Loading…
Loading…
Tender Value
₹4.8 Cr
EMD Value
₹9.7 L
Closing Date
12 Oct 2026, 4:00 pm
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
Please refers to BOQ
2026_PWDJK_325573_1
e-NIT No.PWD/SE/KS/42 of 2026-27 Dated 21-09-2026
Open Tender
Civil Works - Roads
Percentage
730 days
KATHUA BILLAWAR
Please refers to NIT/SBD
5 documents required · 5 mandatory
₹6,000
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
₹9.7 L
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
22 Sept 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
12 Oct 2026
22 Sept 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 1.01 | All kinds of soil =70%. | 235.2 | cum | 187.3 | ₹44,052.96 |
| 1.02 | Ordinary rock=20%. | 67.2 | cum | 392.8 | ₹26,396.16 |
| 1.03 | Hard rock (Blasting prohibited)=10%. | 33.6 | cum | 1,128.75 | ₹37,926 |
| 2Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : | |||||
| 2.01 | a) All kinds of soil =70% | 117.6 | cum | 89.75 | ₹10,554.6 |
| 2.02 | Ordinary rock=20%. And Hard rock =10%. | 50.4 | cum | 161 | ₹8,114.4 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 8.4 | cum | 6,540.45 | ₹54,939.78 |
| 4Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improvework ability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately | |||||
| 4.01 | .All works upto plinth level | 188.4 | cum | 8,021.1 | ₹15,11,175.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_1100517.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .