters, switches, earthing connections, power supply, cable lugs, terminal plates etc. • Cleaning of TR unit, CP room and surroundings using vacuum cleaner. • An annual performance test and yearly maintenance of the TR units ( Nos. of Total TRU : 17 ) shall be performed through the authorized service engineer as approved by EIC during the 3rd quarter of each year. No separate payment shall be made against this item. • The performance test and maintenance shall include, Performance of the unit on Auto and Manual modes, No load and Full load test, Meter Calibration, Converter module calibration, PSP Control Module Calibration, Indicator checks, Circuit resistance across Anode and Pipe, Checking of Permanent reference cell etc. and submission of final report about the health of the Unit with modifications and repairing required to be carried out. | ||||||
| 2.00 | Lepetkata | 312 | EA | 9,660 ₹30,13,920 | 9,700 ₹30,26,400 | 4,000 ₹12,48,000 Lowest |
| 3.00 | Duliajan | 48 | EA | 9,660 ₹4,63,680 | 9,700 ₹4,65,600 | 4,500 ₹2,16,000 Lowest |
| 4.00 | Tiloi (SV-3) for 4.5" LLPL | 24 | EA | 9,660 ₹2,31,840 | 9,700 ₹2,32,800 | 4,500 ₹1,08,000 Lowest |
| 5.00 | Railway Siding for 20" Naphtha Pipeline | 24 | EA | 9,660 ₹2,31,840 | 9,700 ₹2,32,800 | 4,500 ₹1,08,000 Lowest |
| 6.00PSP Monitoring and Maintenance at TLP (Test Lead Points)- Quarterly • Measurement, observation, recording and reporting of ON and OFF Pipe to Soil Potential (PSP) carrier pipe, casing, protected & unprotected sides of insulation joint/flange, foreign pipelines, anode potential, anode current wherever anodes are installed, current readings in CJB using standard Cu/CuSO4 reference cell and data logger at all test stations. • Checking and cleaning of spark gap arrestors across IJ/IF, surge diverters etc. installed. • Checking of cable lugs, ferrules, terminal plate, nut & bolts and maintaining them in good condition and replacement of same if found faulty. • Cleaning of test stations with brush and duster cloth and lubrication of test station door hinges and locks with grease or oil. • Clearing of 20 m wide ROU strip by cutting & uprooting of trees, bushes and shrubs etc.in 2 (two) metre length on each side of TLP. • Based on the monitoring, the contractor shall give clear cut detailed recommendations establishing reason to mitigate the defects or to maintain PSP within limit. • The contractor shall check positive potential swing of 100mV or more which shall indicate presence of interference situation. | ||||||
| 7.00 | 18" Dia Lepetkata - Dulijan Pipeline (Twin), 48 KM long | 432 | EA | 70 ₹30,240 | 30 ₹12,960 Lowest | 300 ₹1,29,600 |
| 8.00 | 36" and 18" Dia OIL, Duliajan - BCPL, Dulijan Pipeline (Twin), 1.4 KM long | 16 | EA | 70 ₹1,120 | 30 ₹480 Lowest | 300 ₹4,800 |
| 9.00 | 4.5" Dia Lepetkata - Lakwa Pipeine, 48 KM Long | 496 | EA | 70 ₹34,720 | 30 ₹14,880 Lowest | 300 ₹1,48,800 |
| 10.00 | 24" Dia ONGC, Lakwa - BCPL,Lakwa Pipeine(Twin), 2.3 KM Long | 112 | EA | 70 ₹7,840 | 30 ₹3,360 Lowest | 300 ₹33,600 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
3 Sept 2020, 2:30 pmClosed
Samrat Dutta
Brahmaputra Cracker and Polymer Limited, C and P Department, Administrative Building, PO_Lepetkata, Dist_DIBRUGARH, Assam, Pin Code_786006
Please refer Tender documents.
2020_BCPL_578159_1
BCPL/CNP/LE20W071SD/01453
Open Tender
Miscellaneous Services
Lump-sum
730 days
Please refer Tender documents.
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.7 L
Yes
Brahmaputra Cracker and Polymer Limited
24 Sept 2020
19 Aug 2020
4 Sept 2020
19 Aug 2020
3 Sept 2020
19 Aug 2020
24 Aug 2020
Amount
Corrosion Monitoring & CP System Monitoring and Preventive Maintenance of CPPSM/TRU -Monthly • Measurement, observation, recording and reporting of operating parameters of TR unit, alarms, feeding & draining potentials, energy meter & hour meter readings etc. • Checking of control cards, panel meters, switches, earthing connections, power supply, cable lugs, terminal plates etc. • Cleaning of TR unit, CP room and surroundings using vacuum cleaner. • An annual performance test and yearly maintenance of the TR units ( Nos. of Total TRU : 17 ) shall be performed through the authorized service engineer as approved by EIC during the 3rd quarter of each year. No separate payment shall be made against this item. • The performance test and maintenance shall include, Performance of the unit on Auto and Manual modes, No load and Full load test, Meter Calibration, Converter module calibration, PSP Control Module Calibration, Indicator checks, Circuit resistance across Anode and Pipe, Checking of Permanent reference cell etc. and submission of final report about the health of the Unit with modifications and repairing required to be carried out.
Lepetkata
Duliajan
Tiloi (SV-3) for 4.5" LLPL
Railway Siding for 20" Naphtha Pipeline
PSP Monitoring and Maintenance at TLP (Test Lead Points)- Quarterly • Measurement, observation, recording and reporting of ON and OFF Pipe to Soil Potential (PSP) carrier pipe, casing, protected & unprotected sides of insulation joint/flange, foreign pipelines, anode potential, anode current wherever anodes are installed, current readings in CJB using standard Cu/CuSO4 reference cell and data logger at all test stations. • Checking and cleaning of spark gap arrestors across IJ/IF, surge diverters etc. installed. • Checking of cable lugs, ferrules, terminal plate, nut & bolts and maintaining them in good condition and replacement of same if found faulty. • Cleaning of test stations with brush and duster cloth and lubrication of test station door hinges and locks with grease or oil. • Clearing of 20 m wide ROU strip by cutting & uprooting of trees, bushes and shrubs etc.in 2 (two) metre length on each side of TLP. • Based on the monitoring, the contractor shall give clear cut detailed recommendations establishing reason to mitigate the defects or to maintain PSP within limit. • The contractor shall check positive potential swing of 100mV or more which shall indicate presence of interference situation.
18" Dia Lepetkata - Dulijan Pipeline (Twin), 48 KM long
36" and 18" Dia OIL, Duliajan - BCPL, Dulijan Pipeline (Twin), 1.4 KM long
4.5" Dia Lepetkata - Lakwa Pipeine, 48 KM Long
24" Dia ONGC, Lakwa - BCPL,Lakwa Pipeine(Twin), 2.3 KM Long
24" Dia Raw Water Pipeline (Lepetkata - Burhiding River Intake point, 6.2 KM Long)
28" Dia Effluent Treated Pipeline (Lepetkata - Diffuser Point in Brahmaputra River, 17.5 KM Long)
20" Dia Naphtha Pipeline (Lepetkata - Railway Siding, 5.2 KM Long)
BCPL Plant Premises , Lepetkata for fire water pipeline and cooling water pipeline
AJB Monitoring & Maintenance - Half Yearly / # Yearly • Measurement, observation, recording and reporting of current discharge of each anode and adjusting resistor settings accordingly to make current discharge of all anodes equal. • Measurement of earth resistance of each anode and total bed using Wenner 3 pin method using Digital Earth Resistance Measuring Device. • Checking of shunts, resistors, cables lugs, ferrols, terminal plate, nut & bolts, AJB door hinges, locks etc and maintaining in good condition. • Changing of all rusted/faulty shunts, resistors, cables lugs, ferrols, terminal plate, nut & bolts, AJB door hinges, locks etc
Lepetkata
Duliajan
Tiloi (SV-3) for 4.5" LLPL
Railway Siding for 20" Naphtha Pipeline
# Cooling Water Pipeline and Fire water line Lepetkata
Monitoring and Maintenance of ER Probe - HALF YEARLY Data retrieval tool to be maintained/arranged by the party, Down Load the Data of the ER Probe and submit the report with analysis.
18" Dia Rich Gas Pipeline at Lepetkata
18" Dia Lean Gas Pipeline at Duliajan
4.5" Dia C2 + Liquid HydrocarbonPipeine at Lepetkata
28" Dia Effluent Treated Pipeline (Lepetkata - Diffuser Point in Brahmaputra River, 17.5 KM Long)
20" Dia Naphtha Pipeline (Lepetkata - Railway Siding, 6 KM Long)
Monitoring and Maintenance of CTSU - HALF YEARLY
18" Dia Lepetkata - Dulijan Pipeline (Twin), 48 KM long
4.5" Dia Lepetkata - Lakwa Pipeine, 48 KM Long
24" Dia Raw Water Pipeline (Lepetkata - Burhiding River Intake point, 6.2 KM Long)
28" Dia Effluent Treated Pipeline (Lepetkata - Diffuser Point in Brahmaputra River, 17.5 KM Long)
20" Dia Naphtha Pipeline (Lepetkata - Railway Siding, 6 KM Long)
Sypply & Installation of TLP Supply, installation, testing and commissioning of new test station, includes providing foundation, applying painting one coat (75 micron) of high build epoxy primer and two coats (50 microns each) of high build epoxy enamel paint, other accessories, cable gland lugs, conduits as required to make the installation complete as per specification, drawing and instruction of Engineer - In - Charge to complete the work in all respect for all pipelines of BCPL in Dibrugarh and Sivasagar Districts along the pipeline ROU.
Complete TLP with New Foundation: This will included shifting cable from old TS (Test Station) to New TS to Complete the work in all respect
TLP Post & Box on Existing Foundation: On existing foundation, this will included removing of old TS box & Post, and fixing new TS box with terminal plate & Post re-termination of Cables to Complete the work in all respect
TLP Box: Only Test Station Box with terminal plate. This will include removing of old TS box, and fixing new TS box, re-termination of cables to complete the work in all respect.
Painting of TLP/AJB/CJB/CPPSM/TRU etc.
This includes Surface preparation using metal wire brush, sand paper, removing dust,grease, scales, cleaning with lint free cloth, applying painting one coat (75 micron) of high build epoxy primer and two coats (50 microns each) of high build epoxy enamel paint incluing supply of all weather Paint of Asian, Burger, Shalimar, Jonson & Nicolson or EIC Approved brand, metal brush, sand paper, all tools and tackels as per direction of EIC to complete the work in all respect.
Supply & Laying of Diff Size of Cables Supply, cutting to right sizes, laying, testing and commissioning of different sizes of cables (PE Sheathed, PVC Insulated GI armoured, copper cables , annealed, high conductivity, stranded, tinned,600/1100 V grade), including making connection in both end, including supply of cable gland, lugs etc. (Except cable to pipe connection) excavation, sand padding of 150 mm below and above cable, laying of bricks above sand, laying of cable warning PE sheet at 0.6 meter depth , backfilling , supply and installation of cable markers at every 50 meter etc., as per drawing specification and instruction of EIC to complete the job in all respect.
1CX25MM2 Cu PE PVC Armoured
1CX10MM2 Cu PE PVC Armoured
1CX6MM2 Cu PE PVC Armoured
1 C X 4MM2 Cu PVC Armoured
1C X 50MM2 Cu PVC Armoured
Supply, Installation of Solid Cu/CuSO4 State Permanent Ref Cell Supply, installation, testing and commissioning of Solid State Cu-CuSO4 Permanent Reference Cells with min. 10meter lead cable, as per drawing, specification, and direction of Engineer- In-Charge. Work includes excavation of trench, backfilling and connection of cable etc. as per drawing specification.
Making Pipe to Cable Connection Making pipe to cable connection on running pipe as per approved procedures (including encapsulation of pipe to cable connection), drawing, specification and direction of Engineer-In –Charge, including supply of consumable, process material, excavation for exposing pipe, backfilling, etc. for satisfactory completion of work. The work shall also be include holiday checking with Brush type Holiday Detector, CAD welding/ Pin Brazing operation at 20 KV as per drawing specification and instruction of EIC to complete the job in all respect.
1C Upto 10 mm2 cable
1C from 25-50 mm2 cable
Supply & Installation of Zn Anode / Zinc Grounding cell Supply, Installation, Testing, Commissioning of pre-package Zn Grounding cell of 22KG , complete in all respects including labor, tools tackles and consumables etc. along with required length of 25 mm2 single core stranded tined copper cable PE Sheathed / PVC Insulated cable as tale cable, as per drawing specification and direction of EIC to complete the job in all respect.
Supply & Installation of Mg Anode Supply, Installation, Testing, Commissioning of pre-package Mg Anode as per weight desired, complete in all respects including labor , tools tackles and consumables etc. along with required length of tale cable (Approx. 10 meter) of 10 mm2 single core stranded tined copper 600 / 1100 V grade Un-Armoured cable PE Sheathed / PVC Insulated cable as tale cable, as per drawing specification and direction of EIC to complete the job in all respect.
Data Loging along PL for 24 Hrs Data logging along the pipeline as per requirement for 24 Hrs. including arrangement of data logger, Half Cell, technician labor tools & tackles and consumables, as per direction of EIC to complete the job in all respect.
Excavation & Backfilling along the Pipeline Excavation & backfilling along the pipeline for Inspection of pipeline Coating or any other purpose in all types soils, hard murum shoring, strutting & dewatering (if necessary) as per direction of E.I.C to complete the job in all respect.
Providing Manpower for CP Activity Providing Manpower for different type of CP activities / Pipeline related activities etc.
Skilled Man Power
Semi Skilled Man Power
Un-Skilled Man Power
Monitoring and Maintenance of Battery Banks in SV Stations -Monthly Monitoring and Maintenance of Battery Banks in SV Stations includes the Cleaning of Battery Terminals, topping up battery cell by DM Water, recording of the Cell Voltage & Specific Gravity. All material consumable tools including Hydrometer, DM Water etc in the scope of Contractor. Quality of DM water is to be supported by lab test report.
18" Dia Lepetkata - Dulijan Pipeline (Twin), 48 KM long
4.5" Dia Lepetkata - Lakwa Pipeine, 48 KM Long
Electrical Maintenance Jobs at 6 SV Stations - Monthly basis Maintenance job of overall Electrical system for pipeline inclusding SV Stations - testing, rectification and replacement of defect exhaust fans, light fitting & fixtures (both indoor & outdoor), JBs which includes electrical wiring where ever required both for power & lighting points. Upkeep and maintenance of UPS, Battery charger etc - Cable jointing of differenct sizes if any,- Up keep & maintenance of Power Lines (HT/LT lines), PDB & LDB, JBs , Split AC, Tube light, Led Bulbs, etc. The details are in the scope of work or as per EIC direction to complete the job in all respect.
ROU WASHOUT RESTORATION WORKS:
Earth filling from brought out earth (excluding rock) in trenches, open pits, over pipeline trenches etc. as per scope of work.
Providing and laying in position empty HDPE cement bags filled with cement sand in the ration 1:10 (1 cement:10 coarse sand) as per scope of work.
Providing and laying in position earth filled HDPE cement bags as per scope of work
Random rubble masonry with hard stone in foundation / Superstructure in cement mortar 1:6 (1 cement: 6 coarse sand) as per scope of work.
MISCELLANEOUS ROU /SV MAINTAINENACE WORK: Clearing of 20 m wide ROU strip by cutting & uprooting of trees, bushes and shrubs etc. in running length as per scope of work.
FORMATION OF BUNDS FOR WASHOUT REPAIR AS PER SITE CONDITIONS & SCOPE OF WORK.
Earth work in foundation trenches not exceeding 1.5 m in width or 10 sqm on plan all kind of soil as per scope of work.
Providing and placing in position Cement Concrete: 1: 4: 8.as directed by EIC. Detail as per scope of work.
PIPELINE REPAIRING/MODIFICATION WORK at various locations/terminals as per scope of work for BCPL Pipelines.
Repair of Pipeline leakages/dent within 06-08 hrs of Terminal shutdown as per scope of work.
Repair of Pipeline leakages/dent without terminal shutdown during normal operation as per scope pf works.
Supply of nitrogen gas cylinders(55kg,150bar,7 cubic mtr.) as per scope of work.
LOCATING OF BCPL PIPELINE AS PER SCOPE OF WORK. LOCATING of BCPL PIPELINE with pipeline locator and by person with manual digging at various locations along pipelines with maximum length not exceeding 50mtr. in each case, as per scope of work.
COATING REPAIR OF UNDERGROUND PIPELINE AS PER SCOPE OF WORK.
Coating repair using Cold Applied tapes. Detail as per scope of work.
Coating repair using Denso tape as per scope of work.
Monitoring of Earth Pits - Half Yearly • Measurement, observation, recording and reporting of earth resistance of earth pit and grid using Wenner 3 pin method using Digital Earth Resistance Measuring Device. • Numbering the Earth Pit and wirting the next due date on the cover of Earth Pit with Paint. • Removing debris if any in the earth pit and watering. • Physical & functional checking of all Earth pits, associated cables/connections. • Cleaning of all connections and greasing them with replacement of brass nut, bolts if found damaged or missing. Jointing of earth cable if found open circuited, disconnected / damaged. • Proper cleaning & house-keeping inside & surrounding of the earth pit.
18" Dia Lepetkata - Dulijan Pipeline (Twin), 47 KM long
4.5" Dia Lepetkata - Lakwa Pipeine, 47 KM Long
24" Dia Raw Water Pipeline (Lepetkata - Burhiding River Intake point, 6.2 KM Long)
28" Dia Effluent Treated Pipeline (Lepetkata - Diffuser Point in Brahmaputra River, 17.5 KM Long)
20" Dia Naphtha Pipeline (Lepetkata - Railway Siding, 6 KM Long)
Maintenance of Earth Pits Pouring of common salt (appx 25 kg, water (appx 200 liters) & soil reactivation compound (appx. 10 kg) or as per requirement to bring down the earth resistance within limit including raising the heigts of civil foundation , repair of cement plastering and all other activities cover monitoring of Earth pit.All consumables, materials required for the above said jobs will be in contractor’s scope.
Supply, Installation, Testing of GI Pipe Earthing Station GI Pipe Earthing Station: Supply, assembling, installing, testing and commisioning with all the items for constructing GI earthing pipe size 75 mmX 5 mm thick (minimum 4.5 mtr.deep) GI funnel with stainless steel hinged door on steel frame(300X300mm) to cover up the watering pit, minimum 50 Kg salt, minimum 100kgs of fine charcoal powder, earthing conductor size 25mm X 3mm GI flat from pipe to the ground level, required hardware and miscellaneous item. The work involves digging pit on the soil, burying the earth electrodes in the mixture of common salt and charcoal, connecting earthing conductor to earthing electrode, backfilling the soil and constructing the watering pit with brick peripheri, preparing the earth-pit chamber or any cosumables required to complete the job will be in contractors scope, at the site as specified and details as per the direction of EIC.
Supply & Laying of GI pipe 100mm NB Supply and laying og GI pipes "B" class of following sizes in required length fixed on steel, concrete or similar structure, above ground, or laid in trenches, ready to be buried in concrete, including cutting, threading, bending and similar works, supply of clamps, small iron structures, spacers and installation of seats, plugs, bushings etc. small civil works, including all manpower, materials and tools as per approved drawings, specifications of the tender and directions of EIC. 100mm NB
Supply, Installation , Connection of 25X3 mm GI Earth Strip Supply, installation and connection of following GI earth strip along the ready cable trenches os cable trays or fixing on walls or structures including welding at joints, providing anti-corrosive paint or bitumen and jute covering for welded portion, clamping and all necessary hardware for connecting etc., including all labour and tools, as per approved drawings, specifications of this tender and directions of Engineer-in-Charge. 25X3 mm
Supply and installation of explosion proof spark gap/Surge arrestor Supply and installation of explosion proof spark gap/Surge arrestor of DEHN ExSG4/equivalent make across insulating joint for BCPL including required cable 25 Sq. mm CU. Bugs, nuts, bolts, labour, tools & tackles and consumables
TR unit spare parts / Mandatory spare of Raychem Make / equivalent
Panel Meter (AC/DC) (230V-415V / 0V-50V, PSP)
Control Card RRL-103A
Control Card RRL-104C1
Control Card RRL-105D1
Control Card RRL-106
Mother Board RRL-MB01
Lighting Arrestor
Supply of Rubber Mat as per direction Scope of Work.
Supply, Installation, Testing, Commissioning of pre-package Zn grounding cell Supply, Installation, Testing, Commissioning of pre-packaged Zn grounding cell of 22KG, complete in all respect including labour, tools tackles and consumables etc. along with required length of 25mm2 single core stranded tined copper cable PE Sheathed/ PVC insulated cable as tale cable, as per drawing specification and direction of EIC to complete the job in all respect.
Cable joint/ reapiring of underground cable Cable jointing/ repairing of underground cable as per approved procedure including excavation and back filling cable jointing by cable jointing kit (Raychem/equivalent) Termination and identification of cable. Supply of cable jointing kit and other consumables, labour, tools and tackles, copper sleeves, heat sink, ferrule etc. for 4mm sq., 6 sq. mm, 10mm sq., 25 sq. mm & 50 sq.mm. XLPE armoured copper cable as per scope of work, specification and direction of EIC
Repainting & relettering of existing various types of markers as per scope of work
Warning Marker
Direction Marker
Kilometer Marker
Aerial Marker
Boundary Pillar
Supply & Installation of various types of markers at designated location/Chainage as per scope of work.
Warning Marker
Direction Marker
Kilometer Marker
Aerial Marker
Boundary Pillar
• DG Trial Run, Routine check and correction if required in 6 Nos. SV Stations Actual run of DG set (30KVA) on monthly basis on existing maximum load of each 6 nos. of SV stations located at six different locations for 1 hr. which also includes checking of overall health of DG set for smooth running of DG set as and when required.
• Supply of diesel (as required) Supply of diesel as and when required.
• C-check maintenance as per OEM recommendation details as below: 1. Checking of air cleaner / replacement (if required) 2. Cleaning of fuel tank / draining sediments / filter replacement (if required) 3. Checking of coolant level / top up / replacement (if required) 4. Cleaning of Radiator 5. Checking of fan hub 6. Checking of alternator / starter 7. Checking of fuel pump / calibrate (if required) 8. Checking of all parameters indicators and replacement of faulty display if required. 9. 1 hour actual run of DG set on full load.
• Supply of consumables required for C-check for one 30KVA DG set details as below: 1. Coolant as per OEM 2. Air filter as per OEM 3. Lube oil Filter as per OEM 4. Lube oil as per OEM 5. Gear oil as per OEM 6. Fuel filter as per OEM 7. connecting tube if required etc.
LAKWA STEEL CONSTRUCTION
SILVERLINE INTEGRITY SERVICES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .