Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC | ₹14.1 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹14.6 L+₹44,770 (3.17%)Rejected-AOC 403 GH MANSADEVI COMPLEX PANCHKULA 134109 HARYANA | PANCHKULA | HARYANA | 134109 | ₹14.6 L+₹44,770 (3.17%) | L2 | Rejected-AOC OTHER THAN L1 |
| 3 | L3₹14.7 L+₹61,095 (4.32%)Rejected-AOC | ₹14.7 L+₹61,095 (4.32%) | L3 | Rejected-AOC OTHER THAN L1 |
| 4 | L4₹18.3 L+₹4.2 L (29.7%)Rejected-AOC | ₹18.3 L+₹4.2 L (29.7%) | L4 | Rejected-AOC OTHER THAN L1 |
| 5 | L5₹18.4 L+₹4.3 L (30.2%)Rejected-AOC 99 MODEL TOWN PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹18.4 L+₹4.3 L (30.2%) | L5 | Rejected-AOC OTHER THAN L1 |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
3 Apr 2021, 6:00 pmClosed
CWE YOL CANTT
HQ CWE YOL CANTT
PROVN OF OXYGEN GAS PIPE LINE SYSTEM AT MH UNDER GE (KH) YOL
2021_MES_428621_1
CWE/Y-129/2020-21
Open Tender
Civil Works
Works
180 days
YOL Cantt
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (KH) Yol
₹35,000
20 May 2021
6 Mar 2021
5 Apr 2021
6 Mar 2021
3 Apr 2021
22 Mar 2021
Amount
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 8+8 OXYGEN MANIFOLD WITH COMPLETE REQUIRED NOSE, PIG TAIL PIPES (CE CERTIIFED/UL LISTED) (i) High Pressure copper pipes of size should be of ½’’id x 15swg. (ii) High Pressure brass fitting made of high tensile brass should be used. (iii) Flexible copper tail pipes with bull nose RH threads should be used to connect the gas cylinders to the header assemblies with non return valves of size 28mm hex single piece with O ring and made of as per OEM specification, isolation valve & manual regulator. (iv) High pressure flexible tail pipes should be made copper pipe. (v) Manifold should be tested hydraulically at 225 kg/cm2 Pressure & degreased for oxygen service and made of gun metal as per OEM specification. (vi) should be Supplied duly wrapped in a polythene bag pipes CE Certified as per specifications of size 9.50 mm x 6.20 mm and thickness should be as per OEM specification. (vii) 8+8 size of Oxygen manifold complete with 16 nose pig tail pipes CE Certified as per specifications of size 9.50 mm x 6.20 mm and thickness should be as per OEM specification. Make : MPS/ AKtiv/MR/MDD/MEC/FSI.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 8 CYLINDERS EMERGCY OXYGEN MANIFOLD WITH REQUIRED PIGTAILS (CE CERTIIFED/ UL LISTED) (i) High Pressure copper pipes of size should be of ½’’id x 15swg. (ii) High Pressure brass fitting made of high tensile brass should be used. (iii) Flexible copper tail pipes with bull nose RH threads should be used to connect the gas cylinders to the header assemblies with non return valves of size 28mm hex single piece with O ring and made of as per OEM specification, isolation valve & manual regulator. (iv) High pressure flexible tail pipes should be made copper pipe. (v) Manifold should be tested hydraulically at 225 kg/cm2 Pressure & degreased for oxygen service and made of gun metal as per OEM specification. (vi) Should be Supplied duly wrapped in a polythene bag. (vii) 8+8 size of oxygen manifold complete with 16 Nose pig tail pipes CE Certified as per specifications of size 9.50 mm x 6.20 mm and thickness should be as per OEM specification. Make : MPS/ AKtiv/MR/MDD/MEC/FSI. Make for oxygen Cylinder maruti, katso, HPCL, Everest, Kento, Euro, Rama Cylinder
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF FULLY AUTOMATIC OXYGEN GAS CONTROL SYSTEM AS PER (CE Certiifed) (i) Should be manufactured under an ISO 9001 : 2000 certified Works (ii) Gas control system should be fully automatic, self – shifting to reserve bank on exhaustion of the service bank without interruption of gas delivery to the system. (iii) Critical connections should be gas specific, non-interchangeable and should be designed to eliminate gas supply error. (iv) Control system should supply a flow of 1000 L/Min at 50 psi (v) The dual line regulator/single vent gas manifold control unit should include right left header bars and pig tails for the appropriate medical gas after the line regulator there should be provided relief valve mechanism for testing and servicing purpose. After line regulator there should be a provided relief valve mechanism for testing and servicing purpose. (vi) The installed system should automatically switch over to the reserve bank when the primary bank is depleted. Control panel should be provided inbuilt microprocessor system. (vii) When the depleted cylinders should replace with fully cylinders the system should automatically reset itself in preparation for the next bank change. (viii) The primary side bank in use and the remaining side bank on reserve. (ix) This designation should automatically change from left to right and right to left as each bank is depleted and in turn, refitted with full gas cylinders. (x) Control panel cover should be made of M.S Duly powder Coated. (xi) The LED indicator should show a depleted bank by turning red. (xii) A buzzer should also sound to indicate an empty bank. (xiii) When the system is reset by replacing the depleted cylinders, indicator should turn green and also silence the buzzer.
(xiv) The control panel incorporates three colour LED. Orange light for duty bank , green light for normal and standby condition and red light for low condition. (xv) at the time of bypass, system will be like this the there is no need for disturbing any setting of regulator. (xvi) Pressure switches will be Ce marked. (xvii) Normal and low indicator with test and mute switches will be operated. (xviii) The flow of gas will not stop at the time of failure of power. (xix) Control voltage will be supplied seprately for the safety of the solonied valves coil. Make : MPS/ AKtiv/MR/MDD/MEC/FSI.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TERMINAL / GAS OUTLET POINTS WITH PROBES AS PER (CE CERTIIFED/ UL LISTED) (a) OXYGEN (I) The Medical Gas Outlets will be combines ease of installation and low cost maintenance (II) The outlet will be Designed for economy, reliability, and durability, whilst offering the following features as standard. (III) The outlet will be Non- interchangeable self-dealing quick connect gas outlet of Oxygen. (IV) The outlet point will be Available for head wall units/wall. (V) The gas outlets will be accept direct (front) probe. (VI) Front fascia of gas outlets will be non-interchangeable and gas color coaded Secondary isolating valve allows the maintenance of the gas outlet will be without the need for a pipeline system shutdown. (VII) The outlet will be the second fix socket and valves assemblyis removable in – situ, form the front of the terminal unit without removal of the fascia plate. This feature saves considerable time in both installation and maintenance. (VIII) All outlets point should be required front insertion type with non return valve for easy maintenance including factory testing at 10 Kg/Cm2 and required cleaning, degreasing and proper testing as per medical standards. Make : MPS/ AKtiv/MR/MDD/MEC/FSI.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF OXYGEN FLOWMETER & HUMDIFIER BOTTLE (CE CERTIIFED/ UL LISTED) (I) Should be strong and reliable flow meter (II) Should offer the latest technical improvements for a precise measuring of the flow with +-5% accuracy. (III) Should be chrome plated brass body. (IV) Graduated flow tube and cover be made of polycarbonate & unbreakable. (V) Adjustable flow by needle valve (knob) with micrometrical Regulation & should be back pressure compensated. (VI) Standard flow 0-15 LPM inlet filter should be made of S.S Wire net. (VII) Humidifier bottle should be made of polycarbonate, and unbreakable. (VIII) Should be fully autoclavable at 121oc Make : MPS/ AKtiv/MR/MDD/MEC/FSI.
Copper pipe 22 mm outer dia, 0.9mm thick , medical Grade with fittings as per specification as per BSEN : 13348 KITE Marked. (i) All copper pipes should be KITE/LIOYED/ MEXFLOW/JAYNA/RAJCO for quality certification (ii) Should be confirming to BS: EN 13348 certified medical grade Pipe (iii) Installation of piping should be carried out as per international standard with utmost cleanliness. (iv) Pipe fittings and valves which have been degreased as per international standards should be used. (v) Pipe fixing clamps should be used up to 42 mm diameter pipes (vi) Pipes should be Non ferrous. (vii) Rigid metallic hanging or cemented supports should be used in the pipes of the size above 28mm (viii) The main lines to the building should be taken over head though metallic poles or through underground ducts. (ix) All pipes joints should be made using inert gas flux less brazing Method. (x) All joints should be of copper to copper and should be brazed by sliver brazing filler material without flux. (xi) Brazed joints should be continuously purged with oil free dry Nitrogen to prevent the formation of copper oxide on the inside surface of the joints. (xii) All pipes should be installed without springing or forcing. (xiii) All pipes should be protected against mechanical injury in a manner satisfactory to authorities having jurisdiction. (xiv) After erection, all the new pipes should be cleaned or purged with the help of dry nitrogen gas. (xv) Complete system should be tested with dry nitrogen at 2 times of working pressure for 24 hours.
(xvi) The supply of Cu pipes should be companied with manufacturers test certificate for the physical properties of copper pipes and their chemical composition. The supply of pipes be further sustained with inspection certificate form the third party like lloyds register. (xvii) The copper should be secured to wall with plastic saddle at distance of every 4-6 feet or to ceiling fixed MS bracket where ever necessary. (xviii) For copper to brass joints 43% silver brazin rods with flux should be used. (xix) All bends should be made of copper of higher dia than the pipe requiring change of direction and these bends will be made out of thicker size pipes to avoid thinning and flattening at any points.
Complete all as per srl item no 6 and 6.01 above but size of copper pipe shall be 15 mm outer dia , 0.9 mm thick
Complete all as per srl item no 6 and 6.01 above but size of copper pipe shall be 12 mm outer dia , 1.0 mm thick
SUPPLY, INSTALATION, TESTING AND COMMISSIONING OF ISOLATION BALL VALVES WITH BOTH SIDE END FITTING ALL AS PER OEM specification as well as directed by Engr-in-Charge of size :- Valve size : 15 mm Make : AKTIV/MR/LEGRIS/LADER/ZALOTO/ELEM
SUPPLY, INSTALATION, TESTING AND COMMISSIONING OF ISOLATION BALL VALVES WITH BOTH SIDE END FITTING ALL AS PER OEM specification as well as directed by Engr-in-Charge of size :- Valve size : 22 mm Note- for srl item no 09 and 10 (i) Full bore valve for minimum pressure lose (ii) 90 degree turn ball valve with PTEF seals suitable for copper pipe line. (iii) Tested with pipes line at 10 KG/Cm2 Make : AKTIV/MR/LEGRIS/LADER/ZALOTO/ELEM
AREA LINE PRESSURE ALARM CE CERTIFIED. MAKE MPS AKTIV/MR/MDD/MEC/FSI. The alarm panels (AAP) should be located for monitoring. (i) Floor indication (ii) Each O.T and Path lab (iii) ICU and path recovery (iv) Test function should be provided in the line pressure alarm system to the test audio-visual indicators. (v) On pressing the test button all the emergency indicators i.e the high and the low indicators. (vi) Should be start & glow glowing along with a beef alarm. (vii) This test should perform for 5 seconds and after that it Comes back to its previous position. (viii) Mute function should be provided with switch off the beep alarm whenever it blows, which allows the beep alarm to restart after 10 minutes of pressing the Mute button. (ix) Area line pressure alarm should be mounted on power coated MS box. Nuts and nipples are provided for connection with pneumatic supply line. Operated by 230 V AC power supply. Easy well mounting facility. (a) Area line Pressure upto 2 services
BED HEAD PANEL CE CERTIFIED MAKE MPS/MR/MDD/MEC/FSI SUPPLY & INSTALLATION AND COMMISSIONNING OF NEW EXTRUDED ALUMINUM BED HEAD PANEL WITH PROVISON OF GAS OUTLET, ELECTRICAL AND OTHER ACCESSORIRS (CE MARKED/ UL LISTED) (I) Horizontal Bed head panel made of good quality extrusion aluminum dully powder coated, modular design having length as per boq ability to hose gas outlet points. (II) Should be Easy to install and easy removal of covers for maintenance and Pipeline Connection. (III) Panel should have smooth surface and screws should not visible. (IV) Should be easy to install and easy removal of covers for maintenance and pipeline connection. (V) The panel should have smooth surface and screws should not be visible. (VI) The choice of color décor strip should be provided as per our requirement. (VII) Should be fitted with 04 Nos 5/15 amp. Electrical sockets.
EESSI
singh traders
M/S J N TRADERS
satpal and brothers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .